Strategic Planning of Work and the Use of 4D BIM for Multiple Floor Buildings

verfasst von : Luiz Reynaldo de Azevedo Cardoso, Thalyta de Miranda Lanna Rios, Tiely Zurlo Mognhol, Alberto Vinicius Marostica

Erschienen in: Proceedings of the 18th International Conference on Computing in Civil and Building Engineering

Verlag: Springer International Publishing

Aktivieren Sie unsere intelligente Suche, um passende Fachinhalte oder Patente zu finden.

search-config
loading …

Abstract

The use of 4D BIM has been spreading, with significant scientific production in the area. The advantages of using it are notorious and well documented, highlighting the visualization of the work execution, increasing the comprehension and reliability of the planning. However, the need for 4D BIM support in the correct use of usual planning methods and techniques has been little emphasized and demonstrated in the literature. The study of 4D BIM applications in strategic construction planning has also been poorly documented, with simpler modelling and without the need for significant changes in the usual hiring processes for projects. This article aims to: demonstrate that the use of 4D BIM requires a consistent and reliable planning basis; to propose, based on the context of the Brazilian residential real estate market, a 4D BIM modelling method to support strategic construction planning decisions. In order to meet these objectives, a literature review was made, as well as basic concepts and the presentation of a case study. The case study is the planning of executing a residential complex with three towers of multiple floors, typical of real estate developments in the city of São Paulo. Two plans of attack regarding the execution of the work are simulated and visualized. The results are analysed and discussed based on the literature and conceptual considerations presented. The conclusion was by the feasibility and utility of applying the 4D BIM, considering the adopted assumptions, method and tools used. The main difficulty is the modelling time. This stems not only from the project as a whole, but also from the increase resulting from the modelling of complementary activities, such as wood forms, scaffolding, protection screens, and others. Limitations of the application used were identified. Even so, the expenditure of work is compatible with the final quality of the visualization and the benefits provided to planning and decision making. The method could be used without the need for significant changes in the usual project and planning contracting processes in the real estate market in Brazil. It was confirmed that 4D BIM requires the correct use of the usual planning techniques and tools However, it requires training the planner in 3D modelling and 4D BIM. Recommendations regarding the improvement of the efficiency and quality of modelling are made as well as regarding further studies in the area.

Sie haben noch keine Lizenz? Dann Informieren Sie sich jetzt über unsere Produkte:

Springer Professional "Wirtschaft+Technik"

Online-Abonnement

Mit Springer Professional "Wirtschaft+Technik" erhalten Sie Zugriff auf:

  • über 102.000 Bücher
  • über 537 Zeitschriften

aus folgenden Fachgebieten:

  • Automobil + Motoren
  • Bauwesen + Immobilien
  • Business IT + Informatik
  • Elektrotechnik + Elektronik
  • Energie + Nachhaltigkeit
  • Finance + Banking
  • Management + Führung
  • Marketing + Vertrieb
  • Maschinenbau + Werkstoffe
  • Versicherung + Risiko

Jetzt Wissensvorsprung sichern!

Springer Professional "Technik"

Online-Abonnement

Mit Springer Professional "Technik" erhalten Sie Zugriff auf:

  • über 67.000 Bücher
  • über 390 Zeitschriften

aus folgenden Fachgebieten:

  • Automobil + Motoren
  • Bauwesen + Immobilien
  • Business IT + Informatik
  • Elektrotechnik + Elektronik
  • Energie + Nachhaltigkeit
  • Maschinenbau + Werkstoffe




 

Jetzt Wissensvorsprung sichern!

Springer Professional "Wirtschaft"

Online-Abonnement

Mit Springer Professional "Wirtschaft" erhalten Sie Zugriff auf:

  • über 67.000 Bücher
  • über 340 Zeitschriften

aus folgenden Fachgebieten:

  • Bauwesen + Immobilien
  • Business IT + Informatik
  • Finance + Banking
  • Management + Führung
  • Marketing + Vertrieb
  • Versicherung + Risiko




Jetzt Wissensvorsprung sichern!

