Skip to main content
Erschienen in: Journal of Scheduling 6/2019

23.03.2019

Sequencing assembly lines to facilitate synchronized just-in-time part supply

verfasst von: Simon Emde, Lukas Polten

Erschienen in: Journal of Scheduling | Ausgabe 6/2019

Einloggen

Aktivieren Sie unsere intelligente Suche, um passende Fachinhalte oder Patente zu finden.

search-config
loading …

Abstract

The problem of sequencing assembly lines consists of determining the order in which a given set of products is launched down the line. Since individual products may require different parts in different quantities, the production sequence has a big influence on line-side inventory. Classically, sequences are often optimized with the goal of attaining level schedules, i.e., the part demand should be smooth during the planning horizon. However, this approach does not necessarily work well if parts are delivered at discrete points in time in bulk quantities. In this paper, we consider a production system where bins of parts are delivered periodically by a tow train from a central depot at fixed times. Due to the limited space at the assembly line, the maximum number of bins in stock at any time at any station should be minimal. We propose an exact solution method based on combinatorial Benders decomposition as well as bounding procedures and heuristics for this problem. The algorithms are shown to perform well both on instances from the literature and on new data sets. We also investigate whether classic level scheduling methods are effective at reducing line-side stock in an assembly system supplied by tow train, and to what degree line-side stock can be traded off for more frequent deliveries.

Sie haben noch keine Lizenz? Dann Informieren Sie sich jetzt über unsere Produkte:

Springer Professional "Wirtschaft+Technik"

Online-Abonnement

Mit Springer Professional "Wirtschaft+Technik" erhalten Sie Zugriff auf:

  • über 102.000 Bücher
  • über 537 Zeitschriften

aus folgenden Fachgebieten:

  • Automobil + Motoren
  • Bauwesen + Immobilien
  • Business IT + Informatik
  • Elektrotechnik + Elektronik
  • Energie + Nachhaltigkeit
  • Finance + Banking
  • Management + Führung
  • Marketing + Vertrieb
  • Maschinenbau + Werkstoffe
  • Versicherung + Risiko

Jetzt Wissensvorsprung sichern!

Springer Professional "Wirtschaft"

Online-Abonnement

Mit Springer Professional "Wirtschaft" erhalten Sie Zugriff auf:

  • über 67.000 Bücher
  • über 340 Zeitschriften

aus folgenden Fachgebieten:

  • Bauwesen + Immobilien
  • Business IT + Informatik
  • Finance + Banking
  • Management + Führung
  • Marketing + Vertrieb
  • Versicherung + Risiko




Jetzt Wissensvorsprung sichern!

