Skip to main content
Erschienen in: Soft Computing 12/2017

24.05.2016 | Foundations

Two new meta-heuristics for no-wait flexible flow shop scheduling problem with capacitated machines, mixed make-to-order and make-to-stock policy

verfasst von: Sana Abdollahpour, Javad Rezaian

Erschienen in: Soft Computing | Ausgabe 12/2017

Einloggen

Aktivieren Sie unsere intelligente Suche, um passende Fachinhalte oder Patente zu finden.

search-config
loading …

Abstract

This paper focuses on solving no-wait flexible flow shop scheduling problem with capacitated machines and mixed make-to-order and make-to-stock production management policy restrictions. The considered objective function is minimization of the sum of tardiness cost, weighted earliness cost, weighted rejection cost and weighted incomplete cost. Considering the literature, this problem is known as NP-hard. Hence, the cloudy-based simulated annealing (CSA) and artificial immune system are developed to solve the considered problem. Due to the fact that the parameters may influence the meta-heuristic algorithms, the parameters tuning is performed by Taguchi method. Finally, the performances of algorithms are evaluated by solving the randomly generated problems. Computational experiments show that the CSA algorithm obtains higher-quality solutions than another one.

Sie haben noch keine Lizenz? Dann Informieren Sie sich jetzt über unsere Produkte:

Springer Professional "Wirtschaft+Technik"

Online-Abonnement

Mit Springer Professional "Wirtschaft+Technik" erhalten Sie Zugriff auf:

  • über 102.000 Bücher
  • über 537 Zeitschriften

aus folgenden Fachgebieten:

  • Automobil + Motoren
  • Bauwesen + Immobilien
  • Business IT + Informatik
  • Elektrotechnik + Elektronik
  • Energie + Nachhaltigkeit
  • Finance + Banking
  • Management + Führung
  • Marketing + Vertrieb
  • Maschinenbau + Werkstoffe
  • Versicherung + Risiko

Jetzt Wissensvorsprung sichern!

Springer Professional "Wirtschaft"

Online-Abonnement

Mit Springer Professional "Wirtschaft" erhalten Sie Zugriff auf:

  • über 67.000 Bücher
  • über 340 Zeitschriften

aus folgenden Fachgebieten:

  • Bauwesen + Immobilien
  • Business IT + Informatik
  • Finance + Banking
  • Management + Führung
  • Marketing + Vertrieb
  • Versicherung + Risiko




Jetzt Wissensvorsprung sichern!

Springer Professional "Technik"

Online-Abonnement

Mit Springer Professional "Technik" erhalten Sie Zugriff auf:

  • über 67.000 Bücher
  • über 390 Zeitschriften

aus folgenden Fachgebieten:

  • Automobil + Motoren
  • Bauwesen + Immobilien
  • Business IT + Informatik
  • Elektrotechnik + Elektronik
  • Energie + Nachhaltigkeit
  • Maschinenbau + Werkstoffe




 

Jetzt Wissensvorsprung sichern!

