Skip to main content
Erschienen in: Geotechnical and Geological Engineering 3/2020

24.01.2020 | Technical Note

Ranking and Evaluating the Coal Seam Mechanization Based on Geological Conditions

verfasst von: Reza Mikaeil, Ehsan Jafarnejad Gharahasanlou, Amir Jafarpour

Erschienen in: Geotechnical and Geological Engineering | Ausgabe 3/2020

Einloggen

Aktivieren Sie unsere intelligente Suche, um passende Fachinhalte oder Patente zu finden.

search-config
loading …

Abstract

Nowadays, in the coal mining industry, achieve to goals such as high production rates and efficiency with increasing safety and reducing production costs needs to using mechanized mining methods and advanced equipment. As case studies, Takht coal mine and Tazareh coal mine in north-eastern of Iran and Tabas coal mine in mid-Eastern Iran were selected. In total, 17 coal seams with the potential for mechanization from three mentioned mines were studied. In this present study in order to evaluating these coal mines potential of mechanization, important and influential factors such as seam inclination, seam thickness, roof strength, seam uniformity condition, seam extension, bearing capacity and water at the working face were investigated. In this study, it was tried to select the best seams between studied seams with potential for mechanization based on the mentioned factors, by using Preference Ranking Organization Method for Enrich Evaluation method. Finally, Tabas and K11 seam from Takht mine were selected as the top options for mechanization.

Sie haben noch keine Lizenz? Dann Informieren Sie sich jetzt über unsere Produkte:

Springer Professional "Wirtschaft+Technik"

Online-Abonnement

Mit Springer Professional "Wirtschaft+Technik" erhalten Sie Zugriff auf:

  • über 102.000 Bücher
  • über 537 Zeitschriften

aus folgenden Fachgebieten:

  • Automobil + Motoren
  • Bauwesen + Immobilien
  • Business IT + Informatik
  • Elektrotechnik + Elektronik
  • Energie + Nachhaltigkeit
  • Finance + Banking
  • Management + Führung
  • Marketing + Vertrieb
  • Maschinenbau + Werkstoffe
  • Versicherung + Risiko

Jetzt Wissensvorsprung sichern!

Springer Professional "Technik"

Online-Abonnement

Mit Springer Professional "Technik" erhalten Sie Zugriff auf:

  • über 67.000 Bücher
  • über 390 Zeitschriften

aus folgenden Fachgebieten:

  • Automobil + Motoren
  • Bauwesen + Immobilien
  • Business IT + Informatik
  • Elektrotechnik + Elektronik
  • Energie + Nachhaltigkeit
  • Maschinenbau + Werkstoffe




 

Jetzt Wissensvorsprung sichern!

