Preliminary geological, geochemical and numerical study on the first EGS project in Turkey

Zeitschrift:
Environmental Earth Sciences > Ausgabe 11/2015
Autoren:
Zhengmeng Hou, Osman Şen, Yang Gou, Arif Mert Eker, Mengting Li, Gözde Pınar Yal, Selim Cambazoğlu, Patrick Were

Abstract

Geothermal energy is attracting more and more attention due to its large capacity and lack of dependency on the weather. Currently, many countries have planned enhanced geothermal system (EGS) projects. In this paper the first EGS project in Turkey, which is being implemented at the license area of SDS Energy Inc., in Dikili of the İzmir province, is introduced. Extensive geological, paleostress (279 fault-slip data from 33 locations), geophysical (magnetotelluric and vertical electrical sounding at 80 and 129 locations, respectively) and geochemical studies as well as paleostress measurements have been conducted in this area within the scope of this project. In the light of all these studies, it has been determined that the Dikili region is remarkable in terms of its high thermal gradient of about 7 °C/100 m. The geothermal reservoir formation “the Kozak granodiorite” is a homogeneous, crystalline volcanic rock mass with high radiogenic heat production, and suitable for an EGS application. The analysis shows that the dominating fault system is normal, and the corresponding primary stress regime is extensional. Based on the geological, geophysical surveys and the estimated in situ stresses, numerical studies were carried out to assess the results of the hydraulic fracturing and geothermal energy production using the numerical codes FLAC3Dplus and TOUGH2MP, respectively, in the area A of the Dikili site. The simulation results show that the stimulated reservoir volume and area could reach 44.5 million m3 and 1 km2, respectively, with an injection volume of 122,931 m3. Assuming the fractured zone has a height of 1000 m and a half-length of 1200 m (the distance between injection and production wells being 1000 m), an average overall geothermal capacity of 83.7 MWth in 20 years could be reached with an injection rate of 250 l/s. The injection strategy and design parameters of the reservoir stimulation and geothermal production will be further optimized with the project running.

Bitte loggen Sie sich ein, um Zugang zu diesem Inhalt zu erhalten

Sie möchten Zugang zu diesem Inhalt erhalten? Dann informieren Sie sich jetzt über unsere Produkte:

Springer Professional "Wirtschaft+Technik"

Online-Abonnement

Mit Springer Professional "Wirtschaft+Technik" erhalten Sie Zugriff auf:

  • über 69.000 Bücher
  • über 500 Zeitschriften

aus folgenden Fachgebieten:

  • Automobil + Motoren
  • Bauwesen + Immobilien
  • Business IT + Informatik
  • Elektrotechnik + Elektronik
  • Energie + Umwelt
  • Finance + Banking
  • Management + Führung
  • Marketing + Vertrieb
  • Maschinenbau + Werkstoffe

Testen Sie jetzt 30 Tage kostenlos.

Springer Professional "Technik"

Online-Abonnement

Mit Springer Professional "Technik" erhalten Sie Zugriff auf:

  • über 50.000 Bücher
  • über 380 Zeitschriften

aus folgenden Fachgebieten:

  • Automobil + Motoren
  • Bauwesen + Immobilien
  • Business IT + Informatik
  • Elektrotechnik + Elektronik
  • Energie + Umwelt
  • Maschinenbau + Werkstoffe​​​​​​​




Testen Sie jetzt 30 Tage kostenlos.

Literatur
Über diesen Artikel

Weitere Artikel der Ausgabe 11/2015

Environmental Earth Sciences 11/2015 Zur Ausgabe