Literatur
Zurück zum Zitat Arabameri S, Salmasi N (2013) Minimization of weighted earliness and tardiness for no-wait sequence-dependent setup times flowshop scheduling problem. Comput Ind Eng 64:902–916CrossRef Arabameri S, Salmasi N (2013) Minimization of weighted earliness and tardiness for no-wait sequence-dependent setup times flowshop scheduling problem. Comput Ind Eng 64:902–916CrossRef
Zurück zum Zitat Ch YK, Lee ZJ, Lu CC, Lin SW (2012) Metaheuristics for scheduling a no-wait flowshop manufacturing cell with sequence-dependent family setups. Int J Adv Manuf Technol 58:671–682. doi:10.1007/s00170-011-3419-y CrossRef Ch YK, Lee ZJ, Lu CC, Lin SW (2012) Metaheuristics for scheduling a no-wait flowshop manufacturing cell with sequence-dependent family setups. Int J Adv Manuf Technol 58:671–682. doi:10.​1007/​s00170-011-3419-y CrossRef
Zurück zum Zitat Cheng T, Li Z, Deng M, Xu Z (2005) Representing indeterminate spatial objects by cloud theory. In: Proceedings of the 4th international symposium on spatial data quality, pp 70–77 Cheng T, Li Z, Deng M, Xu Z (2005) Representing indeterminate spatial objects by cloud theory. In: Proceedings of the 4th international symposium on spatial data quality, pp 70–77
Zurück zum Zitat Cheng T, Zhilin L, Deren L, Deyi L (2006) An integrated cloud model for measurement errors and fuzziness. In: Proceedings of the 12th international symposium on spatial data handling, pp 699–718 Cheng T, Zhilin L, Deren L, Deyi L (2006) An integrated cloud model for measurement errors and fuzziness. In: Proceedings of the 12th international symposium on spatial data handling, pp 699–718
Zurück zum Zitat Coello Coello CA, Cruz Cort’es N (2005) Solving multi objective optimization problems using an artificial immune system. Genet Program Evol Mach 6:163–190CrossRef Coello Coello CA, Cruz Cort’es N (2005) Solving multi objective optimization problems using an artificial immune system. Genet Program Evol Mach 6:163–190CrossRef
Zurück zum Zitat Davendra D, Zelinka I, Bialic-Davendra M, Senkerik R, Jasek R (2013) Discrete self-organising migrating algorithm for flow-shop scheduling with no-wait makespan. Math Comput Model 57:100–110MathSciNetCrossRefMATH Davendra D, Zelinka I, Bialic-Davendra M, Senkerik R, Jasek R (2013) Discrete self-organising migrating algorithm for flow-shop scheduling with no-wait makespan. Math Comput Model 57:100–110MathSciNetCrossRefMATH
Zurück zum Zitat Deyi L, Haijun M, Xuemei S (1995) Membership clouds and membership cloud generators. J Comput Res Dev 32(6):15–20 Deyi L, Haijun M, Xuemei S (1995) Membership clouds and membership cloud generators. J Comput Res Dev 32(6):15–20
Zurück zum Zitat Deyi L, Cheung D, Shi XM, Ng V (1998) Uncertainty reasoning based on cloud models in controllers. Comput Math Appl 35(3):99–123CrossRefMATH Deyi L, Cheung D, Shi XM, Ng V (1998) Uncertainty reasoning based on cloud models in controllers. Comput Math Appl 35(3):99–123CrossRefMATH
Zurück zum Zitat Deyi L, Di K, Deren L (2000) Knowledge representation and uncertainty reasoning in GIS based on cloud theory. In: Proceedings of the 9th international symposium on spatial data handling, vol 3a, pp 3–14 Deyi L, Di K, Deren L (2000) Knowledge representation and uncertainty reasoning in GIS based on cloud theory. In: Proceedings of the 9th international symposium on spatial data handling, vol 3a, pp 3–14
Zurück zum Zitat Deyi L, Yi D (2005) Artificial intelligence with uncertainty. Chapman & Hall, LondonMATH Deyi L, Yi D (2005) Artificial intelligence with uncertainty. Chapman & Hall, LondonMATH
Zurück zum Zitat Deyi L, Yi D (2005) Artificial intelligence with uncertainty. Chapman & Hall, LondonMATH Deyi L, Yi D (2005) Artificial intelligence with uncertainty. Chapman & Hall, LondonMATH
Zurück zum Zitat Di K, Deyi L, Deren L (1999) Cloud theory and its applications in spatial data mining knowledge discovery. J Image Graph 4A(11):930–935 Di K, Deyi L, Deren L (1999) Cloud theory and its applications in spatial data mining knowledge discovery. J Image Graph 4A(11):930–935