Literatur
1.
Zurück zum Zitat Biotto, C.N., Formoso, C.T., Isatto, E.L.: Use of 4D modeling and building information modeling in the management of production systems in construction projects. Ambiente Construído, Porto Alegre 15(2), 79–96 (2015)CrossRef Biotto, C.N., Formoso, C.T., Isatto, E.L.: Use of 4D modeling and building information modeling in the management of production systems in construction projects. Ambiente Construído, Porto Alegre 15(2), 79–96 (2015)CrossRef
2.
Zurück zum Zitat Vargas, F.B., Formoso, C.T.: Method for location-based production planning and control supported by BIM. Ambient. constr, Porto Alegre 20(1) (2020) Vargas, F.B., Formoso, C.T.: Method for location-based production planning and control supported by BIM. Ambient. constr, Porto Alegre 20(1) (2020)
3.
Zurück zum Zitat Brito, D.M., Ferreira, E.A.M.: Evaluation of strategies for representation and analysis of construction planning and control using 4D BIM models. Procedia Econ. Finance 21, 374–382 (2015)CrossRef Brito, D.M., Ferreira, E.A.M.: Evaluation of strategies for representation and analysis of construction planning and control using 4D BIM models. Procedia Econ. Finance 21, 374–382 (2015)CrossRef
4.
Zurück zum Zitat Eastman, C., Teicholz, P., Sacks, R., Liston, K.: Manual de BIM: um guia de modelagem da informação da construção para arquitetos, engenheiros, gerentes, construtores e incorporadores. Porto Alegre, Bookman (2014) Eastman, C., Teicholz, P., Sacks, R., Liston, K.: Manual de BIM: um guia de modelagem da informação da construção para arquitetos, engenheiros, gerentes, construtores e incorporadores. Porto Alegre, Bookman (2014)
5.
Zurück zum Zitat Toledo, E.S.: BIM well done. Structure Magazine, April 2017 Toledo, E.S.: BIM well done. Structure Magazine, April 2017
6.
Zurück zum Zitat Filippi, G.A., Melhado, S.B.: A study on the causes of delays in the construction of real estate projects in the metropolitan region of São Paulo. Ambiente Construído, Porto Alegre 15(3), 61–173 (2015) Filippi, G.A., Melhado, S.B.: A study on the causes of delays in the construction of real estate projects in the metropolitan region of São Paulo. Ambiente Construído, Porto Alegre 15(3), 61–173 (2015)
7.
Zurück zum Zitat Muianga, E.A.D., Granja, A.D., de Andrade Ruiz, J.: Deviations of costs and deadlines in construction projects: categorization and influencing factors. Ambiente Construído, Porto Alegre 15(1), 79–97 (2015) Muianga, E.A.D., Granja, A.D., de Andrade Ruiz, J.: Deviations of costs and deadlines in construction projects: categorization and influencing factors. Ambiente Construído, Porto Alegre 15(1), 79–97 (2015)
8.
Zurück zum Zitat Mattos, A.D.: Why do schedules “stick”? Mundo Project Management (2007) Mattos, A.D.: Why do schedules “stick”? Mundo Project Management (2007)
9.
Zurück zum Zitat Rezende, M.A.P., Barros, M.M.S.B, Abiko, A.K.: Barriers and facilitators of technological innovation in the production of popular housing. In: ENTAC 2002. XIX Encontro Nacional de Tecnologia do Ambiente Construído, Foz do Iguaçu, Anais (2002) Rezende, M.A.P., Barros, M.M.S.B, Abiko, A.K.: Barriers and facilitators of technological innovation in the production of popular housing. In: ENTAC 2002. XIX Encontro Nacional de Tecnologia do Ambiente Construído, Foz do Iguaçu, Anais (2002)
10.
Zurück zum Zitat de Brito Mello, L.C.B., de Amorim, S.R.L.: The civil construction building subsector in Brazil: a comparative analysis in relation to the European Union and the United States. In: Prod, São Paulo, vol. 19 no. 2 (2009) de Brito Mello, L.C.B., de Amorim, S.R.L.: The civil construction building subsector in Brazil: a comparative analysis in relation to the European Union and the United States. In: Prod, São Paulo, vol. 19 no. 2 (2009)
