Skip to main content

Tipp

Weitere Kapitel dieses Buchs durch Wischen aufrufen

2018 | OriginalPaper | Buchkapitel

26. BIM for 3D Printing in Construction

verfasst von : Jochen Teizer, Alexander Blickle, Tobias King, Olaf Leitzbach, Daniel Guenther, Hannah Mattern, Markus König

Erschienen in: Building Information Modeling

Verlag: Springer International Publishing

share
TEILEN

Abstract

Three-dimensional printing – often known as additive manufacturing or the layered production of 3D objects – has been the focus of attention in the media at present and a subject that arouses great expectations in the construction industry. While the topic is rapidly emerging, 3D printing has the potential of simplifying key processes in the facility lifecycle, for example, by following design to production principles and reducing waste while increasing the quality of the final product. A pivotal piece in the success of 3D printing in construction is the Building Information Modeling (BIM) method. Since BIM already serves as a rich source of geometric information for commercially-existing, large scale, and automated 3D printing machines, 3D printing robots co-existing with human workers on construction sites will eventually need scheduling and assembly sequence information as well to maintain safety and productivity. As suitable 3D printing techniques and materials are still parts of wider research efforts, applications by early adopters in the construction industry demonstrate how 3D printing may benefit and at some point in the future complement existing construction methods like prefabrication or modularization.

Sie möchten Zugang zu diesem Inhalt erhalten? Dann informieren Sie sich jetzt über unsere Produkte:

Springer Professional "Wirtschaft+Technik"

Online-Abonnement

Mit Springer Professional "Wirtschaft+Technik" erhalten Sie Zugriff auf:

  • über 69.000 Bücher
  • über 500 Zeitschriften

aus folgenden Fachgebieten:

  • Automobil + Motoren
  • Bauwesen + Immobilien
  • Business IT + Informatik
  • Elektrotechnik + Elektronik
  • Energie + Nachhaltigkeit
  • Finance + Banking
  • Management + Führung
  • Marketing + Vertrieb
  • Maschinenbau + Werkstoffe
  • Versicherung + Risiko

Jetzt 90 Tage mit der neuen Mini-Lizenz testen!

Springer Professional "Technik"

Online-Abonnement

Mit Springer Professional "Technik" erhalten Sie Zugriff auf:

  • über 50.000 Bücher
  • über 380 Zeitschriften

aus folgenden Fachgebieten:

  • Automobil + Motoren
  • Bauwesen + Immobilien
  • Business IT + Informatik
  • Elektrotechnik + Elektronik
  • Energie + Nachhaltigkeit
  • Maschinenbau + Werkstoffe



 


Jetzt 90 Tage mit der neuen Mini-Lizenz testen!

Springer Professional "Wirtschaft"

Online-Abonnement

Mit Springer Professional "Wirtschaft" erhalten Sie Zugriff auf:

  • über 58.000 Bücher
  • über 300 Zeitschriften

aus folgenden Fachgebieten:

  • Bauwesen + Immobilien
  • Business IT + Informatik
  • Finance + Banking
  • Management + Führung
  • Marketing + Vertrieb
  • Versicherung + Risiko





Jetzt 90 Tage mit der neuen Mini-Lizenz testen!