Zurück zum Zitat Eivazy H, Rabbani M, Ebadian M (2009) A developed production control and scheduling model in the semiconductor manufacturing systems with hybrid make-to-stock/make-to-order products. Int J Adv Manuf Technol 45:968–986. doi:10.1007/s00170-009-2028-5 CrossRef Eivazy H, Rabbani M, Ebadian M (2009) A developed production control and scheduling model in the semiconductor manufacturing systems with hybrid make-to-stock/make-to-order products. Int J Adv Manuf Technol 45:968–986. doi:10.​1007/​s00170-009-2028-5 CrossRef
Zurück zum Zitat Fang W, Yanpeng L, Xiang L (2007) A new performance evaluation method for automatic target recognition based on forward cloud. In: Proceedings of the Asia Simulation Conference, pp 337–345 Fang W, Yanpeng L, Xiang L (2007) A new performance evaluation method for automatic target recognition based on forward cloud. In: Proceedings of the Asia Simulation Conference, pp 337–345
Zurück zum Zitat Feizhou Z, Yuezu F, Chengzhi S, Deyi L (1999) Intelligent control based membership cloud generators. Acta Aeronaut Astronaut Sin 20(1):89–92 Feizhou Z, Yuezu F, Chengzhi S, Deyi L (1999) Intelligent control based membership cloud generators. Acta Aeronaut Astronaut Sin 20(1):89–92
Zurück zum Zitat Framinan JM, Nagano MS, Moccellin JV (2010) An efficient heuristic for total flow time minimisation in no-wait flow shops. Int J Adv Manuf Technol 46:1049–1057CrossRef Framinan JM, Nagano MS, Moccellin JV (2010) An efficient heuristic for total flow time minimisation in no-wait flow shops. Int J Adv Manuf Technol 46:1049–1057CrossRef
Zurück zum Zitat Framinan JM, Nagano MS (2008) Evaluating the performance for makespan minimisation in no-wait flow shop sequencing. J Mater Process Technol 197:1–9CrossRef Framinan JM, Nagano MS (2008) Evaluating the performance for makespan minimisation in no-wait flow shop sequencing. J Mater Process Technol 197:1–9CrossRef
Zurück zum Zitat Gangadharan R, Rajendran C (1993) Heuristic algorithms for scheduling in the no-wait flow shop. Int J Prod Econ 32:285–290CrossRef Gangadharan R, Rajendran C (1993) Heuristic algorithms for scheduling in the no-wait flow shop. Int J Prod Econ 32:285–290CrossRef
Zurück zum Zitat Hadj Yousssef K, Van Delft C, Dallery Y (2004) Efficient scheduling rules in a combined make-to stock and make-to order manufacturing system. Ann Oper Res 126:103–134MathSciNetCrossRefMATH Hadj Yousssef K, Van Delft C, Dallery Y (2004) Efficient scheduling rules in a combined make-to stock and make-to order manufacturing system. Ann Oper Res 126:103–134MathSciNetCrossRefMATH
Zurück zum Zitat Haijun W, Yu D (2007) Spatial clustering method based on cloud model. Proceedings of the fourth international conference on fuzzy systems and knowledge discovery, vol 7, pp 272–276 Haijun W, Yu D (2007) Spatial clustering method based on cloud model. Proceedings of the fourth international conference on fuzzy systems and knowledge discovery, vol 7, pp 272–276
Zurück zum Zitat Hall NG, Sriskandarajah C (1996) A survey of machine scheduling problems with blocking and no-wait in process. Oper Res 44:510–525MathSciNetCrossRefMATH Hall NG, Sriskandarajah C (1996) A survey of machine scheduling problems with blocking and no-wait in process. Oper Res 44:510–525MathSciNetCrossRefMATH
Zurück zum Zitat Javadi B, Saidi-Mehrabad M, Haji A, Mahdavi I, Jolai F, Mahvadi-Amiri N (2008) No-wait flow shop scheduling using fuzzy multi-objective linear programming. J Franklin Inst 345:452–467CrossRefMATH Javadi B, Saidi-Mehrabad M, Haji A, Mahdavi I, Jolai F, Mahvadi-Amiri N (2008) No-wait flow shop scheduling using fuzzy multi-objective linear programming. J Franklin Inst 345:452–467CrossRefMATH
Zurück zum Zitat Jolai F, Sheikh S, Rabbani M, Karimi B (2009) A genetic algorithm for solving no-wait flexible flow lines with due window and job rejection. Int J Adv Manuf Technol 42:523–532. doi:10.1007/s00170-008-1618-y CrossRef Jolai F, Sheikh S, Rabbani M, Karimi B (2009) A genetic algorithm for solving no-wait flexible flow lines with due window and job rejection. Int J Adv Manuf Technol 42:523–532. doi:10.​1007/​s00170-008-1618-y CrossRef
