Skip to main content

2021 | OriginalPaper | Buchkapitel

Risk Assessment of Prefabricated Buildings for Whole Life Cycle Based on Risk Matrix—VWAHP

verfasst von : Xuexue Yang, Qiang Liu

Erschienen in: Proceedings of the 24th International Symposium on Advancement of Construction Management and Real Estate

Verlag: Springer Singapore

Aktivieren Sie unsere intelligente Suche, um passende Fachinhalte oder Patente zu finden.

search-config
loading …

Abstract

With the transformation and upgrading of the traditional construction industry, prefabricated buildings have been applied more and more and become the driving force of modern building industrialization. At the same time, there are many risk factors in the whole life cycle including decision-making, design, transportation of PC components, construction and operation. Compared with traditional construction projects, prefabricated buildings require a higher level of expertise and management in addition to large scale and complexity. In addition, prefabricated buildings have a longer construction period and are prone to various risk factors in the whole life cycle. The risk assessment method of traditional buildings cannot be fully adapted to prefabricated buildings. While most of the existing research on risk of prefabricated building is one-sided, rarely considering the risk factors of the whole life cycle. Therefore, it is particularly important to build an objective and accurate risk assessment model. Based on the existing research on risk assessment of prefabricated buildings, a model of Variable Weight Analytic Hierarchy Process (VWAHP) with the risk matrix determining the index value is established in view of the whole life cycle and is applied to prefabricated buildings risk assessment. This paper establishes a risk evaluation index system based on the whole life cycle phase division of the prefabricated building project, then calculates the comprehensive risk score by using the model and finally carries on the concrete application research through the practical instance. The results show that, this model of Risk Matrix—VWAHP comprehensively takes into account the differences and impacts of various risk evaluation indexes, which avoids the shortcomings of traditional subjective analysis methods and makes the comprehensive risk assessment score more scientific and reasonable. The practical significance of this paper is to provide a basis and quantitative analysis method for the risk management and control of prefabricated buildings throughout whole life cycle, and to promote the sustainable development of prefabricated buildings and the reasonable risk control of decision makers.

Sie haben noch keine Lizenz? Dann Informieren Sie sich jetzt über unsere Produkte:

Springer Professional "Wirtschaft+Technik"

Online-Abonnement

Mit Springer Professional "Wirtschaft+Technik" erhalten Sie Zugriff auf:

  • über 102.000 Bücher
  • über 537 Zeitschriften

aus folgenden Fachgebieten:

  • Automobil + Motoren
  • Bauwesen + Immobilien
  • Business IT + Informatik
  • Elektrotechnik + Elektronik
  • Energie + Nachhaltigkeit
  • Finance + Banking
  • Management + Führung
  • Marketing + Vertrieb
  • Maschinenbau + Werkstoffe
  • Versicherung + Risiko

Jetzt Wissensvorsprung sichern!

Springer Professional "Wirtschaft"

Online-Abonnement

Mit Springer Professional "Wirtschaft" erhalten Sie Zugriff auf:

  • über 67.000 Bücher
  • über 340 Zeitschriften

aus folgenden Fachgebieten:

  • Bauwesen + Immobilien
  • Business IT + Informatik
  • Finance + Banking
  • Management + Führung
  • Marketing + Vertrieb
  • Versicherung + Risiko




Jetzt Wissensvorsprung sichern!

Springer Professional "Technik"

Online-Abonnement

Mit Springer Professional "Technik" erhalten Sie Zugriff auf:

  • über 67.000 Bücher
  • über 390 Zeitschriften

aus folgenden Fachgebieten:

  • Automobil + Motoren
  • Bauwesen + Immobilien
  • Business IT + Informatik
  • Elektrotechnik + Elektronik
  • Energie + Nachhaltigkeit
  • Maschinenbau + Werkstoffe




 

Jetzt Wissensvorsprung sichern!