Literatur
Zurück zum Zitat Babič, N. Č., Podbreznik, P., & Rebolj, D. (2010). Integrating resource production and construction using BIM. Automation in Construction, 19(5), 539–543. CrossRef Babič, N. Č., Podbreznik, P., & Rebolj, D. (2010). Integrating resource production and construction using BIM. Automation in Construction, 19(5), 539–543. CrossRef
Zurück zum Zitat Bruckmann, T., Lalom, W., Nguyen, K., & Salah, B. (2012). Development of a storage retrieval machine for high racks using a wire robot. In Proceedings of the ASME International Design Engineering Technical Conferences and Computers and Information in Engineering Conference (pp. 771–780). Bruckmann, T., Lalom, W., Nguyen, K., & Salah, B. (2012). Development of a storage retrieval machine for high racks using a wire robot. In Proceedings of the ASME International Design Engineering Technical Conferences and Computers and Information in Engineering Conference (pp. 771–780).
Zurück zum Zitat Bruckmann, T., Mattern, H., Spengler, A., Reichert, C., Malkwitzc, A., & Knig, M. (2016). Automated construction of masonry buildings using cable-driven parallel robots. In Proceedings of the 33rd International Symposium on Automation and Robotics in Construction, Auburn (pp. 332–340). Bruckmann, T., Mattern, H., Spengler, A., Reichert, C., Malkwitzc, A., & Knig, M. (2016). Automated construction of masonry buildings using cable-driven parallel robots. In Proceedings of the 33rd International Symposium on Automation and Robotics in Construction, Auburn (pp. 332–340).
Zurück zum Zitat Buswell, R. A., Thorpe, A., Soar, R. C., & Gibb, A. (2008). Design, data and process issues for mega-scale rapid manufacturing machines used for construction. Automation in Construction, 17(8), 923–929. CrossRef Buswell, R. A., Thorpe, A., Soar, R. C., & Gibb, A. (2008). Design, data and process issues for mega-scale rapid manufacturing machines used for construction. Automation in Construction, 17(8), 923–929. CrossRef
Zurück zum Zitat Cheng, T., Mantripragada, U., Teizer, J., & Vela, P. A. (2012). Automated trajectory and path planning analysis based on ultra wideband data. ASCE Journal of Computing in Civil Engineering, Reston, Virginia, 26, 151–160. CrossRef Cheng, T., Mantripragada, U., Teizer, J., & Vela, P. A. (2012). Automated trajectory and path planning analysis based on ultra wideband data. ASCE Journal of Computing in Civil Engineering, Reston, Virginia, 26, 151–160. CrossRef
Zurück zum Zitat Costa, G., & Madrazo, L. (2015). Connecting building component catalogues with BIM models using semantic technologies. Automation in Construction, 57, 239–248. CrossRef Costa, G., & Madrazo, L. (2015). Connecting building component catalogues with BIM models using semantic technologies. Automation in Construction, 57, 239–248. CrossRef
Zurück zum Zitat Ding, L., Wei, R., & Che, H. (2014). Development of a BIM-based automated construction system. Procedia Engineering, 85, 123–131. CrossRef Ding, L., Wei, R., & Che, H. (2014). Development of a BIM-based automated construction system. Procedia Engineering, 85, 123–131. CrossRef
Zurück zum Zitat Guenther D. (2015). 3D printing – The state of the technology and the future of this process. Detail – Technology (pp. 596–600). Guenther D. (2015). 3D printing – The state of the technology and the future of this process. Detail – Technology (pp. 596–600).
Zurück zum Zitat Golovina, O., Teizer, J., & Pradhananga, N. (2016). Heat map generation for predictive safety planning: preventing struck-by and near miss interactions between workers-on-foot and construction equipment. Automation in Construction, Elsevier, 71, 99–115. CrossRef Golovina, O., Teizer, J., & Pradhananga, N. (2016). Heat map generation for predictive safety planning: preventing struck-by and near miss interactions between workers-on-foot and construction equipment. Automation in Construction, Elsevier, 71, 99–115. CrossRef
Zurück zum Zitat Khoshnevis, B. (2004). Automated construction by contour crafting-related robotics and information technologies. Automation in Construction, 12, 5–19. CrossRef Khoshnevis, B. (2004). Automated construction by contour crafting-related robotics and information technologies. Automation in Construction, 12, 5–19. CrossRef