Zurück zum Zitat Jolai F, Asefi H, Rabiee M, Ramezani P (2013) Bi-objective simulated annealing approaches for no-wait two-stage flexible flow shop scheduling problem. Sci Iran E 20(3):861–872 Jolai F, Asefi H, Rabiee M, Ramezani P (2013) Bi-objective simulated annealing approaches for no-wait two-stage flexible flow shop scheduling problem. Sci Iran E 20(3):861–872
Zurück zum Zitat Kaichang D, Deyi L, Deren L (1998) Knowledge representation and discovery in spatial databases based on cloud theory. Int Arch Photogramm Remote Sens 32(3/1):544–551 Kaichang D, Deyi L, Deren L (1998) Knowledge representation and discovery in spatial databases based on cloud theory. Int Arch Photogramm Remote Sens 32(3/1):544–551
Zurück zum Zitat Khoo LP, Situmdrang TD (2003) Solving the assembly configuration problem for modular products using an immune algorithm approach. Int J Prod Res 41(15):3419–3434CrossRefMATH Khoo LP, Situmdrang TD (2003) Solving the assembly configuration problem for modular products using an immune algorithm approach. Int J Prod Res 41(15):3419–3434CrossRefMATH
Zurück zum Zitat King JR, Spachis AS (1980) Heuristics for flow shop scheduling. Int J Prod Res 18:343–357 King JR, Spachis AS (1980) Heuristics for flow shop scheduling. Int J Prod Res 18:343–357
Zurück zum Zitat Laarhoven V, Aarts E (1987) Simulated annealing: theory and applications. Kluwer Academic, Norwell 186ppCrossRefMATH Laarhoven V, Aarts E (1987) Simulated annealing: theory and applications. Kluwer Academic, Norwell 186ppCrossRefMATH
Zurück zum Zitat Laha D, Sapkal SU (2014) An improved heuristic to minimize total flow time for scheduling in the m-machine no-wait flow shop. Comput Ind Eng 67:36–43CrossRef Laha D, Sapkal SU (2014) An improved heuristic to minimize total flow time for scheduling in the m-machine no-wait flow shop. Comput Ind Eng 67:36–43CrossRef
Zurück zum Zitat Li X, Yalaoui F, Amodeo L, Chehade H (2012) Metaheuristics and exact methods to solve a multiobjective parallel machines scheduling problem. J Intell Manuf 23(4):1179–1194CrossRef Li X, Yalaoui F, Amodeo L, Chehade H (2012) Metaheuristics and exact methods to solve a multiobjective parallel machines scheduling problem. J Intell Manuf 23(4):1179–1194CrossRef
Zurück zum Zitat Lin SW, Ying KC (2013) Minimizing makespan in a blocking flow shop using a revised artificial immune system algorithm. Omega 41:383–389CrossRef Lin SW, Ying KC (2013) Minimizing makespan in a blocking flow shop using a revised artificial immune system algorithm. Omega 41:383–389CrossRef
Zurück zum Zitat Liu G, Song S, Wu C (2013) Some heuristics for no-wait flowshops with total tardiness criterion. Comput Oper Res 40:521–525MathSciNetCrossRefMATH Liu G, Song S, Wu C (2013) Some heuristics for no-wait flowshops with total tardiness criterion. Comput Oper Res 40:521–525MathSciNetCrossRefMATH
Zurück zum Zitat Liu Y, Feng Z (2014) Two-machine no-wait flowshop scheduling with learning effect and convex resource-dependent processing times. Comput Ind Eng 75:170–175CrossRef Liu Y, Feng Z (2014) Two-machine no-wait flowshop scheduling with learning effect and convex resource-dependent processing times. Comput Ind Eng 75:170–175CrossRef
Zurück zum Zitat Lv P, Yuan L, Zhang J (2009) Cloud theory-based simulated annealing algorithm and application. Eng Appl Artif Intell 22:742–749CrossRef Lv P, Yuan L, Zhang J (2009) Cloud theory-based simulated annealing algorithm and application. Eng Appl Artif Intell 22:742–749CrossRef
Zurück zum Zitat Nunes de castro L, Von Zuben FJ (1999) Artificial immune systems. Part I: Basic theory and applications, Technical Report TR-DCA 01/99. FEEC/UNICAMP, Brazil Nunes de castro L, Von Zuben FJ (1999) Artificial immune systems. Part I: Basic theory and applications, Technical Report TR-DCA 01/99. FEEC/UNICAMP, Brazil
