9. The Westerschelde Tunnel Project

verfasst von : Mario Vanhoucke

Erschienen in: Project Management with Dynamic Scheduling

Verlag: Springer Berlin Heidelberg

Aktivieren Sie unsere intelligente Suche, um passende Fachinhalte oder Patente zu finden.

search-config
loading …

Abstract

This chapter presents a real-life project example where the minimization of a bottleneck resource’s idle time is the scheduling objective. The project is an illustration of a project scheduling problem with a work continuity scheduling objective as discussed in Sect. 8.​2.​1.​ The chapter illustrates that the use of dedicated scheduling algorithms can lead to improvements in the cost outline of the schedule. Various parts of this chapter have been published in Vanhoucke (2006b, 2007).

Sie haben noch keine Lizenz? Dann Informieren Sie sich jetzt über unsere Produkte:

Springer Professional "Wirtschaft+Technik"

Online-Abonnement

Mit Springer Professional "Wirtschaft+Technik" erhalten Sie Zugriff auf:

  • über 102.000 Bücher
  • über 537 Zeitschriften

aus folgenden Fachgebieten:

  • Automobil + Motoren
  • Bauwesen + Immobilien
  • Business IT + Informatik
  • Elektrotechnik + Elektronik
  • Energie + Nachhaltigkeit
  • Finance + Banking
  • Management + Führung
  • Marketing + Vertrieb
  • Maschinenbau + Werkstoffe
  • Versicherung + Risiko

Jetzt Wissensvorsprung sichern!

Springer Professional "Wirtschaft"

Online-Abonnement

Mit Springer Professional "Wirtschaft" erhalten Sie Zugriff auf:

  • über 67.000 Bücher
  • über 340 Zeitschriften

aus folgenden Fachgebieten:

  • Bauwesen + Immobilien
  • Business IT + Informatik
  • Finance + Banking
  • Management + Führung
  • Marketing + Vertrieb
  • Versicherung + Risiko




Jetzt Wissensvorsprung sichern!

Literatur
Zurück zum Zitat Amor J, Teplitz C (1998) An efficient approximation procedure for project composite learning curves. Proj Manag J 29:28–42 Amor J, Teplitz C (1998) An efficient approximation procedure for project composite learning curves. Proj Manag J 29:28–42
Zurück zum Zitat Amor J (2002) Scheduling programs with repetitive projects using composite learning curve approximations. Proj Manage J 33:16–29 Amor J (2002) Scheduling programs with repetitive projects using composite learning curve approximations. Proj Manage J 33:16–29
Zurück zum Zitat Amor J, Teplitz C (1993) Improving CPM’s accuracy using learning curves. Proj Manage J 24:15–19 Amor J, Teplitz C (1993) Improving CPM’s accuracy using learning curves. Proj Manage J 24:15–19
Zurück zum Zitat Badiru A (1995) Incorporating learning curve effects into critical resource diagramming. Proj Manage J 2:38–45 Badiru A (1995) Incorporating learning curve effects into critical resource diagramming. Proj Manage J 2:38–45
Zurück zum Zitat El-Rayes K, Moselhi O (1998) Resource-driven scheduling of repetitive activities. Constr Manage Econ 16:433–446CrossRef El-Rayes K, Moselhi O (1998) Resource-driven scheduling of repetitive activities. Constr Manage Econ 16:433–446CrossRef
Zurück zum Zitat Kang L, Park IC, Lee BH (2001) Optimal schedule planning for multiple, repetitive construction process. J Constr Eng Manag 127:382–390CrossRef Kang L, Park IC, Lee BH (2001) Optimal schedule planning for multiple, repetitive construction process. J Constr Eng Manag 127:382–390CrossRef
Zurück zum Zitat Moselhi O, El-Rayes K (1993) Scheduling of repetitive projects with cost optimization. J Constr Eng Manage 119:681–697CrossRef Moselhi O, El-Rayes K (1993) Scheduling of repetitive projects with cost optimization. J Constr Eng Manage 119:681–697CrossRef
Zurück zum Zitat Shtub, A. (1991). Shtub A (1991) Scheduling of programs with repetitive projects. Proj Manage J 22:49–53 Shtub, A. (1991). Shtub A (1991) Scheduling of programs with repetitive projects. Proj Manage J 22:49–53
Zurück zum Zitat Shtub A, LeBlanc L, Cai Z (1996) Scheduling programs with repetitive projects: a comparison of a simulated annealing, a genetic and a pair-wise swap algorithm. Eur J Oper Res 88:124–138CrossRef Shtub A, LeBlanc L, Cai Z (1996) Scheduling programs with repetitive projects: a comparison of a simulated annealing, a genetic and a pair-wise swap algorithm. Eur J Oper Res 88:124–138CrossRef
Zurück zum Zitat Vanhoucke M (2006b) Work continuity constraints in project scheduling. J Constr Eng Manag 132:14–25CrossRef Vanhoucke M (2006b) Work continuity constraints in project scheduling. J Constr Eng Manag 132:14–25CrossRef
Metadaten
Titel
The Westerschelde Tunnel Project
verfasst von
Mario Vanhoucke
Copyright-Jahr
2013
Verlag
Springer Berlin Heidelberg
DOI
https://doi.org/10.1007/978-3-642-40438-2_9