Skip to main content

2018 | OriginalPaper | Buchkapitel

118. Strategic Factors Influencing Bid/No-Bid Decision of Pakistani Contractors

verfasst von : Ahsen Maqsoom, Malik Muhammad Farjad, Muhammad Sadaat Abbas, Muhammad Ehtesham-Ul-Haque, Muhammad Irfan, Aman Ullah Malik

Erschienen in: Proceedings of the 21st International Symposium on Advancement of Construction Management and Real Estate

Verlag: Springer Singapore

Aktivieren Sie unsere intelligente Suche, um passende Fachinhalte oder Patente zu finden.

search-config
loading …

Abstract

Construction firms must have the potential to deal with various bidding situations successfully in today’s highly spirited market. The first step that firms need to consider is whether to bid or not to bid when they receive a tender call. The contractors’ decision of bid/no-bid is affected by various factors. This research aims to analyze the strategic factors influencing the bid/no-bid decision of Pakistani contractors. Data was collected by means of questionnaire survey sent to 300 contractors registered with Pakistan Engineering Council. “Method of Bid evaluation of client”, “Financial position of firm” and “Availability of required material in the region” were identified as top 3 most critical factors influencing the bid/no-bid decision. Also, it was identified that the bid/no-bid decision is highly dependent on location and macro environment of contractors. This research involves the participants from construction industry of Pakistan; the future research can be extended to other service sectors and economies.

Sie haben noch keine Lizenz? Dann Informieren Sie sich jetzt über unsere Produkte:

Springer Professional "Wirtschaft+Technik"

Online-Abonnement

Mit Springer Professional "Wirtschaft+Technik" erhalten Sie Zugriff auf:

  • über 102.000 Bücher
  • über 537 Zeitschriften

aus folgenden Fachgebieten:

  • Automobil + Motoren
  • Bauwesen + Immobilien
  • Business IT + Informatik
  • Elektrotechnik + Elektronik
  • Energie + Nachhaltigkeit
  • Finance + Banking
  • Management + Führung
  • Marketing + Vertrieb
  • Maschinenbau + Werkstoffe
  • Versicherung + Risiko

Jetzt Wissensvorsprung sichern!

Springer Professional "Technik"

Online-Abonnement

Mit Springer Professional "Technik" erhalten Sie Zugriff auf:

  • über 67.000 Bücher
  • über 390 Zeitschriften

aus folgenden Fachgebieten:

  • Automobil + Motoren
  • Bauwesen + Immobilien
  • Business IT + Informatik
  • Elektrotechnik + Elektronik
  • Energie + Nachhaltigkeit
  • Maschinenbau + Werkstoffe




 

Jetzt Wissensvorsprung sichern!

Springer Professional "Wirtschaft"

Online-Abonnement

Mit Springer Professional "Wirtschaft" erhalten Sie Zugriff auf:

  • über 67.000 Bücher
  • über 340 Zeitschriften

aus folgenden Fachgebieten:

  • Bauwesen + Immobilien
  • Business IT + Informatik
  • Finance + Banking
  • Management + Führung
  • Marketing + Vertrieb
  • Versicherung + Risiko




Jetzt Wissensvorsprung sichern!