Zurück zum Zitat Pan QK, Wang L, Qian B (2009) A novel differential evolution algorithm for bi-criteria no-wait flow shop scheduling problems. Comput Oper Res 36:2498–2511MathSciNetCrossRefMATH Pan QK, Wang L, Qian B (2009) A novel differential evolution algorithm for bi-criteria no-wait flow shop scheduling problems. Comput Oper Res 36:2498–2511MathSciNetCrossRefMATH
Zurück zum Zitat Pang KW (2013) A genetic algorithm based heuristic for two machine no-wait flow shop scheduling problems with class setup times that minimizes maximum lateness. Int J Prod Econ 141:127–136CrossRef Pang KW (2013) A genetic algorithm based heuristic for two machine no-wait flow shop scheduling problems with class setup times that minimizes maximum lateness. Int J Prod Econ 141:127–136CrossRef
Zurück zum Zitat Qian B, Wang L, Hu R, Huang DX, Wang X (2009) A DE-based approach to no-wait flow-shop scheduling. Comput Ind Eng 57:787–805CrossRef Qian B, Wang L, Hu R, Huang DX, Wang X (2009) A DE-based approach to no-wait flow-shop scheduling. Comput Ind Eng 57:787–805CrossRef
Zurück zum Zitat Rajendran C (1994) A no-wait flow shop scheduling heuristic to minimize makespan. J Oper Res Soc 45:472–478CrossRefMATH Rajendran C (1994) A no-wait flow shop scheduling heuristic to minimize makespan. J Oper Res Soc 45:472–478CrossRefMATH
Zurück zum Zitat Ramezani P, Rabiee M, Jolai F (2013) No-wait flexible flowshop with uniform parallel machines and sequence-dependent setup times: a hybrid meta-heuristic approach. J Intell Manuf. doi:10.1007/s10845-013-0830-2 Ramezani P, Rabiee M, Jolai F (2013) No-wait flexible flowshop with uniform parallel machines and sequence-dependent setup times: a hybrid meta-heuristic approach. J Intell Manuf. doi:10.​1007/​s10845-013-0830-2
Zurück zum Zitat Reddi SS, Rama-moorthy CV (1972) On the flow shop sequencing problems with no-wait intermediate queues. Oper Res Q 23:323–331CrossRef Reddi SS, Rama-moorthy CV (1972) On the flow shop sequencing problems with no-wait intermediate queues. Oper Res Q 23:323–331CrossRef
Zurück zum Zitat Ruiz R, Allahverdi A (2007) No-wait flow shop with separate setup times to minimize maximum lateness. Int. J. Adv. Manuf. Technol. 35:551–565 Ruiz R, Allahverdi A (2007) No-wait flow shop with separate setup times to minimize maximum lateness. Int. J. Adv. Manuf. Technol. 35:551–565
Zurück zum Zitat Seido Nagano M, Hissashi Miyata H, Castro Araújo D (2015) A constructive heuristic for total flowtime minimization in a no-wait flowshop with sequence-dependent setup times. J Manuf Syst 36:224–230CrossRef Seido Nagano M, Hissashi Miyata H, Castro Araújo D (2015) A constructive heuristic for total flowtime minimization in a no-wait flowshop with sequence-dependent setup times. J Manuf Syst 36:224–230CrossRef
Zurück zum Zitat Seido Nagano M, Almeida da Silva A (2012) A new evolutionary clustering search for a no-wait flow shop problem with set-uptimes. Eng Appl Artif Intell 25:1114–1120CrossRef Seido Nagano M, Almeida da Silva A (2012) A new evolutionary clustering search for a no-wait flow shop problem with set-uptimes. Eng Appl Artif Intell 25:1114–1120CrossRef
Zurück zum Zitat Shabtay D, Arviv K, Stern H, Edan Y (2014) A combined robot selection and scheduling problem for flow-shops with no-wait restrictions. Omega 43:96–107CrossRef Shabtay D, Arviv K, Stern H, Edan Y (2014) A combined robot selection and scheduling problem for flow-shops with no-wait restrictions. Omega 43:96–107CrossRef
Zurück zum Zitat Shuliang W, Deren L, Wenzhong S, Deyi L, Xinzhou W (2003) Cloud model-based spatial data mining. Geogr Inf Sci 9(2):67–78 Shuliang W, Deren L, Wenzhong S, Deyi L, Xinzhou W (2003) Cloud model-based spatial data mining. Geogr Inf Sci 9(2):67–78
Zurück zum Zitat Solimanpur M, Vrat P, Shankar R (2004) A neuro-tabu search heuristic for flow shop scheduling problem. Comput Oper Res 31:2151–2164CrossRefMATH Solimanpur M, Vrat P, Shankar R (2004) A neuro-tabu search heuristic for flow shop scheduling problem. Comput Oper Res 31:2151–2164CrossRefMATH
