Ausgabe 2/2014
Inhalt (15 Artikel)
Characteristics of the Amur Basin and Operating Regimes of the Zeya and Bureya Hydroprojects During Passage of the 2013 Flood
G. G. Lapin, A. N. Zhirkevich
Concept for Monitoring Life Cycle of Basic Water-Power Equipment
R. M. Khaziakhmetov, S. V. Fotin, N. V. Fotina
Remaining Service Life of Generating Sets and Replacement of Equipment
V. N. Baikov, É. U. Nezametdinov
Problems of Normalized and Methodological Substantiation of Evaluation of Strength and Remaining Service Life of Hydraulic Turbines
A. V. Sudakov, E. V. Georgievskaya
Domestic Boilers with Supercritical Steam Pressure: Status and Prospects1
A. N. Tugov, A. L. Shvarts, V. R. Kotler
Operating Characteristics of a 420-MW Combined Cycle Heat and Power Plant1,2
G. G. Olkhovsky, P. A. Berezinets, A. V. Ageev, V. N. Markina, I. A. Lobach, V. I. Kostenko
On the Scope of Computational-and-Experimental Evaluation of the Seismic Adequacy of NPP Equipment
A. D. Emel’yanova, A. P. Kaznovsky, P. S. Kaznovsky, K. G. Kas’yanov, S. I. Ryasnyi
Experience of Implementing a PGU-200 MW Two-Boiler One-Turbine Unit at the South-West CHP
A. V. Chugin, M. S. Tsvetkov, R. I. Kostyuk, K. V. Babkin, V. A. Bilenko, K. A. Molchanov, V. V. Fedunov, V. G. Razogreev
Wear Resistance of Coatings Using SHS-Technology Under Electric-Spark Alloying Conditions1
A. V. Belyakov, R. N. Kalugin, F. I. Panteleenko, B. B. Khina, V. V. Sarantsev
The Speed of Response of Controlled Shunt Reactors
A. N. Belyaev, S. V. Smolovik
A New Series of Turbogenerators of Low and Medium Capacity
V. D. Apevalov, V. N. Lesh, S. M. Meshalkin, E. A. Ustinova, V. G. Shalaev