Skip to main content
Erschienen in: Research in Engineering Design 3/2019

02.04.2019 | Original Paper

Resource optimization of product development projects with time-varying dependency structure

verfasst von: Masaki Ogura, Junichi Harada, Masako Kishida, Ali Yassine

Erschienen in: Research in Engineering Design | Ausgabe 3/2019

Einloggen

Aktivieren Sie unsere intelligente Suche, um passende Fachinhalte oder Patente zu finden.

search-config
loading …

Abstract

Project managers are continuously under pressure to shorten product development durations. One practical approach for reducing the project duration is lessening dependencies between different development components and teams. However, most of the resource allocation strategies for lessening dependencies place the implicit and simplistic assumption that the dependency structure between components is static (i.e., does not change over time). This assumption, however, does not necessarily hold true in all product development projects. In this paper, we present an analytical framework for optimally allocating resources to shorten the lead time of product development projects having a time-varying dependency structure. We build our theoretical framework on a linear system model of product development processes, in which system integration and local development teams exchange information asynchronously and aperiodically. Utilizing a convexity result from the matrix theory, we show that the optimal resource allocation can be efficiently found by solving a convex optimization problem. We provide illustrative examples to demonstrate the proposed framework. We also present boundary analyses based on major graph models to provide managerial guidelines for improving empirical PD processes.

Sie haben noch keine Lizenz? Dann Informieren Sie sich jetzt über unsere Produkte:

Springer Professional "Wirtschaft+Technik"

Online-Abonnement

Mit Springer Professional "Wirtschaft+Technik" erhalten Sie Zugriff auf:

  • über 102.000 Bücher
  • über 537 Zeitschriften

aus folgenden Fachgebieten:

  • Automobil + Motoren
  • Bauwesen + Immobilien
  • Business IT + Informatik
  • Elektrotechnik + Elektronik
  • Energie + Nachhaltigkeit
  • Finance + Banking
  • Management + Führung
  • Marketing + Vertrieb
  • Maschinenbau + Werkstoffe
  • Versicherung + Risiko

Jetzt Wissensvorsprung sichern!

Springer Professional "Technik"

Online-Abonnement

Mit Springer Professional "Technik" erhalten Sie Zugriff auf:

  • über 67.000 Bücher
  • über 390 Zeitschriften

aus folgenden Fachgebieten:

  • Automobil + Motoren
  • Bauwesen + Immobilien
  • Business IT + Informatik
  • Elektrotechnik + Elektronik
  • Energie + Nachhaltigkeit
  • Maschinenbau + Werkstoffe




 

Jetzt Wissensvorsprung sichern!

