Skip to main content

2013 | OriginalPaper | Buchkapitel

25. Sequencing

verfasst von : Prof. Dr.-Ing. habil. Hermann Lödding

Erschienen in: Handbook of Manufacturing Control

Verlag: Springer Berlin Heidelberg

Aktivieren Sie unsere intelligente Suche, um passende Fachinhalte oder Patente zu finden.

search-config
loading …

Abstract

The job of sequencing is simple to describe: It determines which order in a workstation’s queue should be processed next. In order to do so it allocates every order a priority level based on defined criteria. The order with the greatest priority is the most urgent and is – when the operator at the workstation maintains the sequence – processed first. The primary task of sequencing is to adjust the actual sequence in which the orders are completed to the planned sequence in order to ensure a high schedule reliability and service level (Fig. 25.1).

Sie haben noch keine Lizenz? Dann Informieren Sie sich jetzt über unsere Produkte:

Springer Professional "Wirtschaft+Technik"

Online-Abonnement

Mit Springer Professional "Wirtschaft+Technik" erhalten Sie Zugriff auf:

  • über 102.000 Bücher
  • über 537 Zeitschriften

aus folgenden Fachgebieten:

  • Automobil + Motoren
  • Bauwesen + Immobilien
  • Business IT + Informatik
  • Elektrotechnik + Elektronik
  • Energie + Nachhaltigkeit
  • Finance + Banking
  • Management + Führung
  • Marketing + Vertrieb
  • Maschinenbau + Werkstoffe
  • Versicherung + Risiko

Jetzt Wissensvorsprung sichern!

Springer Professional "Wirtschaft"

Online-Abonnement

Mit Springer Professional "Wirtschaft" erhalten Sie Zugriff auf:

  • über 67.000 Bücher
  • über 340 Zeitschriften

aus folgenden Fachgebieten:

  • Bauwesen + Immobilien
  • Business IT + Informatik
  • Finance + Banking
  • Management + Führung
  • Marketing + Vertrieb
  • Versicherung + Risiko




Jetzt Wissensvorsprung sichern!

Springer Professional "Technik"

Online-Abonnement

Mit Springer Professional "Technik" erhalten Sie Zugriff auf:

  • über 67.000 Bücher
  • über 390 Zeitschriften

aus folgenden Fachgebieten:

  • Automobil + Motoren
  • Bauwesen + Immobilien
  • Business IT + Informatik
  • Elektrotechnik + Elektronik
  • Energie + Nachhaltigkeit
  • Maschinenbau + Werkstoffe




 

Jetzt Wissensvorsprung sichern!

Fußnoten
1
This is to be differentiated from the frequently implemented Earliest-Due-Date Rule, which determines the priority based on the due date of the entire order.
 
2
The equation requires there to be no additional replenishment orders for any of the variants in the production. Otherwise, the input of those orders closer to completion has to be taken into consideration.
 
3
This can be problematic when the workstation develops a backlog in comparison to the planned output rate. In a situation such as this, the setup time optimizing could contribute to reducing the backlog, however, this is prevented by orders delayed due to a non-setup-optimized production.
 
4
This disadvantage can also possibly be reduced by assigning orders a very high priority after they have waited a specific amount of time.
 
Literatur
[Conw-67*].
Zurück zum Zitat Conway, R.W., Maxwell, W.L., Miller, L.W.: Theory of Scheduling. Addison-Wesley, Reading (1967)MATH Conway, R.W., Maxwell, W.L., Miller, L.W.: Theory of Scheduling. Addison-Wesley, Reading (1967)MATH
[Nyhu-09*].
Zurück zum Zitat Nyhuis, P., Wiendahl, H.-P.: Fundamentals of Production Logistics. Theory, Tools and Applications. Springer, Berlin (2009)CrossRef Nyhuis, P., Wiendahl, H.-P.: Fundamentals of Production Logistics. Theory, Tools and Applications. Springer, Berlin (2009)CrossRef
[Wien-97b].
Zurück zum Zitat Wiendahl, H.-P.: Fertigungsregelung. Logistische Beherrschung von Fertigungsabläufen auf Basis des Trichtermodells. Carl Hanser Verlag, Munich/Vienna (1997) Wiendahl, H.-P.: Fertigungsregelung. Logistische Beherrschung von Fertigungsabläufen auf Basis des Trichtermodells. Carl Hanser Verlag, Munich/Vienna (1997)
[Yu-01].
Zurück zum Zitat Yu, K.-W.: Terminkennlinie. Eine Beschreibungsmethodik für die Terminabweichung im Produktionsbereich. VDI Progress Reports, Series 2, No. 576, Düsseldorf (2001) Yu, K.-W.: Terminkennlinie. Eine Beschreibungsmethodik für die Terminabweichung im Produktionsbereich. VDI Progress Reports, Series 2, No. 576, Düsseldorf (2001)
Metadaten
Titel
Sequencing
verfasst von
Prof. Dr.-Ing. habil. Hermann Lödding
Copyright-Jahr
2013
Verlag
Springer Berlin Heidelberg
DOI
https://doi.org/10.1007/978-3-642-24458-2_25