Skip to main content

2021 | OriginalPaper | Buchkapitel

Research on Data Sharing Between Design and Production of PC Components

verfasst von : Xingchong Wang, Jiayuan Wang, Min Zhou, Jin Wang

Erschienen in: Proceedings of the 24th International Symposium on Advancement of Construction Management and Real Estate

Verlag: Springer Singapore

Aktivieren Sie unsere intelligente Suche, um passende Fachinhalte oder Patente zu finden.

search-config
loading …

Abstract

With the rapid development of building industrialization, the integration of prefabricated building and information management has attracted much attention. In the life cycle of a prefabricated building, the stages involved are complex, the parties involved are numerous, and the data information generated is diverse and numerous, which leads to the low efficiency of data information transmission and the inability to share with each other. The reason is that there is no unified data interaction format among stakeholders at all stages. However, there are few studies on data sharing at each stage in the existing literature, and even less studies on data interaction types between design stage and production stage. To help solve the data sharing problems encountered during prefabricated building construction, this research first identified and analyzed key factors that may have a significant impact on prefabricated component data sharing. Based on the identified factors, the challenges and corresponding functional requirements for increasing data sharing are determined. Then, a data transmission method based on Revit API is proposed. Revit API transmits data to the prefabricated factory on demand to achieve seamless connection between design information and production information. Based on the WPF application under Visual Studio 2013, the PC data sharing platform is developed to realize the start and close of data sharing events. The BIM model with in-depth design can export the blanking orders and processing drawings required by the prefabricated factory through data sharing, transform the design information into production information, and complete the delivery of prefabricated components, thereby improve data sharing efficiency, and better complete the refined management of prefabricated components.

Sie haben noch keine Lizenz? Dann Informieren Sie sich jetzt über unsere Produkte:

Springer Professional "Wirtschaft+Technik"

Online-Abonnement

Mit Springer Professional "Wirtschaft+Technik" erhalten Sie Zugriff auf:

  • über 102.000 Bücher
  • über 537 Zeitschriften

aus folgenden Fachgebieten:

  • Automobil + Motoren
  • Bauwesen + Immobilien
  • Business IT + Informatik
  • Elektrotechnik + Elektronik
  • Energie + Nachhaltigkeit
  • Finance + Banking
  • Management + Führung
  • Marketing + Vertrieb
  • Maschinenbau + Werkstoffe
  • Versicherung + Risiko

Jetzt Wissensvorsprung sichern!

Springer Professional "Wirtschaft"

Online-Abonnement

Mit Springer Professional "Wirtschaft" erhalten Sie Zugriff auf:

  • über 67.000 Bücher
  • über 340 Zeitschriften

aus folgenden Fachgebieten:

  • Bauwesen + Immobilien
  • Business IT + Informatik
  • Finance + Banking
  • Management + Führung
  • Marketing + Vertrieb
  • Versicherung + Risiko




Jetzt Wissensvorsprung sichern!

Springer Professional "Technik"

Online-Abonnement

Mit Springer Professional "Technik" erhalten Sie Zugriff auf:

  • über 67.000 Bücher
  • über 390 Zeitschriften

aus folgenden Fachgebieten:

  • Automobil + Motoren
  • Bauwesen + Immobilien
  • Business IT + Informatik
  • Elektrotechnik + Elektronik
  • Energie + Nachhaltigkeit
  • Maschinenbau + Werkstoffe




 

Jetzt Wissensvorsprung sichern!