11.
Zurück zum Zitat Tsai, M.H., Wu, C.H., Matin, Md.A., Fan, S.L., Kang, S.C., Hsieh, S.H.: Experiences using building information modeling for a construction project. In: Conference: Proceedings of the International Conference on Computing in Civil and Building Engineering (ICCCBE), Nottingham, UK (2010) Tsai, M.H., Wu, C.H., Matin, Md.A., Fan, S.L., Kang, S.C., Hsieh, S.H.: Experiences using building information modeling for a construction project. In: Conference: Proceedings of the International Conference on Computing in Civil and Building Engineering (ICCCBE), Nottingham, UK (2010)
12.
Zurück zum Zitat Homrich, A.S., et al.: The circular economy umbrella: trends and gaps on integrating pathways. J. Cleaner Prod. 175(20), 525–543 (2018)CrossRef Homrich, A.S., et al.: The circular economy umbrella: trends and gaps on integrating pathways. J. Cleaner Prod. 175(20), 525–543 (2018)CrossRef
13.
Zurück zum Zitat Carvalho, M.M., Fleury, A., Lopes, A.P.: An overview of the literature on technology roadmapping (TRM): contributions and trends. Technol. Forecast. Soc. Change 80, 1418–1437 (2013) Carvalho, M.M., Fleury, A., Lopes, A.P.: An overview of the literature on technology roadmapping (TRM): contributions and trends. Technol. Forecast. Soc. Change 80, 1418–1437 (2013)
14.
Zurück zum Zitat Pishdad-Bozorgi, P., Gao, X.H., Eastman, C., Self, A.P.: Planning and developing facility management-enabled building information model (FM-enabled BIM). Autom. Constr. 87, 22–38 (2018)CrossRef Pishdad-Bozorgi, P., Gao, X.H., Eastman, C., Self, A.P.: Planning and developing facility management-enabled building information model (FM-enabled BIM). Autom. Constr. 87, 22–38 (2018)CrossRef
15.
Zurück zum Zitat Kropp, C., Koch, C., Konig, M.: Interior construction state recognition with 4D BIM registered image sequences. Autom. Constr. 86, 11–32 (2018)CrossRef Kropp, C., Koch, C., Konig, M.: Interior construction state recognition with 4D BIM registered image sequences. Autom. Constr. 86, 11–32 (2018)CrossRef
16.
Zurück zum Zitat Kim, C., Son, H., Kim, C.: Automated construction progress measurement using a 4D building information model and 3D data. Autom. Constr. 31, 75–82 (2013)CrossRef Kim, C., Son, H., Kim, C.: Automated construction progress measurement using a 4D building information model and 3D data. Autom. Constr. 31, 75–82 (2013)CrossRef
17.
Zurück zum Zitat Sacks, R., Radosavljevic, M., Barak, R.: Requirements for building information modeling based lean production management systems for construction. Autom. Constr. 19(5), 641–655 (2010)CrossRef Sacks, R., Radosavljevic, M., Barak, R.: Requirements for building information modeling based lean production management systems for construction. Autom. Constr. 19(5), 641–655 (2010)CrossRef
18.
Zurück zum Zitat Golparvar-Fard, M., Pena-Mora, F., Savarese, S.: Automated progress monitoring using unordered daily construction photographs and IFC-based building information models. J. Comput. Civil Eng. 29(1), 04014025 (2015)CrossRef Golparvar-Fard, M., Pena-Mora, F., Savarese, S.: Automated progress monitoring using unordered daily construction photographs and IFC-based building information models. J. Comput. Civil Eng. 29(1), 04014025 (2015)CrossRef
19.
Zurück zum Zitat Golparvar-Fard, M., Peña-Mora, F., Savarese, S.: Integrated sequential as-built and as-planned representation with D 4AR tools in support of decision-making tasks in the AEC/FM industry. J. Constr. Eng. Manag. 137(12), 1099–1116 (2011)CrossRef Golparvar-Fard, M., Peña-Mora, F., Savarese, S.: Integrated sequential as-built and as-planned representation with D 4AR tools in support of decision-making tasks in the AEC/FM industry. J. Constr. Eng. Manag. 137(12), 1099–1116 (2011)CrossRef
20.
