Skip to main content

Power Technology and Engineering

Ausgabe 1/2004

Inhalt (11 Artikel)

First Filling of Storage at the Bureiskaya Hydropower Plant

A. S. Garkin, E. A. Ivleva, S. L. Atrashenok, I. I. Zagryadskii

Operational Reliability and Service Life of Station Steam Conduits of Active 800-MW Power-Generating Units

V. F. Zlepko, T. V. Perevezentseva, F. A. Khromchenko, T. A. Shvetsova, K. K. Kreitser

Process Control System of the Mutnovskaya Geothermal Power Plant

O. M. Idzon, V. V. Ivanov, V. V. Ilyushin, A. I. Nikol'skii

A Study of Electromagnetic Radiation of Corona Discharge Near 500-Kv Electric Installations

A. V. Korzhov, I. S. Okrainskaya, A. I. Sidorov, V. D. Kufel'd