Skip to main content

2016 | OriginalPaper | Buchkapitel

Scheduling Identical Parallel Machines with a Fixed Number of Delivery Dates

verfasst von : Arne Mensendiek, Jatinder N. D. Gupta

Erschienen in: Operations Research Proceedings 2014

Verlag: Springer International Publishing

Aktivieren Sie unsere intelligente Suche, um passende Fachinhalte oder Patente zu finden.

search-config
loading …

Abstract

We consider the scheduling problem of a manufacturer that has to process a set of jobs on identical parallel machines where jobs can only be delivered at a given number of delivery dates and the total tardiness is to be minimized. In order to avoid tardiness, jobs have to be both, processed and delivered before or at their due dates. Such settings are frequently found in industry, for example when a manufacturer relies on a logistics provider that picks up completed jobs twice a day. The scheduling problem with fixed delivery dates where the delivery dates are considered as an exogenously given parameter for the manufacturer’ scheduling decisions can be solved by various optimal and heuristic solution procedures. Here, we consider a variant of this problem where only the number of deliveries is fixed and the delivery dates can be set arbitrarily. For example, a manufacturer may be entitled to assign the logistics provider two pick-up times per day and decide on the exact times of these pick-ups. Then, the machine schedule and the delivery dates can be determined simultaneously which may significantly improve adherence to due dates. Our findings can provide valuable input when it comes to evaluating and selecting distribution strategies that offer a different extent of flexibility regarding the delivery dates.

Sie haben noch keine Lizenz? Dann Informieren Sie sich jetzt über unsere Produkte:

Springer Professional "Wirtschaft+Technik"

Online-Abonnement

Mit Springer Professional "Wirtschaft+Technik" erhalten Sie Zugriff auf:

  • über 102.000 Bücher
  • über 537 Zeitschriften

aus folgenden Fachgebieten:

  • Automobil + Motoren
  • Bauwesen + Immobilien
  • Business IT + Informatik
  • Elektrotechnik + Elektronik
  • Energie + Nachhaltigkeit
  • Finance + Banking
  • Management + Führung
  • Marketing + Vertrieb
  • Maschinenbau + Werkstoffe
  • Versicherung + Risiko

Jetzt Wissensvorsprung sichern!

Springer Professional "Wirtschaft"

Online-Abonnement

Mit Springer Professional "Wirtschaft" erhalten Sie Zugriff auf:

  • über 67.000 Bücher
  • über 340 Zeitschriften

aus folgenden Fachgebieten:

  • Bauwesen + Immobilien
  • Business IT + Informatik
  • Finance + Banking
  • Management + Führung
  • Marketing + Vertrieb
  • Versicherung + Risiko




Jetzt Wissensvorsprung sichern!

Literatur
1.
Zurück zum Zitat Matsuo, H.: The weighted total tardiness problem with fixed shipping times and overtime utilization. Oper. Res. 36(2), 293–307 (1988)CrossRef Matsuo, H.: The weighted total tardiness problem with fixed shipping times and overtime utilization. Oper. Res. 36(2), 293–307 (1988)CrossRef
2.
Zurück zum Zitat Hall, N.G., Lesaoana, M., Potts, C.N.: Scheduling with fixed delivery dates. Oper. Res. 49(1), 134–144 (2001)CrossRef Hall, N.G., Lesaoana, M., Potts, C.N.: Scheduling with fixed delivery dates. Oper. Res. 49(1), 134–144 (2001)CrossRef
3.
Zurück zum Zitat Mensendiek, A., Gupta, J.N.D., Herrmann, J.: Scheduling identical parallel machines with fixed delivery dates to minimize total tardiness. Eur. J. Oper. Res. 243 (2), 514–522 (2015) Mensendiek, A., Gupta, J.N.D., Herrmann, J.: Scheduling identical parallel machines with fixed delivery dates to minimize total tardiness. Eur. J. Oper. Res. 243 (2), 514–522 (2015)
4.
Zurück zum Zitat Li, K.P., Ganesan, V.K., Sivakumar, A.I.: Synchronized scheduling of assembly and multi-destination air-transportation in a consumer electronics supply chain. Int. J. Prod. Res. 43(13), 2671–2685 (2005)CrossRef Li, K.P., Ganesan, V.K., Sivakumar, A.I.: Synchronized scheduling of assembly and multi-destination air-transportation in a consumer electronics supply chain. Int. J. Prod. Res. 43(13), 2671–2685 (2005)CrossRef
5.
Zurück zum Zitat Stecke, K.E., Zhao, X.: Production and transportation integration for a make-to-order manufacturing company with a commit-to-delivery business mode. Manuf. Serv. Oper. Manage. 9(2), 206–224 (2007) Stecke, K.E., Zhao, X.: Production and transportation integration for a make-to-order manufacturing company with a commit-to-delivery business mode. Manuf. Serv. Oper. Manage. 9(2), 206–224 (2007)
6.
Zurück zum Zitat Ma, H.L., Chan, F.T.S., Chung, S.H.: Minimising earliness and tardiness by integrating production scheduling with shipping information. Int. J. Prod. Res. 51(8), 2253–2267 (2012)CrossRef Ma, H.L., Chan, F.T.S., Chung, S.H.: Minimising earliness and tardiness by integrating production scheduling with shipping information. Int. J. Prod. Res. 51(8), 2253–2267 (2012)CrossRef
7.
Zurück zum Zitat Chen, Z.-L.: Integrated production and distribution operations: taxonomy, models, and review. In: Simchi-Levi, D., Wu, S.D., Shen, Z.-J. (eds.) Handbook of Quantitative Supply Chain Analysis: Modeling in the E-Business Era, pp. 711–740. Springer, New York (2004)CrossRef Chen, Z.-L.: Integrated production and distribution operations: taxonomy, models, and review. In: Simchi-Levi, D., Wu, S.D., Shen, Z.-J. (eds.) Handbook of Quantitative Supply Chain Analysis: Modeling in the E-Business Era, pp. 711–740. Springer, New York (2004)CrossRef
8.
Zurück zum Zitat Chen, Z.-L.: Integrated production and outbound distribution scheduling: review and extensions. Oper. Res. 58(1), 130–148 (2010)CrossRef Chen, Z.-L.: Integrated production and outbound distribution scheduling: review and extensions. Oper. Res. 58(1), 130–148 (2010)CrossRef
9.
Zurück zum Zitat Chandra, P., Fisher, M.L.: Coordination of production and distribution planning. Eur. J. Oper. Res. 72(3), 503–517 (1994)CrossRef Chandra, P., Fisher, M.L.: Coordination of production and distribution planning. Eur. J. Oper. Res. 72(3), 503–517 (1994)CrossRef
10.
Zurück zum Zitat Chen, Z.-L., Vairaktarakis, G.L.: Integrated scheduling of production and distribution operations. Manage. Sci. 51(4), 614–628 (2005)CrossRef Chen, Z.-L., Vairaktarakis, G.L.: Integrated scheduling of production and distribution operations. Manage. Sci. 51(4), 614–628 (2005)CrossRef
11.
Zurück zum Zitat Garey, M.R., Johnson, D.S.: Computers and Intractability—A Guide to the Theory of NP-Completeness. Freeman, New York (1979) Garey, M.R., Johnson, D.S.: Computers and Intractability—A Guide to the Theory of NP-Completeness. Freeman, New York (1979)
Metadaten
Titel
Scheduling Identical Parallel Machines with a Fixed Number of Delivery Dates
verfasst von
Arne Mensendiek
Jatinder N. D. Gupta
Copyright-Jahr
2016
DOI
https://doi.org/10.1007/978-3-319-28697-6_55