Literatur
Zurück zum Zitat Afrouz A, Hassani FP, Scoble MJ (1988) Geotechnical assessment of the bearing capacity of coal mine floors. Int J Min Geol Eng 6(4):297–312CrossRef Afrouz A, Hassani FP, Scoble MJ (1988) Geotechnical assessment of the bearing capacity of coal mine floors. Int J Min Geol Eng 6(4):297–312CrossRef
Zurück zum Zitat Ardejani FD, Shokri BJ, Moradzadeh A, Soleimani E, Jafari MA (2008) A combined mathematical geophysical model for prediction of pyrite oxidation and pollutant leaching associated with a coal washing waste dump. Int J Environ Sci Technol 5(4):517–526CrossRef Ardejani FD, Shokri BJ, Moradzadeh A, Soleimani E, Jafari MA (2008) A combined mathematical geophysical model for prediction of pyrite oxidation and pollutant leaching associated with a coal washing waste dump. Int J Environ Sci Technol 5(4):517–526CrossRef
Zurück zum Zitat Ataei M, Khalokakaei R, Hossieni M (2009) Determination of coal mine mechanization using fuzzy logic. Min Sci Technol (China) 19(2):149–154CrossRef Ataei M, Khalokakaei R, Hossieni M (2009) Determination of coal mine mechanization using fuzzy logic. Min Sci Technol (China) 19(2):149–154CrossRef
Zurück zum Zitat Bin Y (2010) Study on fully mechanized coal mining technology in passed 40 years in Datong mining area. J China Coal Soc 35(11):1772–1777 Bin Y (2010) Study on fully mechanized coal mining technology in passed 40 years in Datong mining area. J China Coal Soc 35(11):1772–1777
Zurück zum Zitat Brans JP, Vincke P, Mareschal B (1986) How to select and how to rank projects: the PROMETHEE method. Eur J Oper Res 24(2):228–238CrossRef Brans JP, Vincke P, Mareschal B (1986) How to select and how to rank projects: the PROMETHEE method. Eur J Oper Res 24(2):228–238CrossRef
Zurück zum Zitat Ghadernejad S, Lalegani Dezaki S, Rajaty MH (2016) Classification of mechanization capability of Tazareh coal mine stopes using analytical hierarchy process. In: 3rd national Iranian coal congress, vol 3, 30–31 Aug 2016. Shahrood University of Technology, pp 1–5 Ghadernejad S, Lalegani Dezaki S, Rajaty MH (2016) Classification of mechanization capability of Tazareh coal mine stopes using analytical hierarchy process. In: 3rd national Iranian coal congress, vol 3, 30–31 Aug 2016. Shahrood University of Technology, pp 1–5
Zurück zum Zitat Hattingh TS, Sheer TJ, Du Plessis AG (2010) Human factors in mine mechanization. In: The 4th international platinum conference, platinum in transition ‘boom or bust”. The South African Institute of Mining and Metallurgy Hattingh TS, Sheer TJ, Du Plessis AG (2010) Human factors in mine mechanization. In: The 4th international platinum conference, platinum in transition ‘boom or bust”. The South African Institute of Mining and Metallurgy
Zurück zum Zitat Hosseini SAA, Ataei M, Hosseini SM, Akhyani M (2012) Application of fuzzy logic for determining of coal mine mechanization. J Coal Sci Eng (China) 18(3):225–231CrossRef Hosseini SAA, Ataei M, Hosseini SM, Akhyani M (2012) Application of fuzzy logic for determining of coal mine mechanization. J Coal Sci Eng (China) 18(3):225–231CrossRef
Zurück zum Zitat Hwang CL, Lin MJ (2012) Group decision making under multiple criteria: methods and applications, vol 281. Springer, Berlin Hwang CL, Lin MJ (2012) Group decision making under multiple criteria: methods and applications, vol 281. Springer, Berlin
Zurück zum Zitat Ishikawa A, Amagasa M, Shiga T, Tomizawa G, Tatsuta R, Mieno H (1993) The max-min Delphi method and fuzzy Delphi method via fuzzy integration. Fuzzy Sets Syst 55(3):241–253CrossRef Ishikawa A, Amagasa M, Shiga T, Tomizawa G, Tatsuta R, Mieno H (1993) The max-min Delphi method and fuzzy Delphi method via fuzzy integration. Fuzzy Sets Syst 55(3):241–253CrossRef
Zurück zum Zitat Kaufmann A, Gupta MM (1988) Fuzzy mathematical models in engineering and management science. Elsevier, Amsterdam Kaufmann A, Gupta MM (1988) Fuzzy mathematical models in engineering and management science. Elsevier, Amsterdam
Zurück zum Zitat Liu YC, Chen CS (2007) A new approach for application of rock mass classification on rock slope stability assessment. Eng Geol 89(1–2):129–143CrossRef Liu YC, Chen CS (2007) A new approach for application of rock mass classification on rock slope stability assessment. Eng Geol 89(1–2):129–143CrossRef
Zurück zum Zitat Mehdi HS, Reza M, Mohammad A, Khalokakaei R (2013) Development a new classification for assessing the coal mine mechanization/Opracowanie nowej klasyfikacji dla oceny mechanizacji w kopalniach węgla. Arch Min Sci 58(1):217–226 Mehdi HS, Reza M, Mohammad A, Khalokakaei R (2013) Development a new classification for assessing the coal mine mechanization/Opracowanie nowej klasyfikacji dla oceny mechanizacji w kopalniach węgla. Arch Min Sci 58(1):217–226
Zurück zum Zitat Özfırat MK (2012) A fuzzy method for selecting underground coal mining method considering mechanization criteria. J Min Sci 48(3):533–544CrossRef Özfırat MK (2012) A fuzzy method for selecting underground coal mining method considering mechanization criteria. J Min Sci 48(3):533–544CrossRef
Zurück zum Zitat Saaty TL (1980) The analytic hierarchy process. McGraw-Hill, New York Saaty TL (1980) The analytic hierarchy process. McGraw-Hill, New York
Zurück zum Zitat Saaty TL (1994) How to make a decision: the analytic hierarchy process. Interfaces 24(6):19–43CrossRef Saaty TL (1994) How to make a decision: the analytic hierarchy process. Interfaces 24(6):19–43CrossRef
Zurück zum Zitat Sheng GJ, Sun QS, Song HL (2007) The innovational mining technology of fully mechanized mining on thin coal seam. J China Coal Soc 32(3):230–234 Sheng GJ, Sun QS, Song HL (2007) The innovational mining technology of fully mechanized mining on thin coal seam. J China Coal Soc 32(3):230–234
Zurück zum Zitat Wang G, Jiao S, Cheng G (2011) Fully mechanized coal mining technology for thin coal seam under complicated geological conditions. Energy Explor Exploit 29(2):169–177CrossRef Wang G, Jiao S, Cheng G (2011) Fully mechanized coal mining technology for thin coal seam under complicated geological conditions. Energy Explor Exploit 29(2):169–177CrossRef
Metadaten
Titel
Ranking and Evaluating the Coal Seam Mechanization Based on Geological Conditions
verfasst von
Reza Mikaeil
Ehsan Jafarnejad Gharahasanlou
Amir Jafarpour
Publikationsdatum
24.01.2020
Verlag
Springer International Publishing
Erschienen in
Geotechnical and Geological Engineering / Ausgabe 3/2020
Print ISSN: 0960-3182
Elektronische ISSN: 1573-1529
DOI
https://doi.org/10.1007/s10706-020-01200-0

Weitere Artikel der Ausgabe 3/2020

Geotechnical and Geological Engineering 3/2020 Zur Ausgabe