Literatur
Zurück zum Zitat Adler P, Mandelbaum A, Nguyen V, Schwerer E (1995) Project to process management: empirically-based framework for analyzing product development time. Manag Sci 41(3):458–484MATHCrossRef Adler P, Mandelbaum A, Nguyen V, Schwerer E (1995) Project to process management: empirically-based framework for analyzing product development time. Manag Sci 41(3):458–484MATHCrossRef
Zurück zum Zitat Ahmadi R, Wang RH (1999) Managing development risk in product design processes. Oper Res 47:235–246MATHCrossRef Ahmadi R, Wang RH (1999) Managing development risk in product design processes. Oper Res 47:235–246MATHCrossRef
Zurück zum Zitat Alcaraz J, Maroto C, Ruiz R (2003) Solving the multi-mode resource-constrained project scheduling problem with genetic algorithms. J Oper Res Soc 54(6):614–626MATHCrossRef Alcaraz J, Maroto C, Ruiz R (2003) Solving the multi-mode resource-constrained project scheduling problem with genetic algorithms. J Oper Res Soc 54(6):614–626MATHCrossRef
Zurück zum Zitat Baldwin C, Clark K (2000) Design rules: the power of modularity. MIT Press, CambridgeCrossRef Baldwin C, Clark K (2000) Design rules: the power of modularity. MIT Press, CambridgeCrossRef
Zurück zum Zitat Boctor FF (1996) A new and efficient heuristic for scheduling projects with resource restrictions and multiple execution modes. Eur J Oper Res 90(2):349–361MathSciNetMATHCrossRef Boctor FF (1996) A new and efficient heuristic for scheduling projects with resource restrictions and multiple execution modes. Eur J Oper Res 90(2):349–361MathSciNetMATHCrossRef
Zurück zum Zitat Borjesson F, Hölttä-Otto K (2014) A module generation algorithm for product architecture based on component interactions and strategic drivers. Res Eng Des 25(1):31–51CrossRef Borjesson F, Hölttä-Otto K (2014) A module generation algorithm for product architecture based on component interactions and strategic drivers. Res Eng Des 25(1):31–51CrossRef
Zurück zum Zitat Boyd S, Vandenberghe L (2004) Convex optimization. Cambridge University Press, CambridgeMATHCrossRef Boyd S, Vandenberghe L (2004) Convex optimization. Cambridge University Press, CambridgeMATHCrossRef
Zurück zum Zitat Braha D, Bar-Yam Y (2004a) Information flow structure in large-scale product development organizational networks. J Inf Technol 19(4):244–253CrossRef Braha D, Bar-Yam Y (2004a) Information flow structure in large-scale product development organizational networks. J Inf Technol 19(4):244–253CrossRef
Zurück zum Zitat Braha D, Bar-Yam Y (2004b) Topology of large-scale engineering problem-solving networks. Phys Rev E 69(1):016113CrossRef Braha D, Bar-Yam Y (2004b) Topology of large-scale engineering problem-solving networks. Phys Rev E 69(1):016113CrossRef
Zurück zum Zitat Braha D, Bar-Yam Y (2006) From centrality to temporary fame: dynamic centrality in complex networks. Complexity 12(2):59–63CrossRef Braha D, Bar-Yam Y (2006) From centrality to temporary fame: dynamic centrality in complex networks. Complexity 12(2):59–63CrossRef
Zurück zum Zitat Braha D, Bar-Yam Y (2007) The statistical mechanics of complex product development: empirical and analytical results. Manag Sci 53(7):1127–1145MATHCrossRef Braha D, Bar-Yam Y (2007) The statistical mechanics of complex product development: empirical and analytical results. Manag Sci 53(7):1127–1145MATHCrossRef
Zurück zum Zitat Braha D, Bar-Yam Y (2009) Time-dependent complex networks: dynamic centrality, dynamic motifs, and cycles of social interactions. In: Gross T, Sayama H (eds) Adaptive networks: theory, models and applications. Springer, Berlin, pp 39–50CrossRef Braha D, Bar-Yam Y (2009) Time-dependent complex networks: dynamic centrality, dynamic motifs, and cycles of social interactions. In: Gross T, Sayama H (eds) Adaptive networks: theory, models and applications. Springer, Berlin, pp 39–50CrossRef
