Skip to main content
Erschienen in: Geotechnical and Geological Engineering 2/2020

11.10.2019 | Original Paper

Using 3D Numerical Analysis for the Assessment of Tunnel–Landslide Relationship: Bahce–Nurdag Tunnel (South of Turkey)

verfasst von: M. P. Komu, U. Guney, T. E. Kilickaya, C. Gokceoglu

Erschienen in: Geotechnical and Geological Engineering | Ausgabe 2/2020

Einloggen

Aktivieren Sie unsere intelligente Suche, um passende Fachinhalte oder Patente zu finden.

search-config
loading …

Abstract

Owing to the increase in population, transportation has become one of the major research topics. Among existing transportation systems, railway is one of the most economic and fast systems, and therefore, there has been an increase in new railway constructions in recent years. In Turkey, the longest railway tunnels, the Bahce–Nurdag high-speed rail tunnels, are under construction in the southern part of the country. This twin tubes tunnels are approximately 10 km in length, and they are excavated using tunnel boring machines (TBM). The tunnel route locates in the East Anatolian Fault Zone and the portal region is composed of debris and old landslide deposits. For this reason, mitigating the potential landslide hazard is critical for the tunnel. Therefore, the present study investigates the TBM tunnelling–landslide relationship by employing 3D numerical analyses. The analyses show that the last 600 m of the tunnel has a potential landslide hazard and some additional measures should be considered along this part to ensure tunnel safety. The tunnel conditions are highly complex, and thus it is an interesting case for tunnel engineers.

Sie haben noch keine Lizenz? Dann Informieren Sie sich jetzt über unsere Produkte:

Springer Professional "Wirtschaft+Technik"

Online-Abonnement

Mit Springer Professional "Wirtschaft+Technik" erhalten Sie Zugriff auf:

  • über 102.000 Bücher
  • über 537 Zeitschriften

aus folgenden Fachgebieten:

  • Automobil + Motoren
  • Bauwesen + Immobilien
  • Business IT + Informatik
  • Elektrotechnik + Elektronik
  • Energie + Nachhaltigkeit
  • Finance + Banking
  • Management + Führung
  • Marketing + Vertrieb
  • Maschinenbau + Werkstoffe
  • Versicherung + Risiko

Jetzt Wissensvorsprung sichern!

Springer Professional "Technik"

Online-Abonnement

Mit Springer Professional "Technik" erhalten Sie Zugriff auf:

  • über 67.000 Bücher
  • über 390 Zeitschriften

aus folgenden Fachgebieten:

  • Automobil + Motoren
  • Bauwesen + Immobilien
  • Business IT + Informatik
  • Elektrotechnik + Elektronik
  • Energie + Nachhaltigkeit
  • Maschinenbau + Werkstoffe




 

Jetzt Wissensvorsprung sichern!

