Skip to main content

2022 | OriginalPaper | Buchkapitel

The Integration of Automatic BIM Validation and Smart Contracts for Design Compliance and Payment Reliability in the Design Process

verfasst von : Giulia Pattini, Giuseppe Martino Di Giuda, Lavinia Chiara Tagliabue

Erschienen in: Blockchain for Construction

Verlag: Springer Nature Singapore

Aktivieren Sie unsere intelligente Suche, um passende Fachinhalte oder Patente zu finden.

search-config
loading …

Abstract

The research aims at streamlining the execution of the design phase by combining the automatic BIM validation and smart contracts. The construction industry is generally reluctant in accommodating new technologies, but with the promise of transforming information management, Building Information Modelling (BIM) is currently leading its digitalisation. Despite that, its adoption showed issues of information integrity and reliability. Misunderstanding about information requirements can cause delays, unforeseen costs and need for reworks. For these reasons, the chapter suggests the integration of information management based on BIM and blockchain, highlighting their prospective bond. The chapter illustrates the framework of the research that applies the automatic BIM validation and smart contracts in the design phase, pointing out their potential impact on the automation of information review, reduction of late deliveries and overdue payments. The architecture of the potential technological tools is presented and discussed. The research proposes a data-driven process, where all the essential information related to the design verification is recorded and where, at the automatic validation of each BIM model, the approval of payment release is issued automatically. The system intends to ensure full compliance with project information requirements and protect the contracting parties against potential late payment. The framework is still theoretical, however, the expected outcomes from its future test through a proof of concept are finally discussed.

Sie haben noch keine Lizenz? Dann Informieren Sie sich jetzt über unsere Produkte:

Springer Professional "Wirtschaft+Technik"

Online-Abonnement

Mit Springer Professional "Wirtschaft+Technik" erhalten Sie Zugriff auf:

  • über 102.000 Bücher
  • über 537 Zeitschriften

aus folgenden Fachgebieten:

  • Automobil + Motoren
  • Bauwesen + Immobilien
  • Business IT + Informatik
  • Elektrotechnik + Elektronik
  • Energie + Nachhaltigkeit
  • Finance + Banking
  • Management + Führung
  • Marketing + Vertrieb
  • Maschinenbau + Werkstoffe
  • Versicherung + Risiko

Jetzt Wissensvorsprung sichern!

Springer Professional "Technik"

Online-Abonnement

Mit Springer Professional "Technik" erhalten Sie Zugriff auf:

  • über 67.000 Bücher
  • über 390 Zeitschriften

aus folgenden Fachgebieten:

  • Automobil + Motoren
  • Bauwesen + Immobilien
  • Business IT + Informatik
  • Elektrotechnik + Elektronik
  • Energie + Nachhaltigkeit
  • Maschinenbau + Werkstoffe




 

Jetzt Wissensvorsprung sichern!

Springer Professional "Wirtschaft"

Online-Abonnement

Mit Springer Professional "Wirtschaft" erhalten Sie Zugriff auf:

  • über 67.000 Bücher
  • über 340 Zeitschriften

aus folgenden Fachgebieten:

  • Bauwesen + Immobilien
  • Business IT + Informatik
  • Finance + Banking
  • Management + Führung
  • Marketing + Vertrieb
  • Versicherung + Risiko




Jetzt Wissensvorsprung sichern!