Zurück zum Zitat Browning TR (2016) Design structure matrix extensions and innovations: a survey and new opportunities. IEEE Trans Eng Manag 63(1):27–52MathSciNetCrossRef Browning TR (2016) Design structure matrix extensions and innovations: a survey and new opportunities. IEEE Trans Eng Manag 63(1):27–52MathSciNetCrossRef
Zurück zum Zitat Browning TR, Ramasesh RV (2007) A survey of activity network-based process models for managing product development projects. Prod Oper Manag 16(2):217–240CrossRef Browning TR, Ramasesh RV (2007) A survey of activity network-based process models for managing product development projects. Prod Oper Manag 16(2):217–240CrossRef
Zurück zum Zitat Cai J, Liu X, Xiao Z, Liu J (2009) Improving supply chain performance management: a systematic approach to analyzing iterative KPI accomplishment. Decis Support Syst 46(2):512–521CrossRef Cai J, Liu X, Xiao Z, Liu J (2009) Improving supply chain performance management: a systematic approach to analyzing iterative KPI accomplishment. Decis Support Syst 46(2):512–521CrossRef
Zurück zum Zitat Chen J, Reilly RR, Lynn GS (2012) New product development speed: Too much of a good thing? J Product Innov Manag 29(2):288–303CrossRef Chen J, Reilly RR, Lynn GS (2012) New product development speed: Too much of a good thing? J Product Innov Manag 29(2):288–303CrossRef
Zurück zum Zitat Cheng H, Chu X (2012) Task assignment with multiskilled employees and multiple modes for product development projects. Int J Adv Manuf Technol 61(1–4):391–403CrossRef Cheng H, Chu X (2012) Task assignment with multiskilled employees and multiple modes for product development projects. Int J Adv Manuf Technol 61(1–4):391–403CrossRef
Zurück zum Zitat Cicmil S, Williams T, Thomas J, Hodgson D (2006) Rethinking project management: researching the actuality of projects. Int J Project Manag 24(8):675–686CrossRef Cicmil S, Williams T, Thomas J, Hodgson D (2006) Rethinking project management: researching the actuality of projects. Int J Project Manag 24(8):675–686CrossRef
Zurück zum Zitat Collyer S, Warren CM (2009) Project management approaches for dynamic environments. Int J Project Manag 27(4):355–364CrossRef Collyer S, Warren CM (2009) Project management approaches for dynamic environments. Int J Project Manag 27(4):355–364CrossRef
Zurück zum Zitat Cooke-Davies T (2002) The “real” success factors on projects. Int J Project Manag 20(3):185–190CrossRef Cooke-Davies T (2002) The “real” success factors on projects. Int J Project Manag 20(3):185–190CrossRef
Zurück zum Zitat Cui Q, Hastak M, Halpin D (2010) Systems analysis of project cash flow management strategies. Constr Manag Econ 28(4):361–376CrossRef Cui Q, Hastak M, Halpin D (2010) Systems analysis of project cash flow management strategies. Constr Manag Econ 28(4):361–376CrossRef
Zurück zum Zitat Fefferman N, Ng K (2007) How disease models in static networks can fail to approximate disease in dynamic networks. Phys Rev E 76(3):031919MathSciNetCrossRef Fefferman N, Ng K (2007) How disease models in static networks can fail to approximate disease in dynamic networks. Phys Rev E 76(3):031919MathSciNetCrossRef
Zurück zum Zitat Frenken K (2006) A fitness landscape approach to technological complexity, modularity, and vertical disintegration. Struct Change Econ Dyn 17(3):288–305CrossRef Frenken K (2006) A fitness landscape approach to technological complexity, modularity, and vertical disintegration. Struct Change Econ Dyn 17(3):288–305CrossRef
Zurück zum Zitat Hahn GJ, Kuhn H (2012) Designing decision support systems for value-based management: a survey and an architecture. Decis Support Syst 53(3):591–598CrossRef Hahn GJ, Kuhn H (2012) Designing decision support systems for value-based management: a survey and an architecture. Decis Support Syst 53(3):591–598CrossRef