Literatur
Zurück zum Zitat Allahverdi N, Nasri V (2013) Three dimensional numerical analysis for soft ground tunneling. In: Seventh international conference on case histories in geotechnical engineering, 29 April–4 May, Chicago Allahverdi N, Nasri V (2013) Three dimensional numerical analysis for soft ground tunneling. In: Seventh international conference on case histories in geotechnical engineering, 29 April–4 May, Chicago
Zurück zum Zitat Ambrasseys NN (1989) Temporary seismic quiescence, SE Turkey. Geophys J 96:311–333CrossRef Ambrasseys NN (1989) Temporary seismic quiescence, SE Turkey. Geophys J 96:311–333CrossRef
Zurück zum Zitat Arpat E, Saroglu F (1972) Dogu Anadolu Fayı ile ilgili Bazı Gozlemler. MTA Dergisi 78:44–50 Arpat E, Saroglu F (1972) Dogu Anadolu Fayı ile ilgili Bazı Gozlemler. MTA Dergisi 78:44–50
Zurück zum Zitat Arpat E, Saroglu F (1975) Turkiye’deki Bazı Onemli Genç Tektonik Olaylar. Turkiye Jeoloji Kurumu Bulteni 18:91–101 Arpat E, Saroglu F (1975) Turkiye’deki Bazı Onemli Genç Tektonik Olaylar. Turkiye Jeoloji Kurumu Bulteni 18:91–101
Zurück zum Zitat Cho WS, Song KI, Kim KY (2014) Mechanical behavior of ground due to EPB shield TBM tunnel excavation passing through fractured zone. In: Yoo C, Park S-W, Kim B, Ban H (eds) Geotechnical aspects of underground construction in soft ground. Korean Geotechnical Society, Seoul, pp 577–580CrossRef Cho WS, Song KI, Kim KY (2014) Mechanical behavior of ground due to EPB shield TBM tunnel excavation passing through fractured zone. In: Yoo C, Park S-W, Kim B, Ban H (eds) Geotechnical aspects of underground construction in soft ground. Korean Geotechnical Society, Seoul, pp 577–580CrossRef
Zurück zum Zitat Delmonaco G, Leoni G, Margottini C, Puglisi C, Spizzichino D (2003) Large scale debris-flow hazard assessment: a geotechnical approach and GIS modelling. Nat Hazards Earth Syst Sci 3:443–455CrossRef Delmonaco G, Leoni G, Margottini C, Puglisi C, Spizzichino D (2003) Large scale debris-flow hazard assessment: a geotechnical approach and GIS modelling. Nat Hazards Earth Syst Sci 3:443–455CrossRef
Zurück zum Zitat Doruk P (1991) Analysis of laboratory strength data using the original and modified Hoek brown failure criteria. Master of Science Thesis, University of Toronto Doruk P (1991) Analysis of laboratory strength data using the original and modified Hoek brown failure criteria. Master of Science Thesis, University of Toronto
Zurück zum Zitat Duman TY, Çan T, Emre Ö (2011) 1/1.500.000 Türkiye Heyelan Envanteri Haritası, Maden Tetkik ve Arama Genel Müdürlüğü Özel Yayınlar Serisi, No.27, Ankara, Türkiye Duman TY, Çan T, Emre Ö (2011) 1/1.500.000 Türkiye Heyelan Envanteri Haritası, Maden Tetkik ve Arama Genel Müdürlüğü Özel Yayınlar Serisi, No.27, Ankara, Türkiye
Zurück zum Zitat Fugro Sial Yerbilimleri Musavirlik ve Mühendislik Ltd (2014) Bahce Nurdag Gecis Tuneli (KM: 03 + 653.12–KM: 13 + 450): Jeolojik – Jeoteknik Proje Raporu Fugro Sial Yerbilimleri Musavirlik ve Mühendislik Ltd (2014) Bahce Nurdag Gecis Tuneli (KM: 03 + 653.12–KM: 13 + 450): Jeolojik – Jeoteknik Proje Raporu
Zurück zum Zitat Gokceoglu C (2018) TCDD Bakim Dairesi Başkanlığı Bahçe – Nurdağ (Fevzipaşa) Varyantı Projesi Hakkinda Ek Rapor. Hacettepe University, Ankara Gokceoglu C (2018) TCDD Bakim Dairesi Başkanlığı Bahçe – Nurdağ (Fevzipaşa) Varyantı Projesi Hakkinda Ek Rapor. Hacettepe University, Ankara
Zurück zum Zitat Herece H, Akay E (1992) Karlıova-Celikhan Arasında Dogu Anadolu Fayi, Turkiye 9. Petrol Kongresi, pp 361–372 Herece H, Akay E (1992) Karlıova-Celikhan Arasında Dogu Anadolu Fayi, Turkiye 9. Petrol Kongresi, pp 361–372
Zurück zum Zitat Hoek E (2001) Rock mass properties for underground mines. In: Hustrulid WA, Bullock RL (eds) Underground mining methods engineering fundamentals and international case studies. Society for Mining, Metallurgy, and Exploration (SME), Litleton Hoek E (2001) Rock mass properties for underground mines. In: Hustrulid WA, Bullock RL (eds) Underground mining methods engineering fundamentals and international case studies. Society for Mining, Metallurgy, and Exploration (SME), Litleton