Zurück zum Zitat Son, H., Kim, C., Kwon Cho, Y.: Automated schedule updates using as-built data and a 4D building information model. J. Manag. Eng. 33(4), 04017012 (2017)CrossRef Son, H., Kim, C., Kwon Cho, Y.: Automated schedule updates using as-built data and a 4D building information model. J. Manag. Eng. 33(4), 04017012 (2017)CrossRef
21.
Zurück zum Zitat Wang, W.C., Weng, S.W., Wang, S.H., Chen, C.Y.: Integrating building information models with construction process simulations for project scheduling support. Autom. Constr. 37, 68–80 (2014)CrossRef Wang, W.C., Weng, S.W., Wang, S.H., Chen, C.Y.: Integrating building information models with construction process simulations for project scheduling support. Autom. Constr. 37, 68–80 (2014)CrossRef
22.
Zurück zum Zitat Faghihi, V., Reinschmidt, K.F., Kang, J.H.: Construction scheduling using genetic algorithm based on building information model. Expert Syst. Appl. 41(16), 7565–7578 (2015)CrossRef Faghihi, V., Reinschmidt, K.F., Kang, J.H.: Construction scheduling using genetic algorithm based on building information model. Expert Syst. Appl. 41(16), 7565–7578 (2015)CrossRef
23.
Zurück zum Zitat Rebolj, D., Pučko, Z., Babič, N.Č., Bizjak, M., Mongus, D.: Point cloud quality requirements for Scan-vs-BIM based automated construction progress monitoring. Automation in Construction 84, 323–334 (2017)CrossRef Rebolj, D., Pučko, Z., Babič, N.Č., Bizjak, M., Mongus, D.: Point cloud quality requirements for Scan-vs-BIM based automated construction progress monitoring. Automation in Construction 84, 323–334 (2017)CrossRef
24.
Zurück zum Zitat Liu, H.X., Singh, G., Lu, M., Bouferguene, A., Al-Hussein, M.: BIM-based automated design and planning for boarding of light-frame residential buildings. Autom. Constr. 89, 235–249 (2018)CrossRef Liu, H.X., Singh, G., Lu, M., Bouferguene, A., Al-Hussein, M.: BIM-based automated design and planning for boarding of light-frame residential buildings. Autom. Constr. 89, 235–249 (2018)CrossRef
25.
Zurück zum Zitat Sigalov, K., Konig, M.: Recognition of process patterns for BIM-based construction schedules. Adv. Eng. Inform. 33, 456–472 (2017)CrossRef Sigalov, K., Konig, M.: Recognition of process patterns for BIM-based construction schedules. Adv. Eng. Inform. 33, 456–472 (2017)CrossRef
26.
Zurück zum Zitat Schwabe, K., Teizer, J., Konig, M.: Applying rule-based model-checking to construction site layout planning tasks. Autom. Constr. 97, 205–219 (2019)CrossRef Schwabe, K., Teizer, J., Konig, M.: Applying rule-based model-checking to construction site layout planning tasks. Autom. Constr. 97, 205–219 (2019)CrossRef
27.
Zurück zum Zitat Bortolini, R., Formoso, C.T., Viana, D.D.: Site logistics planning and control for engineer-to-order prefabricated building systems using BIM 4D modeling. Autom. Constr. 98(2019), 248–264 (2015/2019) Bortolini, R., Formoso, C.T., Viana, D.D.: Site logistics planning and control for engineer-to-order prefabricated building systems using BIM 4D modeling. Autom. Constr. 98(2019), 248–264 (2015/2019)
28.
Zurück zum Zitat Choi, B., Lee, H.S., Park, M., Cho, Y.K., Kim, H.: Framework for work-space planning using four-dimensional BIM in construction projects. J. Constr. Eng. Manag. 140(9), 04014041 (2014)CrossRef Choi, B., Lee, H.S., Park, M., Cho, Y.K., Kim, H.: Framework for work-space planning using four-dimensional BIM in construction projects. J. Constr. Eng. Manag. 140(9), 04014041 (2014)CrossRef
29.
Zurück zum Zitat Manenti, E.M., Marchiori, F.F., Correa, L.A.: BIM execution plan: proposal of guidelines for contractors and designers Ambiente. constr. (conectados) 20(1), 65–85 (2020) Manenti, E.M., Marchiori, F.F., Correa, L.A.: BIM execution plan: proposal of guidelines for contractors and designers Ambiente. constr. (conectados) 20(1), 65–85 (2020)