Literatur
Zurück zum Zitat Akgündüz, O. S., & Tunalı, S. (2011). A review of the current applications of genetic algorithms in mixed-model assembly line sequencing. International Journal of Production Research, 49(15), 4483–4503.CrossRef Akgündüz, O. S., & Tunalı, S. (2011). A review of the current applications of genetic algorithms in mixed-model assembly line sequencing. International Journal of Production Research, 49(15), 4483–4503.CrossRef
Zurück zum Zitat Bard, J. F., Dar-Elj, E., & Shtub, A. (1992). An analytic framework for sequencing mixed model assembly lines. The International Journal of Production Research, 30(1), 35–48.CrossRef Bard, J. F., Dar-Elj, E., & Shtub, A. (1992). An analytic framework for sequencing mixed model assembly lines. The International Journal of Production Research, 30(1), 35–48.CrossRef
Zurück zum Zitat Battini, D., Boysen, N., & Emde, S. (2013). Just-in-time supermarkets for part supply in the automobile industry. Journal of Management Control, 24(2), 209–217.CrossRef Battini, D., Boysen, N., & Emde, S. (2013). Just-in-time supermarkets for part supply in the automobile industry. Journal of Management Control, 24(2), 209–217.CrossRef
Zurück zum Zitat Bautista, J., Companys, R., & Corominas, A. (1996). Heuristics and exact algorithms for solving the Monden problem. European Journal of Operational Research, 88(1), 101–113.CrossRef Bautista, J., Companys, R., & Corominas, A. (1996). Heuristics and exact algorithms for solving the Monden problem. European Journal of Operational Research, 88(1), 101–113.CrossRef
Zurück zum Zitat Benders, J. F. (1962). Partitioning procedures for solving mixed-variables programming problems. Numerische Mathematik, 4(1), 238–252.CrossRef Benders, J. F. (1962). Partitioning procedures for solving mixed-variables programming problems. Numerische Mathematik, 4(1), 238–252.CrossRef
Zurück zum Zitat Boysen, N., & Emde, S. (2014). Scheduling the part supply of mixed-model assembly lines in line-integrated supermarkets. European Journal of Operational Research, 239(3), 820–829.CrossRef Boysen, N., & Emde, S. (2014). Scheduling the part supply of mixed-model assembly lines in line-integrated supermarkets. European Journal of Operational Research, 239(3), 820–829.CrossRef
Zurück zum Zitat Boysen, N., Emde, S., Hoeck, M., & Kauderer, M. (2015). Part logistics in the automotive industry: Decision problems, literature review and research agenda. European Journal of Operational Research, 242(1), 107–120.CrossRef Boysen, N., Emde, S., Hoeck, M., & Kauderer, M. (2015). Part logistics in the automotive industry: Decision problems, literature review and research agenda. European Journal of Operational Research, 242(1), 107–120.CrossRef
Zurück zum Zitat Boysen, N., Fliedner, M., & Scholl, A. (2008). Sequencing mixed-model assembly lines to minimize part inventory cost. OR Spectrum, 30(3), 611–633.CrossRef Boysen, N., Fliedner, M., & Scholl, A. (2008). Sequencing mixed-model assembly lines to minimize part inventory cost. OR Spectrum, 30(3), 611–633.CrossRef
Zurück zum Zitat Boysen, N., Fliedner, M., & Scholl, A. (2009a). Level scheduling for batched JIT supply. Flexible Services and Manufacturing Journal, 21(1–2), 31–50.CrossRef Boysen, N., Fliedner, M., & Scholl, A. (2009a). Level scheduling for batched JIT supply. Flexible Services and Manufacturing Journal, 21(1–2), 31–50.CrossRef
Zurück zum Zitat Boysen, N., Fliedner, M., & Scholl, A. (2009b). Level scheduling of mixed-model assembly lines under storage constraints. International Journal of Production Research, 47(10), 2669–2684.CrossRef Boysen, N., Fliedner, M., & Scholl, A. (2009b). Level scheduling of mixed-model assembly lines under storage constraints. International Journal of Production Research, 47(10), 2669–2684.CrossRef
