Ausgabe 6/2005
Inhalt (10 Artikel)
Volga-Kama coordinated waterworks facilities (50 years after startup of the first generating set of the Kuibyshev hydropower plant)
A. E. Asarin, R. M. Khaziakhmetov
Experience of grouting works in the bed of the Bureya HPP dam
É. S. Argal, K. P. Kudrin, G. G. Tuzhikhin
Diversion tunnel of the Irganaiskaya waterworks facility and prospects of its use in the period of erection of the dam to intermediate levels
M. A. Abdurakhmanov, E. N. Bellendir, V. V. Kostin, A. A. Neikovskii, A. M. Shvainshtein
Vibration adjustment of high-power turbine sets at power plants
A. S. Lisyanskii, A. V. Nikolskii, M. I. Shklyarov, N. S. Lebed’ko, A. I. Kumenko, A. G. Suvorov, V. N. Borisov, A. P. Krasil’nikov, V. V. Shepitchak
Development of engineering solutions for creation of turbine plant for power unit with supercritical steam parameters
G. D. Avrutskii, I. A. Savenkova, M. V. Lazarev, V. V. Akulenko, A. L. Shvarts, S. A. Ivanov
Experience in the operation of the T-150-7.7 LMZ steam turbine under the conditions of the PGU-450 flow diagram
A. S. Lisyanskii, Yu. A. Radin
Main principles for construction of relay protection of 330–750-kV equipment with the use of microprocessor devices of series ShÉ2710
Yu. N. Alimov, A. K. Belotelov, K. M. Dobrodeev, A. I. Leviush, V. I. Pulyaev, Yu. V. Usachev, V. A. Feshchenko
Concept of transfer to repair of power plant turbogenerators according to their technical state
L. G. Mamikonyants, V. M. Nadtochii, Yu. N. Samorodov, O. D. Selivanov, S. V. Zhuravlev