30.
Zurück zum Zitat Rodrigues, P.B.F., Machado, R.L., Mendes, J.R., Romagnoli, L.D.S.C.: A proposal to integrate the BIM model with the last planner system. Ambient. constr. Porto Alegre 18(4) (2018) Rodrigues, P.B.F., Machado, R.L., Mendes, J.R., Romagnoli, L.D.S.C.: A proposal to integrate the BIM model with the last planner system. Ambient. constr. Porto Alegre 18(4) (2018)
31.
Zurück zum Zitat Bataglin, F.S., Viana, D.D., Formoso, C.T., Bulhões, I.R.: 4D BIM applied to logistics management: implementation in the assembly of Engineer-to-order prefabricated concrete systems. Ambiente. constr. (conectados) 18(1), 173–192 (2018) Bataglin, F.S., Viana, D.D., Formoso, C.T., Bulhões, I.R.: 4D BIM applied to logistics management: implementation in the assembly of Engineer-to-order prefabricated concrete systems. Ambiente. constr. (conectados) 18(1), 173–192 (2018)
32.
Zurück zum Zitat Ahuja, H.A., Dozzi, S.P., Abourizk, S.M.: Project Management: Techniques in Planning and Controlling Construction Projects, 2nd edn. Wiley, Hoboken (1994) Ahuja, H.A., Dozzi, S.P., Abourizk, S.M.: Project Management: Techniques in Planning and Controlling Construction Projects, 2nd edn. Wiley, Hoboken (1994)
33.
Zurück zum Zitat Limmer, C.V.: Planejamento, orçamentação e controle de obras. Livros Técnicos e Científicos Editora, Rio de Janeiro (1996) Limmer, C.V.: Planejamento, orçamentação e controle de obras. Livros Técnicos e Científicos Editora, Rio de Janeiro (1996)
34.
Zurück zum Zitat Kerzner, H.: A systems approach to planning, scheduling, and controlling, 10th edn. Wiley, Hoboken (2009) Kerzner, H.: A systems approach to planning, scheduling, and controlling, 10th edn. Wiley, Hoboken (2009)
35.
Zurück zum Zitat Slack, N., Chambers, S., Harland, C., Harrison, A., Johnston, R.: Production Management. Atlas, São Paulo (1996) Slack, N., Chambers, S., Harland, C., Harrison, A., Johnston, R.: Production Management. Atlas, São Paulo (1996)
36.
Zurück zum Zitat Halpin, D.W., Riggs, L.S.: Planning and Analysis of Construction Operations. Willey, New York (1992) Halpin, D.W., Riggs, L.S.: Planning and Analysis of Construction Operations. Willey, New York (1992)
37.
Zurück zum Zitat Assumpção, J.F.P.: Project management in civil construction: model for strategic planning of building production. Doctorate thesis. Polytechnic School, University of São Paulo (1996) Assumpção, J.F.P.: Project management in civil construction: model for strategic planning of building production. Doctorate thesis. Polytechnic School, University of São Paulo (1996)
38.
Zurück zum Zitat Mattos, A.D.: Construction Planning and Control. PINI, São Paulo (2010) Mattos, A.D.: Construction Planning and Control. PINI, São Paulo (2010)
39.
Zurück zum Zitat Mattos, A.D.: Os 50 anos do PERT/CPM. Mundo Project Management, Ano 5, no. 25 (2009) Mattos, A.D.: Os 50 anos do PERT/CPM. Mundo Project Management, Ano 5, no. 25 (2009)
40.
Zurück zum Zitat Romanello, A.P., Pelege, G.S., Silva, I.M.B., Ferreira, L.R.: BIM modeling in physical planning of works. Conclusion of Civil Engineering Course. Mauá Engineering School of the University Center of the Mauá de Tecnologia Institute. Sao Caetano do Sul (2019) Romanello, A.P., Pelege, G.S., Silva, I.M.B., Ferreira, L.R.: BIM modeling in physical planning of works. Conclusion of Civil Engineering Course. Mauá Engineering School of the University Center of the Mauá de Tecnologia Institute. Sao Caetano do Sul (2019)
Metadaten
Titel
Strategic Planning of Work and the Use of 4D BIM for Multiple Floor Buildings
verfasst von
Luiz Reynaldo de Azevedo Cardoso
Thalyta de Miranda Lanna Rios
Tiely Zurlo Mognhol
Alberto Vinicius Marostica
Copyright-Jahr
2021
DOI
https://doi.org/10.1007/978-3-030-51295-8_42