Zurück zum Zitat Khoshnevis, B., Hwang, D., Yao, K., & Yeh, Z. (2006). Mega-scale fabrication by contour crafting. Industrial and Systems Engineering, 1, 301–320. CrossRef Khoshnevis, B., Hwang, D., Yao, K., & Yeh, Z. (2006). Mega-scale fabrication by contour crafting. Industrial and Systems Engineering, 1, 301–320. CrossRef
Zurück zum Zitat Kumar, S. S., & Cheng, J. C. (2015). A BIM-based automated site layout planning framework for congested construction sites. Automation in Construction, 59, 24–37. CrossRef Kumar, S. S., & Cheng, J. C. (2015). A BIM-based automated site layout planning framework for congested construction sites. Automation in Construction, 59, 24–37. CrossRef
Zurück zum Zitat Lee, G., Kim, H.-H., Lee, C.-J., Ham, S.-I., Yun, S.-H., Cho, H., Kim, B. K., Kim, G. T., & Kim, K. (2009). A laser-technology-based lifting-path tracking system for a robotic tower crane. Automation in Construction, 18(7), 865–874. CrossRef Lee, G., Kim, H.-H., Lee, C.-J., Ham, S.-I., Yun, S.-H., Cho, H., Kim, B. K., Kim, G. T., & Kim, K. (2009). A laser-technology-based lifting-path tracking system for a robotic tower crane. Automation in Construction, 18(7), 865–874. CrossRef
Zurück zum Zitat Lee, G., Cho, J., Ham, S., Lee, T., Lee, G., Yun, S.-H., & Yang, H.-J. (2012). A BIM- and sensor-based tower crane navigation system for blind lifts. Automation in Construction, 26, 1–10. CrossRef Lee, G., Cho, J., Ham, S., Lee, T., Lee, G., Yun, S.-H., & Yang, H.-J. (2012). A BIM- and sensor-based tower crane navigation system for blind lifts. Automation in Construction, 26, 1–10. CrossRef
Zurück zum Zitat Landsberger, S. E., & Sheridan, T. B. (1985). A new design for parallel link manipulator. In Proceedings Systems Man and Cybernetics Conference (pp. 812–814). Landsberger, S. E., & Sheridan, T. B. (1985). A new design for parallel link manipulator. In Proceedings Systems Man and Cybernetics Conference (pp. 812–814).
Zurück zum Zitat Lim, S., Buswell, R., Le, T., Austin, S., Gibb, A., & Thorpe, T. (2011). Developments in construction-scale additive manufacturing processes. Automation in Construction, 21, 262–268. CrossRef Lim, S., Buswell, R., Le, T., Austin, S., Gibb, A., & Thorpe, T. (2011). Developments in construction-scale additive manufacturing processes. Automation in Construction, 21, 262–268. CrossRef
Zurück zum Zitat Mattern, H., Bruckmann, T., Spengler, A., & Knig, M. (2016). Simulation of automated construction using wire robots. In Proceedings of the 2016 Winter Simulation Conference, Washington, DC. Mattern, H., Bruckmann, T., Spengler, A., & Knig, M. (2016). Simulation of automated construction using wire robots. In Proceedings of the 2016 Winter Simulation Conference, Washington, DC.
Zurück zum Zitat McGraw-Hill Construction. (2011). Prefabrication and Modularization: Increasing Productivity in the Construction Industry. SmartMarket report. McGraw-Hill Construction. (2011). Prefabrication and Modularization: Increasing Productivity in the Construction Industry. SmartMarket report.
Zurück zum Zitat Moghadam, M., Al-Hussein, M., & Umut, K. (2012). Automation of modular design and construction through an integrated BIM/lean model. Gerontechnology, 11(2). Moghadam, M., Al-Hussein, M., & Umut, K. (2012). Automation of modular design and construction through an integrated BIM/lean model. Gerontechnology, 11(2).
Zurück zum Zitat Oesterle, S., Vansteenkiste, A., & Mirjan, A. (2012). Zero waste free-form formwork. In ICFF 2012 (pp. 258–267). Oesterle, S., Vansteenkiste, A., & Mirjan, A. (2012). Zero waste free-form formwork. In ICFF 2012 (pp. 258–267).
Zurück zum Zitat Sachs, E. M., Haggerty, J. S., Cima, M. J., & Williams P. A. (1993). Three-dimensional printing techniques, United States Patent, No. 5,204,055, Date of Patent, 20 Apr 1993. Sachs, E. M., Haggerty, J. S., Cima, M. J., & Williams P. A. (1993). Three-dimensional printing techniques, United States Patent, No. 5,204,055, Date of Patent, 20 Apr 1993.