Zurück zum Zitat Hartmann S, Briskorn D (2010) A survey of variants and extensions of the resource-constrained project scheduling problem. Eur J Oper Res 207(1):1–14MathSciNetMATHCrossRef Hartmann S, Briskorn D (2010) A survey of variants and extensions of the resource-constrained project scheduling problem. Eur J Oper Res 207(1):1–14MathSciNetMATHCrossRef
Zurück zum Zitat Hill SA, Braha D (2010) Dynamic model of time-dependent complex networks. Phys Rev E 82(4):046105CrossRef Hill SA, Braha D (2010) Dynamic model of time-dependent complex networks. Phys Rev E 82(4):046105CrossRef
Zurück zum Zitat Holme P (2015) Modern temporal network theory: a colloquium. Eur Phys J B 88(9):234CrossRef Holme P (2015) Modern temporal network theory: a colloquium. Eur Phys J B 88(9):234CrossRef
Zurück zum Zitat Hölttä-Otto K, de Weck O (2007) Degree of modularity in engineering systems and products with technical and business constraints. Concurr Eng Res Appl 15(2):113–125CrossRef Hölttä-Otto K, de Weck O (2007) Degree of modularity in engineering systems and products with technical and business constraints. Concurr Eng Res Appl 15(2):113–125CrossRef
Zurück zum Zitat Huberman BA, Glance NS (1993) Evolutionary games and computer simulations. Proc Natl Acad Sci 90(16):7716–7718MATHCrossRef Huberman BA, Glance NS (1993) Evolutionary games and computer simulations. Proc Natl Acad Sci 90(16):7716–7718MATHCrossRef
Zurück zum Zitat Huberman BA, Wilkinson DM (2005) Performance variability and project dynamics. Comput Math Org Theory 11(4):307–332MATHCrossRef Huberman BA, Wilkinson DM (2005) Performance variability and project dynamics. Comput Math Org Theory 11(4):307–332MATHCrossRef
Zurück zum Zitat Joglekar NR, Ford DN (2005) Product development resource allocation with foresight. Eur J Oper Res 160(1):72–87MATHCrossRef Joglekar NR, Ford DN (2005) Product development resource allocation with foresight. Eur J Oper Res 160(1):72–87MATHCrossRef
Zurück zum Zitat Joglekar NR, Yassine AA, Eppinger SD, Whitney DE (2001) Performance of coupled product development activities with a deadline. Manag Sci 47(12):1605–1620CrossRef Joglekar NR, Yassine AA, Eppinger SD, Whitney DE (2001) Performance of coupled product development activities with a deadline. Manag Sci 47(12):1605–1620CrossRef
Zurück zum Zitat Kim D (2007) On representations and dynamic analysis of concurrent engineering design. J Eng Des 18(3):265–277CrossRef Kim D (2007) On representations and dynamic analysis of concurrent engineering design. J Eng Des 18(3):265–277CrossRef
Zurück zum Zitat Krishnan V, Ulrich KT (2001) Product development decisions: a review of the literature. Manag Sci 47(1):1–21CrossRef Krishnan V, Ulrich KT (2001) Product development decisions: a review of the literature. Manag Sci 47(1):1–21CrossRef
Zurück zum Zitat Lee H, Padmanabhan V, Whang S (1997) Information distortion in a supply chain: the bullwhip effect. Manag Sci 43:546–558MATHCrossRef Lee H, Padmanabhan V, Whang S (1997) Information distortion in a supply chain: the bullwhip effect. Manag Sci 43:546–558MATHCrossRef
Zurück zum Zitat Lee SG, Ong KL, Khoo LP (2004) Control and monitoring of concurrent design tasks in a dynamic environment. Concurr Eng Res Appl 12(1):59–66CrossRef Lee SG, Ong KL, Khoo LP (2004) Control and monitoring of concurrent design tasks in a dynamic environment. Concurr Eng Res Appl 12(1):59–66CrossRef
Zurück zum Zitat Lin H, Antsaklis PJ (2007) Switching stabilizability for continuous-time uncertain switched linear systems. IEEE Trans Autom Control 52(4):633–646MathSciNetMATHCrossRef Lin H, Antsaklis PJ (2007) Switching stabilizability for continuous-time uncertain switched linear systems. IEEE Trans Autom Control 52(4):633–646MathSciNetMATHCrossRef