Literatur
1.
Zurück zum Zitat Warszawski, A. (1999). Industrialized and automated building systems: A managerial approach (2nd ed.). London: Spon Press. Warszawski, A. (1999). Industrialized and automated building systems: A managerial approach (2nd ed.). London: Spon Press.
2.
Zurück zum Zitat Goodier, C., & Gibb, A. (2007). Future opportunities for offsite in the UK. Construction Management and Economics, 25(6), 585–595.CrossRef Goodier, C., & Gibb, A. (2007). Future opportunities for offsite in the UK. Construction Management and Economics, 25(6), 585–595.CrossRef
3.
Zurück zum Zitat Tam, V. W. Y., Tam, C. M., et al. (2006). Cutting construction wastes by prefabrication. International Journal of Construction Management, 6(1), 15–25.CrossRef Tam, V. W. Y., Tam, C. M., et al. (2006). Cutting construction wastes by prefabrication. International Journal of Construction Management, 6(1), 15–25.CrossRef
4.
Zurück zum Zitat Leu, S. S., & Hwang, S. T. (2002). GA-based resource-constrained flow-shop scheduling model for mixed precast production. Automation in Construction, 11, 439–452.CrossRef Leu, S. S., & Hwang, S. T. (2002). GA-based resource-constrained flow-shop scheduling model for mixed precast production. Automation in Construction, 11, 439–452.CrossRef
5.
Zurück zum Zitat Sun, W., & Li, H. (2018). Identification of prefabricated building risk factors based on entropy method. Value Engineering, 28, 63–65. Sun, W., & Li, H. (2018). Identification of prefabricated building risk factors based on entropy method. Value Engineering, 28, 63–65.
6.
Zurück zum Zitat Qu, F. Q., Chen, C., & Yan, W. (2019). Quality risk assessment of prefabricated building components based on ANP—FUZZY. Journal of Civil Engineering and Management, 36(3), 92–98. Qu, F. Q., Chen, C., & Yan, W. (2019). Quality risk assessment of prefabricated building components based on ANP—FUZZY. Journal of Civil Engineering and Management, 36(3), 92–98.
7.
Zurück zum Zitat Chen, W., Fu, J., et al. (2016). Grey clustering evaluation model for construction safety of fabricated building project. China Safety Science Journal, 26(11), 70–75. Chen, W., Fu, J., et al. (2016). Grey clustering evaluation model for construction safety of fabricated building project. China Safety Science Journal, 26(11), 70–75.
8.
Zurück zum Zitat Chang, C. G., & Wu, X. (2018). Research on the safety risk assessment of assembly building construction. Construction Economy, 39(8), 49–52. Chang, C. G., & Wu, X. (2018). Research on the safety risk assessment of assembly building construction. Construction Economy, 39(8), 49–52.
9.
Zurück zum Zitat Qi, B. K., Zhu, Y., & Fan, W. Y. (2016). Risk factor identification method of the whole life cycle in prefabricated construction. Journal of Shenyang Jianzhu University (Social Science), 18(3), 257–261. Qi, B. K., Zhu, Y., & Fan, W. Y. (2016). Risk factor identification method of the whole life cycle in prefabricated construction. Journal of Shenyang Jianzhu University (Social Science), 18(3), 257–261.
10.
Zurück zum Zitat Wang, R. J., & Wang, C. J. (2019). Identification and countermeasure for key risk factors in fabricated building projects on SNA. Journal of Shandong Agricultural University (Natural Science Edition), 50(2), 000–000. Wang, R. J., & Wang, C. J. (2019). Identification and countermeasure for key risk factors in fabricated building projects on SNA. Journal of Shandong Agricultural University (Natural Science Edition), 50(2), 000–000.
11.
Zurück zum Zitat Guo, K. (2014). Security risk evaluation of China’s coal enterprises based on risk matrix. China Mining Magazine, 23(5), 23–27. Guo, K. (2014). Security risk evaluation of China’s coal enterprises based on risk matrix. China Mining Magazine, 23(5), 23–27.
12.
Zurück zum Zitat SAATY, T. L. (2001). Decision Making with Dependence and Feedback: The Analytic Network Process. Pittsburgh: RWS Publications. SAATY, T. L. (2001). Decision Making with Dependence and Feedback: The Analytic Network Process. Pittsburgh: RWS Publications.
13.
Zurück zum Zitat Li, H. X. (1995). Factor spaces and mathematical frame of knowledge representation (VIII)—Variable weights analysis. Fuzzy Systems and Mathematics, 9(3), 1–9. Li, H. X. (1995). Factor spaces and mathematical frame of knowledge representation (VIII)—Variable weights analysis. Fuzzy Systems and Mathematics, 9(3), 1–9.
14.
Zurück zum Zitat Liu, J. (2017). Risk assessment of decision-making stage of green building based on variable weight principle. Journal of WUT (Information & Management Engineering), 39(2), 168–171. Liu, J. (2017). Risk assessment of decision-making stage of green building based on variable weight principle. Journal of WUT (Information & Management Engineering), 39(2), 168–171.
15.
Zurück zum Zitat Zhao, B., Yan, J., & Feng, K. (2005). The application of the synthetic method of variable weight to efficiency evaluation of management of construction machinery. Construction Mechanization, 3, 59–62. Zhao, B., Yan, J., & Feng, K. (2005). The application of the synthetic method of variable weight to efficiency evaluation of management of construction machinery. Construction Mechanization, 3, 59–62.
Metadaten
Titel
Risk Assessment of Prefabricated Buildings for Whole Life Cycle Based on Risk Matrix—VWAHP
verfasst von
Xuexue Yang
Qiang Liu
Copyright-Jahr
2021
Verlag
Springer Singapore
DOI
https://doi.org/10.1007/978-981-15-8892-1_141