Literatur
1.
Zurück zum Zitat European Construction Sector Observatory (2018) Country profile Italy, p 27 European Construction Sector Observatory (2018) Country profile Italy, p 27
2.
Zurück zum Zitat European Construction Sector Observatory (2019) Building information modelling in the EU construction sector, pp 1–22 European Construction Sector Observatory (2019) Building information modelling in the EU construction sector, pp 1–22
3.
Zurück zum Zitat Li J, Greenwood D, Kassem M (2019) Blockchain in the built environment and construction industry: A systematic review, conceptual models and practical use cases. Autom Constr 102(January):288–307CrossRef Li J, Greenwood D, Kassem M (2019) Blockchain in the built environment and construction industry: A systematic review, conceptual models and practical use cases. Autom Constr 102(January):288–307CrossRef
4.
Zurück zum Zitat Antwi-Afari MF, Li H, Pärn EA, Edwards DJ (2018) Critical success factors for implementing building information modelling (BIM): A longitudinal review. Autom Constr 91(November 2017):100–110 Antwi-Afari MF, Li H, Pärn EA, Edwards DJ (2018) Critical success factors for implementing building information modelling (BIM): A longitudinal review. Autom Constr 91(November 2017):100–110
5.
Zurück zum Zitat Nawari NO, Ravindran S. (2019) Blockchain and the built environment: Potentials and limitations. J Build Eng 25(June) Nawari NO, Ravindran S. (2019) Blockchain and the built environment: Potentials and limitations. J Build Eng 25(June)
6.
Zurück zum Zitat Tezel A, Papadonikolaki E, Yitmen I (2019) Preparing construction supply chains for blockchain: An exploratory analysis. CIB World Build Congr (June):17–21 Tezel A, Papadonikolaki E, Yitmen I (2019) Preparing construction supply chains for blockchain: An exploratory analysis. CIB World Build Congr (June):17–21
7.
Zurück zum Zitat Scott DJ, Broyd T, Ma L (2021) Exploratory literature review of blockchain in the construction industry. Autom Constr 132(July):103914 Scott DJ, Broyd T, Ma L (2021) Exploratory literature review of blockchain in the construction industry. Autom Constr 132(July):103914
8.
Zurück zum Zitat Hunhevicz JJ, Hall DM (2019) Managing mistrust in construction using DLT: a review of use-case categories for technical decisions. In: Proceeding of the 2019 European conference on computing in construction, vol. 1, pp 100–109 Hunhevicz JJ, Hall DM (2019) Managing mistrust in construction using DLT: a review of use-case categories for technical decisions. In: Proceeding of the 2019 European conference on computing in construction, vol. 1, pp 100–109
9.
Zurück zum Zitat Dakhli Z, Lafhaj Z, Mossman A (2019) The potential of blockchain in building construction. Buildings Dakhli Z, Lafhaj Z, Mossman A (2019) The potential of blockchain in building construction. Buildings
10.
Zurück zum Zitat Wu L (2018) Blockchain-based smart contract for smart payment in construction: A focus on the payment freezing and disbursement cycle, pp 4–6 Wu L (2018) Blockchain-based smart contract for smart payment in construction: A focus on the payment freezing and disbursement cycle, pp 4–6
11.
Zurück zum Zitat Maciel A (2019) CBC symposium 2019 no(June) Maciel A (2019) CBC symposium 2019 no(June)
12.
Zurück zum Zitat Dounas T, Lombardi D, Jabi W (2020) Framework for decentralised architectural design BIM and Blockchain integration. Int J Archit Comput Dounas T, Lombardi D, Jabi W (2020) Framework for decentralised architectural design BIM and Blockchain integration. Int J Archit Comput
13.
Zurück zum Zitat Mathews M, Robles D, Bowe B (2017) BIM+blockchain: A solution to the trust problem in collaboration? CITA BIM Gather 2017:11 Mathews M, Robles D, Bowe B (2017) BIM+blockchain: A solution to the trust problem in collaboration? CITA BIM Gather 2017:11
14.
Zurück zum Zitat Rodrigues B, Bocek T, Stiller B (2018) The use of blockchains: Application-driven analysis of applicability, 1st ed, vol. 111. Elsevier Inc. Rodrigues B, Bocek T, Stiller B (2018) The use of blockchains: Application-driven analysis of applicability, 1st ed, vol. 111. Elsevier Inc.
15.
Zurück zum Zitat Agenzia per la Coesione Territoriale (2018) Rapporto sui tempi di attuazione delle opere pubbliche. Temi CTP 6:1–43 Agenzia per la Coesione Territoriale (2018) Rapporto sui tempi di attuazione delle opere pubbliche. Temi CTP 6:1–43