Zurück zum Zitat Lin H, Antsaklis P (2009) Stability and stabilizability of switched linear systems: a survey of recent results. IEEE Trans Autom Control 54(2):308–322MathSciNetMATHCrossRef Lin H, Antsaklis P (2009) Stability and stabilizability of switched linear systems: a survey of recent results. IEEE Trans Autom Control 54(2):308–322MathSciNetMATHCrossRef
Zurück zum Zitat Loch CH, Terwiesch C (1998) Communication and uncertainty in concurrent engineering. Manag Sci 44(8):1032–1048MATHCrossRef Loch CH, Terwiesch C (1998) Communication and uncertainty in concurrent engineering. Manag Sci 44(8):1032–1048MATHCrossRef
Zurück zum Zitat Loch C, Terwiesch C (1999) Accelerating the process of engineering change orders: capacity and congestion effects. J Product Innov Manag 16:145–159CrossRef Loch C, Terwiesch C (1999) Accelerating the process of engineering change orders: capacity and congestion effects. J Product Innov Manag 16:145–159CrossRef
Zurück zum Zitat Martin MV, Ishii K (2002) Design for variety: developing standardized and modularized product platform architectures. Res Eng Des 13(4):213–235CrossRef Martin MV, Ishii K (2002) Design for variety: developing standardized and modularized product platform architectures. Res Eng Des 13(4):213–235CrossRef
Zurück zum Zitat Masuda N, Lambiotte R (2016) A guide to temporal networks. World Scientific Publishing, SingaporeMATHCrossRef Masuda N, Lambiotte R (2016) A guide to temporal networks. World Scientific Publishing, SingaporeMATHCrossRef
Zurück zum Zitat McDaniel CD (1996) A linear system framework for analyzing the automotive appearance design process. Ph.D. thesis, Massachusetts Institute of Technology McDaniel CD (1996) A linear system framework for analyzing the automotive appearance design process. Ph.D. thesis, Massachusetts Institute of Technology
Zurück zum Zitat Mihm J, Loch C, Huchzermeier A (2003) Problem-solving oscillations in complex engineering projects. Manag Sci 49(6):733–750CrossRef Mihm J, Loch C, Huchzermeier A (2003) Problem-solving oscillations in complex engineering projects. Manag Sci 49(6):733–750CrossRef
Zurück zum Zitat Muller R, Geraldi J, Turner JR, Müller R, Geraldi J, Turner JR (2012) Relationships between leadership and success in different types of project complexities. IEEE Trans Eng Manag 59(1):77–90CrossRef Muller R, Geraldi J, Turner JR, Müller R, Geraldi J, Turner JR (2012) Relationships between leadership and success in different types of project complexities. IEEE Trans Eng Manag 59(1):77–90CrossRef
Zurück zum Zitat Ogura M, Martin CF (2015) Stability analysis of linear systems subject to regenerative switchings. Syst Control Lett 75:94–100MathSciNetMATHCrossRef Ogura M, Martin CF (2015) Stability analysis of linear systems subject to regenerative switchings. Syst Control Lett 75:94–100MathSciNetMATHCrossRef
Zurück zum Zitat Ogura M, Preciado VM (2017) Optimal design of switched networks of positive linear systems via geometric programming. IEEE Trans Control Netw Syst 4(2):213–222MathSciNetMATHCrossRef Ogura M, Preciado VM (2017) Optimal design of switched networks of positive linear systems via geometric programming. IEEE Trans Control Netw Syst 4(2):213–222MathSciNetMATHCrossRef
Zurück zum Zitat Ong KL, Lee SG, Khoo LP (2003) Homogeneous state-space representation of concurrent design. J Eng Des 14(2):221–245CrossRef Ong KL, Lee SG, Khoo LP (2003) Homogeneous state-space representation of concurrent design. J Eng Des 14(2):221–245CrossRef
Zurück zum Zitat Patterson JH, Brian Talbot F, Slowinski R, Wegłarz J (1990) Computational experience with a backtracking algorithm for solving a general class of precedence and resource-constrained scheduling problems. Eur J Oper Res 49(1):68–79MATHCrossRef Patterson JH, Brian Talbot F, Slowinski R, Wegłarz J (1990) Computational experience with a backtracking algorithm for solving a general class of precedence and resource-constrained scheduling problems. Eur J Oper Res 49(1):68–79MATHCrossRef