Zurück zum Zitat Boysen, N., Fliedner, M., & Scholl, A. (2009c). Sequencing mixed-model assembly lines: Survey, classification and model critique. European Journal of Operational Research, 192(2), 349–373.CrossRef Boysen, N., Fliedner, M., & Scholl, A. (2009c). Sequencing mixed-model assembly lines: Survey, classification and model critique. European Journal of Operational Research, 192(2), 349–373.CrossRef
Zurück zum Zitat Choi, W., & Lee, Y. (2002). A dynamic part-feeding system for an automotive assembly line. Computers & industrial engineering, 43(1), 123–134.CrossRef Choi, W., & Lee, Y. (2002). A dynamic part-feeding system for an automotive assembly line. Computers & industrial engineering, 43(1), 123–134.CrossRef
Zurück zum Zitat Codato, G., & Fischetti, M. (2006). Combinatorial Benders’ cuts for mixed-integer linear programming. Operations Research, 54(4), 756–766.CrossRef Codato, G., & Fischetti, M. (2006). Combinatorial Benders’ cuts for mixed-integer linear programming. Operations Research, 54(4), 756–766.CrossRef
Zurück zum Zitat Emde, S. (2017a). Optimally scheduling interfering and non-interfering cranes. Naval Research Logistics (NRL), 64(6), 476–489.CrossRef Emde, S. (2017a). Optimally scheduling interfering and non-interfering cranes. Naval Research Logistics (NRL), 64(6), 476–489.CrossRef
Zurück zum Zitat Emde, S. (2017b). Scheduling the replenishment of just-in-time supermarkets in assembly plants. OR Spectrum, 39(1), 321.CrossRef Emde, S. (2017b). Scheduling the replenishment of just-in-time supermarkets in assembly plants. OR Spectrum, 39(1), 321.CrossRef
Zurück zum Zitat Emde, S., & Boysen, N. (2012a). Optimally locating in-house logistics areas to facilitate JIT-supply of mixed-model assembly lines. International Journal of Production Economics, 135(1), 393–402.CrossRef Emde, S., & Boysen, N. (2012a). Optimally locating in-house logistics areas to facilitate JIT-supply of mixed-model assembly lines. International Journal of Production Economics, 135(1), 393–402.CrossRef
Zurück zum Zitat Emde, S., & Boysen, N. (2012b). Optimally routing and scheduling tow trains for JIT-supply of mixed-model assembly lines. European Journal of Operational Research, 217(2), 287–299. Emde, S., & Boysen, N. (2012b). Optimally routing and scheduling tow trains for JIT-supply of mixed-model assembly lines. European Journal of Operational Research, 217(2), 287–299.
Zurück zum Zitat Emde, S., Fliedner, M., & Boysen, N. (2012). Optimally loading tow trains for just-in-time supply of mixed-model assembly lines. IIE Transactions, 44(2), 121–135.CrossRef Emde, S., Fliedner, M., & Boysen, N. (2012). Optimally loading tow trains for just-in-time supply of mixed-model assembly lines. IIE Transactions, 44(2), 121–135.CrossRef
Zurück zum Zitat Emde, S., & Gendreau, M. (2017). Scheduling in-house transport vehicles to feed parts to automotive assembly lines. European Journal of Operational Research, 260(1), 255–267.CrossRef Emde, S., & Gendreau, M. (2017). Scheduling in-house transport vehicles to feed parts to automotive assembly lines. European Journal of Operational Research, 260(1), 255–267.CrossRef
Zurück zum Zitat Fliedner, M., Boysen, N., & Scholl, A. (2011). On the part inventory model sequencing problem: Complexity and beam search heuristic. Journal of Scheduling, 14(1), 17–25.CrossRef Fliedner, M., Boysen, N., & Scholl, A. (2011). On the part inventory model sequencing problem: Complexity and beam search heuristic. Journal of Scheduling, 14(1), 17–25.CrossRef
Zurück zum Zitat Garey, M., & Johnson, D. (1979). Computers and intractability: A guide to the theory of NP-hardness. San Francisco, CA: WH Freeman. Garey, M., & Johnson, D. (1979). Computers and intractability: A guide to the theory of NP-hardness. San Francisco, CA: WH Freeman.
Zurück zum Zitat Giordano, F., & Schiraldi, M. M. (2013). On just-in-time production leveling. In M. M. Schiraldi (Ed.), Operations management (pp. 141–163). Rijeka: InTech. Giordano, F., & Schiraldi, M. M. (2013). On just-in-time production leveling. In M. M. Schiraldi (Ed.), Operations management (pp. 141–163). Rijeka: InTech.