16.
Zurück zum Zitat European Construction Sector Observatory (2020) Late payment in the construction sector, pp 1–64 European Construction Sector Observatory (2020) Late payment in the construction sector, pp 1–64
17.
Zurück zum Zitat Windaus D, Tebbett S, Rosier H, Rafuse J, Vettoretti R, Greaves P (2019) Working capital report 2019/20: Creating value through working capital Windaus D, Tebbett S, Rosier H, Rafuse J, Vettoretti R, Greaves P (2019) Working capital report 2019/20: Creating value through working capital
18.
Zurück zum Zitat NBS (2019) National BIM report 2019, pp 1–28 NBS (2019) National BIM report 2019, pp 1–28
19.
Zurück zum Zitat European Construction Sector Observatory (2019) Country profile Italy European Construction Sector Observatory (2019) Country profile Italy
20.
Zurück zum Zitat UK BIM Alliance (2020) Information management according to BS EN ISO 19650—Guidance Part 1: concepts 3:42 UK BIM Alliance (2020) Information management according to BS EN ISO 19650—Guidance Part 1: concepts 3:42
21.
Zurück zum Zitat Oraee M, Hosseini MR, Edwards DJ, Li H, Papadonikolaki E, Cao D (2019) Collaboration barriers in BIM-based construction networks: a conceptual model. Int J Proj Manag 37(6):839–854CrossRef Oraee M, Hosseini MR, Edwards DJ, Li H, Papadonikolaki E, Cao D (2019) Collaboration barriers in BIM-based construction networks: a conceptual model. Int J Proj Manag 37(6):839–854CrossRef
22.
Zurück zum Zitat BSI Standards Publication (2018) ISO 19650–1:2018, pp 1–46 BSI Standards Publication (2018) ISO 19650–1:2018, pp 1–46
23.
Zurück zum Zitat Baldauf JP, Formoso CT, Tzortzopoulos P, Miron LIG, Soliman J (2020) Using building information modelling to manage client requirements in social housing projects. Sustainability 12(7):1–21CrossRef Baldauf JP, Formoso CT, Tzortzopoulos P, Miron LIG, Soliman J (2020) Using building information modelling to manage client requirements in social housing projects. Sustainability 12(7):1–21CrossRef
24.
Zurück zum Zitat BSI Standards Publication (2012) PD ISO/TS 12911: Framework for building information modelling (BIM) guidance BSI Standards Publication (2012) PD ISO/TS 12911: Framework for building information modelling (BIM) guidance
25.
Zurück zum Zitat Kensek K (2015) BIM guidelines inform facilities management databases: A case study over time. Buildings 5(3):899–916CrossRef Kensek K (2015) BIM guidelines inform facilities management databases: A case study over time. Buildings 5(3):899–916CrossRef
26.
Zurück zum Zitat Sacks R, Gurevich U, Shrestha P (2016) A review of building information modeling protocols, guides and standards for large construction clients. J Inf Technol Constr 21:479–503 Sacks R, Gurevich U, Shrestha P (2016) A review of building information modeling protocols, guides and standards for large construction clients. J Inf Technol Constr 21:479–503
27.
Zurück zum Zitat Yli-Huumo J, Ko D, Choi S, Park S, Smolander K (2016) Where is current research on blockchain technology?—A systematic review. PLoS One Yli-Huumo J, Ko D, Choi S, Park S, Smolander K (2016) Where is current research on blockchain technology?—A systematic review. PLoS One
28.
Zurück zum Zitat Tapscott D, Tapscott A (2017) Realizing the potential of blockchain a multistakeholder approach to the stewardship of blockchain and cryptocurrencies. Whitepaper (June), 46 Tapscott D, Tapscott A (2017) Realizing the potential of blockchain a multistakeholder approach to the stewardship of blockchain and cryptocurrencies. Whitepaper (June), 46
29.
Zurück zum Zitat Foschini L, Gavagna A, Martuscelli G, Montanari R (2020) Hyperledger fabric blockchain: Chaincode performance analysis. In: IEEE international conference on communications, 2020 Foschini L, Gavagna A, Martuscelli G, Montanari R (2020) Hyperledger fabric blockchain: Chaincode performance analysis. In: IEEE international conference on communications, 2020
30.
Zurück zum Zitat Tapscott D, Tapscott A (2016) Blockchain revolution—How the technology behind Bitcoin and other cryptocurrencies is changing the world. Portfolio/Penguin Tapscott D, Tapscott A (2016) Blockchain revolution—How the technology behind Bitcoin and other cryptocurrencies is changing the world. Portfolio/Penguin
31.