Zurück zum Zitat Peteghem VV, Vanhoucke M (2010) A genetic algorithm for the preemptive and non-preemptive multi-mode resource-constrained project scheduling problem. Eur J Oper Res 201(2):409–418MathSciNetMATHCrossRef Peteghem VV, Vanhoucke M (2010) A genetic algorithm for the preemptive and non-preemptive multi-mode resource-constrained project scheduling problem. Eur J Oper Res 201(2):409–418MathSciNetMATHCrossRef
Zurück zum Zitat PMI (2013) A guide to the project management body of knowledge. Project Management Institute, Newtown Square PMI (2013) A guide to the project management body of knowledge. Project Management Institute, Newtown Square
Zurück zum Zitat Serrador P, Turner R (2015) The relationship between project success and project efficiency. Project Manag J 46(1):30–39CrossRef Serrador P, Turner R (2015) The relationship between project success and project efficiency. Project Manag J 46(1):30–39CrossRef
Zurück zum Zitat Smith RP, Eppinger SD (1997) Identifying controlling features of engineering design iteration. Manag Sci 43(3):276–293MATHCrossRef Smith RP, Eppinger SD (1997) Identifying controlling features of engineering design iteration. Manag Sci 43(3):276–293MATHCrossRef
Zurück zum Zitat Vazquez A, Rácz B, Lukács A, Barabasi AL (2007) Impact of non-Poissonian activity patterns on spreading processes. Phys Rev Lett 98(15):158702CrossRef Vazquez A, Rácz B, Lukács A, Barabasi AL (2007) Impact of non-Poissonian activity patterns on spreading processes. Phys Rev Lett 98(15):158702CrossRef
Zurück zum Zitat Watts DJ, Strogatz SH (1998) Collective dynamics of ‘small-world’ networks. Nature 393(6684):440–442MATHCrossRef Watts DJ, Strogatz SH (1998) Collective dynamics of ‘small-world’ networks. Nature 393(6684):440–442MATHCrossRef
Zurück zum Zitat Xiao R, Chen T, Ju C (2011) Research on product development iterations based on feedback control theory in a dynamic environment. Int J Innov Comput Inf Control 7(5):2669–2688 Xiao R, Chen T, Ju C (2011) Research on product development iterations based on feedback control theory in a dynamic environment. Int J Innov Comput Inf Control 7(5):2669–2688
Zurück zum Zitat Yassine AA, Naoum-Sawaya J (2016) Architecture, performance, and investment in product development networks. J Mech Des 139(1):011101CrossRef Yassine AA, Naoum-Sawaya J (2016) Architecture, performance, and investment in product development networks. J Mech Des 139(1):011101CrossRef
Zurück zum Zitat Yassine A, Joglekar N, Braha D, Eppinger S, Whitney D (2003) Information hiding in product development: the design churn effect. Res Eng Des 14(3):145–161CrossRef Yassine A, Joglekar N, Braha D, Eppinger S, Whitney D (2003) Information hiding in product development: the design churn effect. Res Eng Des 14(3):145–161CrossRef
Zurück zum Zitat Yu TL, Yassine AA, Goldberg DE (2007) An information theoretic method for developing modular architectures using genetic algorithms. Res Eng Des 18(2):91–109CrossRef Yu TL, Yassine AA, Goldberg DE (2007) An information theoretic method for developing modular architectures using genetic algorithms. Res Eng Des 18(2):91–109CrossRef
Metadaten
Titel
Resource optimization of product development projects with time-varying dependency structure
verfasst von
Masaki Ogura
Junichi Harada
Masako Kishida
Ali Yassine
Publikationsdatum
02.04.2019
Verlag
Springer London
Erschienen in
Research in Engineering Design / Ausgabe 3/2019
Print ISSN: 0934-9839
Elektronische ISSN: 1435-6066
DOI
https://doi.org/10.1007/s00163-019-00316-6

Weitere Artikel der Ausgabe 3/2019

Research in Engineering Design 3/2019 Zur Ausgabe

    Marktübersichten

    Die im Laufe eines Jahres in der „adhäsion“ veröffentlichten Marktübersichten helfen Anwendern verschiedenster Branchen, sich einen gezielten Überblick über Lieferantenangebote zu verschaffen.