Zurück zum Zitat Schwabe, K., Knig, M., & Teizer, J. (2016). BIM applications of rule-based checking in construction site layout planning tasks. In Proceedings of the 33rd International Symposium on Automation and Robotics in Construction, Auburn University. Schwabe, K., Knig, M., & Teizer, J. (2016). BIM applications of rule-based checking in construction site layout planning tasks. In Proceedings of the 33rd International Symposium on Automation and Robotics in Construction, Auburn University.
Zurück zum Zitat Strabag. (2016). Research, development and innovation 2015/2016. Strabag AG. Strabag. (2016). Research, development and innovation 2015/2016. Strabag AG.
Zurück zum Zitat Teizer, J., & Kahlmann, T. (2008). Range imaging as an emerging optical 3D measurement technology. Transportation Research Record: Journal of the Transportation Research Board, Washington, DC, 2040 (pp. 19–29). Teizer, J., & Kahlmann, T. (2008). Range imaging as an emerging optical 3D measurement technology. Transportation Research Record: Journal of the Transportation Research Board, Washington, DC, 2040 (pp. 19–29).
Zurück zum Zitat Teizer, J., Allread, B. S., Fullerton, C. E., & Hinze, J. (2010). Autonomous pro-active real-time construction worker and equipment operator proximity safety alert system. Automation in Construction, 19(5), 630–640. CrossRef Teizer, J., Allread, B. S., Fullerton, C. E., & Hinze, J. (2010). Autonomous pro-active real-time construction worker and equipment operator proximity safety alert system. Automation in Construction, 19(5), 630–640. CrossRef
Zurück zum Zitat Teizer, J., Venugopal, M., Teizer, W., & Felkl, J. (2012). Nanotechnology and its impact on construction: Bridging the gap between researchers and industry professionals. Construction Engineering and Management, 138(5), 594–604. CrossRef Teizer, J., Venugopal, M., Teizer, W., & Felkl, J. (2012). Nanotechnology and its impact on construction: Bridging the gap between researchers and industry professionals. Construction Engineering and Management, 138(5), 594–604. CrossRef
Zurück zum Zitat Teizer, J., Blickle, A., King, T., Leitzbach, O., & Guenther, D. (2016). Large scale 3D printing of complex geometric shapes in construction. In Proceedings of the 33rd International Symposium on Automation and Robotics in Construction, Auburn (pp. 948–956). Teizer, J., Blickle, A., King, T., Leitzbach, O., & Guenther, D. (2016). Large scale 3D printing of complex geometric shapes in construction. In Proceedings of the 33rd International Symposium on Automation and Robotics in Construction, Auburn (pp. 948–956).
Zurück zum Zitat Wang, J., Zhang, X., Shou, W., Wang, X., Xu, B., Kim, M. J., & Wu, P. (2015). A BIM-based approach for automated tower crane layout planning. Automation in Construction, 59, 168–178. CrossRef Wang, J., Zhang, X., Shou, W., Wang, X., Xu, B., Kim, M. J., & Wu, P. (2015). A BIM-based approach for automated tower crane layout planning. Automation in Construction, 59, 168–178. CrossRef
Zurück zum Zitat Wangler, T., Lloret, E., Reiter, L., Hack, N., Gramazio, F., Kohler, M., Bernhard, M., Dillenburger, B., Buchli, J., Roussel, N., & Flatt, R. (2016). Digital concrete: Opportunities and challenges. RILEM Technical Letters, 1, 67–75. CrossRef Wangler, T., Lloret, E., Reiter, L., Hack, N., Gramazio, F., Kohler, M., Bernhard, M., Dillenburger, B., Buchli, J., Roussel, N., & Flatt, R. (2016). Digital concrete: Opportunities and challenges. RILEM Technical Letters, 1, 67–75. CrossRef
Zurück zum Zitat Zhang, S., Teizer, J., Pradhananga, N., & Eastman, C. (2015). Workforce location tracking to model, visualize and analyze workspace requirements in building information models for construction safety planning. Automation in Construction, 60, 74–86. CrossRef Zhang, S., Teizer, J., Pradhananga, N., & Eastman, C. (2015). Workforce location tracking to model, visualize and analyze workspace requirements in building information models for construction safety planning. Automation in Construction, 60, 74–86. CrossRef
Metadaten
Titel
BIM for 3D Printing in Construction
verfasst von
Jochen Teizer
Alexander Blickle
Tobias King
Olaf Leitzbach
Daniel Guenther
Hannah Mattern
Markus König
Copyright-Jahr
2018
DOI
https://doi.org/10.1007/978-3-319-92862-3_26

Premium Partner