Literatur
1.
Zurück zum Zitat Gibb, A. G. F.: Off-site fabrication: Prefabrication, pre-assembly and modularisation (1999). Gibb, A. G. F.: Off-site fabrication: Prefabrication, pre-assembly and modularisation (1999).
2.
Zurück zum Zitat CIRIA. (1999). REP R 176 Standardisation and pre-assembly—adding value to construction projects. CIRIA. (1999). REP R 176 Standardisation and pre-assembly—adding value to construction projects.
3.
Zurück zum Zitat Li, C. Z., Shen, G. Q., Xu, X., Xue, F., Sommer, L., & Luo, L. (2016). Schedule risk modeling in prefabrication housing production in Hong Kong. Journal of Cleaner Production, 153, 692–706.CrossRef Li, C. Z., Shen, G. Q., Xu, X., Xue, F., Sommer, L., & Luo, L. (2016). Schedule risk modeling in prefabrication housing production in Hong Kong. Journal of Cleaner Production, 153, 692–706.CrossRef
4.
Zurück zum Zitat Li, C. Z., Hong, J., Xue, F., Shen, G. Q., Xu, X., & Luo, L. (2016). SWOT analysis and Internet of Things-enabled platform for prefabrication housing production in Hong Kong. Habitat International, 57, 74–87.CrossRef Li, C. Z., Hong, J., Xue, F., Shen, G. Q., Xu, X., & Luo, L. (2016). SWOT analysis and Internet of Things-enabled platform for prefabrication housing production in Hong Kong. Habitat International, 57, 74–87.CrossRef
5.
Zurück zum Zitat Li, C. Z., Hong, J., Xue, F., Shen, G. Q., Xu, X., & Mok, M. K. (2016). Schedule risks in prefabrication housing production in Hong Kong: A social network analysis. Journal of Cleaner Production, 134, 482–494.CrossRef Li, C. Z., Hong, J., Xue, F., Shen, G. Q., Xu, X., & Mok, M. K. (2016). Schedule risks in prefabrication housing production in Hong Kong: A social network analysis. Journal of Cleaner Production, 134, 482–494.CrossRef
6.
Zurück zum Zitat Lihong, L. I., Xiao, Z., Xin, F. U., Yang, X., Management, S. O., University, S. J. (2011). Analysis on construction cost of prefabricated building. Construction Economy. Lihong, L. I., Xiao, Z., Xin, F. U., Yang, X., Management, S. O., University, S. J. (2011). Analysis on construction cost of prefabricated building. Construction Economy.
7.
Zurück zum Zitat Hong, J., Shen, G. Q., Mao, C., Li, Z., & Li, K. (2016). Life-cycle energy analysis of prefabricated building components: An input–output-based hybrid model. Journal of Cleaner Production, 112, 2198–2207.CrossRef Hong, J., Shen, G. Q., Mao, C., Li, Z., & Li, K. (2016). Life-cycle energy analysis of prefabricated building components: An input–output-based hybrid model. Journal of Cleaner Production, 112, 2198–2207.CrossRef
8.
Zurück zum Zitat Li, C. Z., Xue, F., Li, X., Hong, J., & Shen, G. Q. (2018). An Internet of Things-enabled BIM platform for on-site assembly services in prefabricated construction. Automation in Construction, 89, 146–161.CrossRef Li, C. Z., Xue, F., Li, X., Hong, J., & Shen, G. Q. (2018). An Internet of Things-enabled BIM platform for on-site assembly services in prefabricated construction. Automation in Construction, 89, 146–161.CrossRef
9.
Zurück zum Zitat Li, C. Z., Zhong, R. Y., Xue, F., Xu, G., Chen, K., Huang, G. G., Shen, G. Q. (2017). Integrating RFID and BIM technologies for mitigating risks and improving schedule performance of prefabricated house construction. Journal of Cleaner Production, 165. Li, C. Z., Zhong, R. Y., Xue, F., Xu, G., Chen, K., Huang, G. G., Shen, G. Q. (2017). Integrating RFID and BIM technologies for mitigating risks and improving schedule performance of prefabricated house construction. Journal of Cleaner Production, 165.
10.
Zurück zum Zitat Yarmohammadi, S., & Castro-Lacouture, D. (2018). Automated performance measurement for 3D building modeling decisions. Automation in Construction, 93, 91–111.CrossRef Yarmohammadi, S., & Castro-Lacouture, D. (2018). Automated performance measurement for 3D building modeling decisions. Automation in Construction, 93, 91–111.CrossRef
11.
Zurück zum Zitat Chen, K., Lu, W., Peng, Y. (2015). Prefabrication production service for RFID-enabled building information modeling (BIM) platform (RBIMP). Chen, K., Lu, W., Peng, Y. (2015). Prefabrication production service for RFID-enabled building information modeling (BIM) platform (RBIMP).
12.
Zurück zum Zitat Yin, S. Y. L., Tserng, H. P., Wang, J. C., & Tsai, S. C. (2009). Developing a precast production management system using RFID technology. Automation in Construction, 18(5), 677–691.CrossRef Yin, S. Y. L., Tserng, H. P., Wang, J. C., & Tsai, S. C. (2009). Developing a precast production management system using RFID technology. Automation in Construction, 18(5), 677–691.CrossRef
Metadaten
Titel
Research on Data Sharing Between Design and Production of PC Components
verfasst von
Xingchong Wang
Jiayuan Wang
Min Zhou
Jin Wang
Copyright-Jahr
2021
Verlag
Springer Singapore
DOI
https://doi.org/10.1007/978-981-15-8892-1_135