Zurück zum Zitat Golz, J., Gujjula, R., Günther, H.-O., Rinderer, S., & Ziegler, M. (2012). Part feeding at high-variant mixed-model assembly lines. Flexible Services and Manufacturing Journal, 24(2), 119–141.CrossRef Golz, J., Gujjula, R., Günther, H.-O., Rinderer, S., & Ziegler, M. (2012). Part feeding at high-variant mixed-model assembly lines. Flexible Services and Manufacturing Journal, 24(2), 119–141.CrossRef
Zurück zum Zitat Hooker, J. N., & Ottosson, G. (2003). Logic-based Benders decomposition. Mathematical Programming, 96(1), 33–60.CrossRef Hooker, J. N., & Ottosson, G. (2003). Logic-based Benders decomposition. Mathematical Programming, 96(1), 33–60.CrossRef
Zurück zum Zitat Kubiak, W. (1993). Minimizing variation of production rates in just-in-time systems: A survey. European Journal of Operational Research, 66(3), 259–271.CrossRef Kubiak, W. (1993). Minimizing variation of production rates in just-in-time systems: A survey. European Journal of Operational Research, 66(3), 259–271.CrossRef
Zurück zum Zitat Limère, V., Landeghem, H. V., Goetschalckx, M., Aghezzaf, E.-H., & McGinnis, L. F. (2012). Optimising part feeding in the automotive assembly industry: Deciding between kitting and line stocking. International Journal of Production Research, 50(15), 4046–4060.CrossRef Limère, V., Landeghem, H. V., Goetschalckx, M., Aghezzaf, E.-H., & McGinnis, L. F. (2012). Optimising part feeding in the automotive assembly industry: Deciding between kitting and line stocking. International Journal of Production Research, 50(15), 4046–4060.CrossRef
Zurück zum Zitat Monden, Y. (2011). Toyota production system: An integrated approach to just-in-time (4th ed.). Boca Raton, FL: CRC Press.CrossRef Monden, Y. (2011). Toyota production system: An integrated approach to just-in-time (4th ed.). Boca Raton, FL: CRC Press.CrossRef
Zurück zum Zitat Pereira, J., & Vilà, M. (2015). An exact algorithm for the mixed-model level scheduling problem. International Journal of Production Research, 53(19), 5809–5825.CrossRef Pereira, J., & Vilà, M. (2015). An exact algorithm for the mixed-model level scheduling problem. International Journal of Production Research, 53(19), 5809–5825.CrossRef
Zurück zum Zitat Rahmaniani, R., Crainic, T. G., Gendreau, M., & Rei, W. (2017). The Benders decomposition algorithm: A literature review. European Journal of Operational Research, 259(3), 801–817.CrossRef Rahmaniani, R., Crainic, T. G., Gendreau, M., & Rei, W. (2017). The Benders decomposition algorithm: A literature review. European Journal of Operational Research, 259(3), 801–817.CrossRef
Zurück zum Zitat Solnon, C., Cung, V. D., Nguyen, A., & Artigues, C. (2008). The car sequencing problem: Overview of state-of-the-art methods and industrial case-study of the ROADEF’2005 challenge problem. European Journal of Operational Research, 191(3), 912–927.CrossRef Solnon, C., Cung, V. D., Nguyen, A., & Artigues, C. (2008). The car sequencing problem: Overview of state-of-the-art methods and industrial case-study of the ROADEF’2005 challenge problem. European Journal of Operational Research, 191(3), 912–927.CrossRef
Zurück zum Zitat Yavuz, M., & Ergin, H. (2018). Advanced constraint propagation for the combined car sequencing and level scheduling problem. Computers & Operations Research, 100, 128–139.CrossRef Yavuz, M., & Ergin, H. (2018). Advanced constraint propagation for the combined car sequencing and level scheduling problem. Computers & Operations Research, 100, 128–139.CrossRef
Metadaten
Titel
Sequencing assembly lines to facilitate synchronized just-in-time part supply
verfasst von
Simon Emde
Lukas Polten
Publikationsdatum
23.03.2019
Verlag
Springer US
Erschienen in
Journal of Scheduling / Ausgabe 6/2019
Print ISSN: 1094-6136
Elektronische ISSN: 1099-1425
DOI
https://doi.org/10.1007/s10951-019-00606-w

Weitere Artikel der Ausgabe 6/2019

Journal of Scheduling 6/2019 Zur Ausgabe