Literatur
Zurück zum Zitat Ahmad I, Minkarah IA (1987) Optimum mark-up for bidding: a preference-uncertainty trade off approach. Civil Eng Syst 4(4):170–174CrossRef Ahmad I, Minkarah IA (1987) Optimum mark-up for bidding: a preference-uncertainty trade off approach. Civil Eng Syst 4(4):170–174CrossRef
Zurück zum Zitat Bageis AS, Fortune C (2009) Factors affecting the bid/no bid decision in the Saudi Arabian construction contractors. Constr Manag Econ 27(1):53–71CrossRef Bageis AS, Fortune C (2009) Factors affecting the bid/no bid decision in the Saudi Arabian construction contractors. Constr Manag Econ 27(1):53–71CrossRef
Zurück zum Zitat Chua DKH, Li D (2000) Key factors in bid reasoning model. J Constr Eng Manag 126(5):349–357CrossRef Chua DKH, Li D (2000) Key factors in bid reasoning model. J Constr Eng Manag 126(5):349–357CrossRef
Zurück zum Zitat Dikmen I, Birgonul MT, Gur AK (2007) A case-based decision support tool for bid mark-up estimation of international construction projects. Autom Constr 17(1):30–44CrossRef Dikmen I, Birgonul MT, Gur AK (2007) A case-based decision support tool for bid mark-up estimation of international construction projects. Autom Constr 17(1):30–44CrossRef
Zurück zum Zitat Egemen M, Mohamed AN (2007) A framework for contractors to reach strategically correct bid/no bid and mark-up size decisions. Build Environ 42(3):1373–1385CrossRef Egemen M, Mohamed AN (2007) A framework for contractors to reach strategically correct bid/no bid and mark-up size decisions. Build Environ 42(3):1373–1385CrossRef
Zurück zum Zitat Maqsoom A, Charoenngam C (2014) Motives and competitive assets of Pakistani international construction contracting firms: impact of size and international experience. J Financ Manag Prop Constr 19(2):138–151CrossRef Maqsoom A, Charoenngam C (2014) Motives and competitive assets of Pakistani international construction contracting firms: impact of size and international experience. J Financ Manag Prop Constr 19(2):138–151CrossRef
Zurück zum Zitat Maqsoom A, Charoenngam C (2015) The international entrepreneurial dynamics of Pakistani transnational contractors. In: Shen L, Ye K, Mao C (eds) Proceedings of the 19th international symposium on advancement of construction management and real estate. Springer, Berlin, Heidelberg Maqsoom A, Charoenngam C (2015) The international entrepreneurial dynamics of Pakistani transnational contractors. In: Shen L, Ye K, Mao C (eds) Proceedings of the 19th international symposium on advancement of construction management and real estate. Springer, Berlin, Heidelberg
Zurück zum Zitat Maqsoom A, Charoenngam C, Masood R, Awais M (2014) Foreign market entry considerations of emerging economy firms: an example of Pakistani contractors. Procedia Eng 77:222–228CrossRef Maqsoom A, Charoenngam C, Masood R, Awais M (2014) Foreign market entry considerations of emerging economy firms: an example of Pakistani contractors. Procedia Eng 77:222–228CrossRef
Zurück zum Zitat Odusote OO, Fellows RF (1992) An examination of the importance of resource considerations when contractors make project selection decisions. Constr Manag Econ 10(2):137–151CrossRef Odusote OO, Fellows RF (1992) An examination of the importance of resource considerations when contractors make project selection decisions. Constr Manag Econ 10(2):137–151CrossRef
Zurück zum Zitat Shash AA, Abdul-Hadi NH (1992) Factors affecting a contractor’s mark-up size decision in Saudi Arabia. Constr Manag Econ 10(5):415–429CrossRef Shash AA, Abdul-Hadi NH (1992) Factors affecting a contractor’s mark-up size decision in Saudi Arabia. Constr Manag Econ 10(5):415–429CrossRef
Zurück zum Zitat Wanous M, Boussabaine AA, Lewis J (2000) To bid or not to bid: a parametric solution. Constr Manag Econ 18(4):457–466CrossRef Wanous M, Boussabaine AA, Lewis J (2000) To bid or not to bid: a parametric solution. Constr Manag Econ 18(4):457–466CrossRef
Metadaten
Titel
Strategic Factors Influencing Bid/No-Bid Decision of Pakistani Contractors
verfasst von
Ahsen Maqsoom
Malik Muhammad Farjad
Muhammad Sadaat Abbas
Muhammad Ehtesham-Ul-Haque
Muhammad Irfan
Aman Ullah Malik
Copyright-Jahr
2018
Verlag
Springer Singapore
DOI
https://doi.org/10.1007/978-981-10-6190-5_118