Zurück zum Zitat Wust K, Gervais A (2018) Do you need a blockchain?. In: Proceeding of the 2018 crypto valley conference blockchain technolonogy CVCBT 2018, no. i, pp 45–54 Wust K, Gervais A (2018) Do you need a blockchain?. In: Proceeding of the 2018 crypto valley conference blockchain technolonogy CVCBT 2018, no. i, pp 45–54
32.
Zurück zum Zitat Cardeira H (2015) Smart contracts and possible applications to the construction industry. In: New perspectives in construction law conference held Bucharest, 2015 Cardeira H (2015) Smart contracts and possible applications to the construction industry. In: New perspectives in construction law conference held Bucharest, 2015
33.
Zurück zum Zitat Das M, Luo H, Cheng JCP (2020) Securing interim payments in construction projects through a blockchain-based framework. Autom Constr 118 Das M, Luo H, Cheng JCP (2020) Securing interim payments in construction projects through a blockchain-based framework. Autom Constr 118
34.
Zurück zum Zitat Ahmadisheykhsarmast S, Sonmez R (2020) A smart contract system for security of payment of construction contracts. Autom Constr 120 Ahmadisheykhsarmast S, Sonmez R (2020) A smart contract system for security of payment of construction contracts. Autom Constr 120
35.
Zurück zum Zitat Caldarelli G (2020) Understanding the blockchain oracle problem: a call for action. Inf 11(11):1–19 Caldarelli G (2020) Understanding the blockchain oracle problem: a call for action. Inf 11(11):1–19
36.
Zurück zum Zitat Schaad A, Reski T, Winzenried O (2019) Integration of a secure physical element as a trusted oracle in a hyperledger blockchain. In: ICETE 2019—proceeding of the 16th international. joint conference e-business and telecommunications, vol. 2, no. January, pp 498–503 Schaad A, Reski T, Winzenried O (2019) Integration of a secure physical element as a trusted oracle in a hyperledger blockchain. In: ICETE 2019—proceeding of the 16th international. joint conference e-business and telecommunications, vol. 2, no. January, pp 498–503
37.
Zurück zum Zitat Schönhals A, Hepp T, Gipp B (2018) Design thinking using the blockchain. In: Proceeding of the—1st work on cryblock, pp 105–110 Schönhals A, Hepp T, Gipp B (2018) Design thinking using the blockchain. In: Proceeding of the—1st work on cryblock, pp 105–110
38.
Zurück zum Zitat Zheng R, Jiang J, Hao X, Ren W, Xiong F, Ren Y (2019) BcBIM: a blockchain-based big data model for bim modification audit and provenance in mobile cloud. Math Probl Eng 2019 Zheng R, Jiang J, Hao X, Ren W, Xiong F, Ren Y (2019) BcBIM: a blockchain-based big data model for bim modification audit and provenance in mobile cloud. Math Probl Eng 2019
39.
Zurück zum Zitat Polge J, Robert J, Le Traon Y (2020) Permissioned blockchain frameworks in the industry: a comparison. ICT Express Polge J, Robert J, Le Traon Y (2020) Permissioned blockchain frameworks in the industry: a comparison. ICT Express
40.
Zurück zum Zitat Nanayakkara S, Rodrigo MNN, Perera S, Weerasuriya GT, Hijazi AA (2021) A methodology for selection of a Blockchain platform to develop an enterprise system. J Ind Inf Integr 23 Nanayakkara S, Rodrigo MNN, Perera S, Weerasuriya GT, Hijazi AA (2021) A methodology for selection of a Blockchain platform to develop an enterprise system. J Ind Inf Integr 23
41.
Zurück zum Zitat Javaid H, Hu C, Brebner G (2019) Optimizing validation phase of hyperledger fabric. In: Proceeding of the IEEE international symposium on MASCOTS, pp 269–275 Javaid H, Hu C, Brebner G (2019) Optimizing validation phase of hyperledger fabric. In: Proceeding of the IEEE international symposium on MASCOTS, pp 269–275
42.
Zurück zum Zitat Yang L, Dong X, Tong W, Ma S, Qiao H, Xing S (2020) Secure off-chain payment in consortium blockchain system. In: Proceeding of the 2020 international NaNA 2020, pp 259–264 Yang L, Dong X, Tong W, Ma S, Qiao H, Xing S (2020) Secure off-chain payment in consortium blockchain system. In: Proceeding of the 2020 international NaNA 2020, pp 259–264
Metadaten
Titel
The Integration of Automatic BIM Validation and Smart Contracts for Design Compliance and Payment Reliability in the Design Process
verfasst von
Giulia Pattini
Giuseppe Martino Di Giuda
Lavinia Chiara Tagliabue
Copyright-Jahr
2022
Verlag
Springer Nature Singapore
DOI
https://doi.org/10.1007/978-981-19-3759-0_4