Zurück zum Zitat Tavakkoli-Moghaddam R, Rahimi-Vahed AR, Mirzaei AH (2008) Solving a multi-objective no-wait flow shop scheduling problem with an immune algorithm. Int J Adv Manuf Technol 36:969–981CrossRef Tavakkoli-Moghaddam R, Rahimi-Vahed AR, Mirzaei AH (2008) Solving a multi-objective no-wait flow shop scheduling problem with an immune algorithm. Int J Adv Manuf Technol 36:969–981CrossRef
Zurück zum Zitat Torabzadeh E, Zandieh M (2010) Cloud theory-based simulated annealing approach for scheduling in the two-stage assembly flowshop. Adv Eng Softw 41:1238–1243CrossRefMATH Torabzadeh E, Zandieh M (2010) Cloud theory-based simulated annealing approach for scheduling in the two-stage assembly flowshop. Adv Eng Softw 41:1238–1243CrossRefMATH
Zurück zum Zitat Tseng LY, Lin YT (2011) A hybrid genetic algorithm for no-wait flow shop scheduling problem. Eur J Oper Res 210:39–47CrossRef Tseng LY, Lin YT (2011) A hybrid genetic algorithm for no-wait flow shop scheduling problem. Eur J Oper Res 210:39–47CrossRef
Zurück zum Zitat Valente Jorge MS, Alves Rui AFS (2005) An exact approach to early/tardy scheduling with release dates. Comput Oper Res 32:2905–2917MathSciNetCrossRefMATH Valente Jorge MS, Alves Rui AFS (2005) An exact approach to early/tardy scheduling with release dates. Comput Oper Res 32:2905–2917MathSciNetCrossRefMATH
Zurück zum Zitat Wang C, Li X, Wang Q (2010) Accelerated tabu search for no-wait flowshop scheduling problem with maximum lateness criterion. Eur J Oper Res 206:64–72MathSciNetCrossRefMATH Wang C, Li X, Wang Q (2010) Accelerated tabu search for no-wait flowshop scheduling problem with maximum lateness criterion. Eur J Oper Res 206:64–72MathSciNetCrossRefMATH
Zurück zum Zitat Yingjun W, Zhongying Z (2004) Pattern mining for time series based on cloud theory pan-concept-tree. In: International conference on rough sets and current trends in computing, vol 1, pp 618–623 Yingjun W, Zhongying Z (2004) Pattern mining for time series based on cloud theory pan-concept-tree. In: International conference on rough sets and current trends in computing, vol 1, pp 618–623
Zurück zum Zitat Yunfang Z, Chaohua D, Weirong C (2005) Adaptive probabilities of crossover and mutation in genetic algorithms based on cloud generators. J Comput Inf Syst 1(4):671–678 Yunfang Z, Chaohua D, Weirong C (2005) Adaptive probabilities of crossover and mutation in genetic algorithms based on cloud generators. J Comput Inf Syst 1(4):671–678
Zurück zum Zitat Zaerpour N, Rabbani M, Gharehgozli AH, Tavakkoli-Moghaddam R (2009) A comprehensive decision making structure for partitioning of make-to-order, make-to-stock and hybrid products. Soft Comput 13:1035–1054. doi:10.1007/s00500-008-0377-x CrossRefMATH Zaerpour N, Rabbani M, Gharehgozli AH, Tavakkoli-Moghaddam R (2009) A comprehensive decision making structure for partitioning of make-to-order, make-to-stock and hybrid products. Soft Comput 13:1035–1054. doi:10.​1007/​s00500-008-0377-x CrossRefMATH
Zurück zum Zitat Zandieh M, Fatemi GHomi SMT, Moattar Husseini SM (2006) An immune algorithm approach to hybrid flow shops scheduling with sequence-dependent setup times. Appl Math Comput 180(1):111–127MathSciNetCrossRefMATH Zandieh M, Fatemi GHomi SMT, Moattar Husseini SM (2006) An immune algorithm approach to hybrid flow shops scheduling with sequence-dependent setup times. Appl Math Comput 180(1):111–127MathSciNetCrossRefMATH
Metadaten
Titel
Two new meta-heuristics for no-wait flexible flow shop scheduling problem with capacitated machines, mixed make-to-order and make-to-stock policy
verfasst von
Sana Abdollahpour
Javad Rezaian
Publikationsdatum
24.05.2016
Verlag
Springer Berlin Heidelberg
Erschienen in
Soft Computing / Ausgabe 12/2017
Print ISSN: 1432-7643
Elektronische ISSN: 1433-7479
DOI
https://doi.org/10.1007/s00500-016-2185-z

Weitere Artikel der Ausgabe 12/2017

Soft Computing 12/2017 Zur Ausgabe