Zurück zum Zitat Hoek E, Brown ET (1997) Practical estimates of rock mass strength. Int J Rock Mech Min Sci 34:1165–1186CrossRef Hoek E, Brown ET (1997) Practical estimates of rock mass strength. Int J Rock Mech Min Sci 34:1165–1186CrossRef
Zurück zum Zitat Hoek E, Diederichs MS (2006) Empirical estimation of rock mass modulus. Int J Rock Mech Min Sci 43:203–215CrossRef Hoek E, Diederichs MS (2006) Empirical estimation of rock mass modulus. Int J Rock Mech Min Sci 43:203–215CrossRef
Zurück zum Zitat Hoek E, Carranza-Torres CT, Corkum B (2002) Hoek–Brown failure criterion—2002 edition. In: Proceedings of the fifth North American rock mechanics symposium, Toronto, Canada, pp 267–273 Hoek E, Carranza-Torres CT, Corkum B (2002) Hoek–Brown failure criterion—2002 edition. In: Proceedings of the fifth North American rock mechanics symposium, Toronto, Canada, pp 267–273
Zurück zum Zitat Hu MJ, Wang R, Chen ZX, Wang ZB (2010) Initiation process simulation of debris deposit based on particle flow code. Rock Soil Mech 31:394–397 Hu MJ, Wang R, Chen ZX, Wang ZB (2010) Initiation process simulation of debris deposit based on particle flow code. Rock Soil Mech 31:394–397
Zurück zum Zitat Imamoglu MS, Cetin E (2007) Guneydogu Anadolu Bolgesi ve Yakin Yoresinin Depremselligi. D.Ü. Ziya Gokalp Egitim Fakultesi Dergisi 9:93–103 Imamoglu MS, Cetin E (2007) Guneydogu Anadolu Bolgesi ve Yakin Yoresinin Depremselligi. D.Ü. Ziya Gokalp Egitim Fakultesi Dergisi 9:93–103
Zurück zum Zitat Iverson RM (1997) The physics of debris flows. Rev Geophys 35:245–296CrossRef Iverson RM (1997) The physics of debris flows. Rev Geophys 35:245–296CrossRef
Zurück zum Zitat Kanungo DP, Pain A, Sarkar S, Sharma S, Jain SK, Ahmad Z (2012) Field investigation and finite element modelling of progressive debris slide in the Indian Himalayas. WIT Trans Eng Sci 73:15–26CrossRef Kanungo DP, Pain A, Sarkar S, Sharma S, Jain SK, Ahmad Z (2012) Field investigation and finite element modelling of progressive debris slide in the Indian Himalayas. WIT Trans Eng Sci 73:15–26CrossRef
Zurück zum Zitat Komu MP (2019) Investigation of tunnel boring machine-landslide relation in a tunnel excavating in a complex geological condition: Bahçe-Nurdağ Tunnel. Master Thesis, Institute of Graduate School of Science and Engineering, Hacettepe University, Ankara Komu MP (2019) Investigation of tunnel boring machine-landslide relation in a tunnel excavating in a complex geological condition: Bahçe-Nurdağ Tunnel. Master Thesis, Institute of Graduate School of Science and Engineering, Hacettepe University, Ankara
Zurück zum Zitat Lee L, Yun TS, Lee D, Lee J (2013) Assessment of K0 correlation to strength for granular materials. Soils Found 53(4):584–595CrossRef Lee L, Yun TS, Lee D, Lee J (2013) Assessment of K0 correlation to strength for granular materials. Soils Found 53(4):584–595CrossRef
Zurück zum Zitat Liu C, Zhang L, Bai B, Chen J, Wang J (2012) Nonlinear analysis of stress and strain for a clay core rock-fill dam with FEM. Procedia Eng 31:497–501CrossRef Liu C, Zhang L, Bai B, Chen J, Wang J (2012) Nonlinear analysis of stress and strain for a clay core rock-fill dam with FEM. Procedia Eng 31:497–501CrossRef
Zurück zum Zitat Marinos P, Hoek E (2001) Estimating the geotechnical properties of heterogeneous rock masses such as flysch. Bull Eng Geol Environ 60:85–92CrossRef Marinos P, Hoek E (2001) Estimating the geotechnical properties of heterogeneous rock masses such as flysch. Bull Eng Geol Environ 60:85–92CrossRef
Zurück zum Zitat McKenzie D (1972) Active tectonics of the Mediterranean region. Geophys J R Astron Soc 30:109–185CrossRef McKenzie D (1972) Active tectonics of the Mediterranean region. Geophys J R Astron Soc 30:109–185CrossRef
Zurück zum Zitat Meng Z, Xian X (2013) Analysis of the mechanical property of mudstone/shale in paralic coal measures and its influence factors. J Coal Sci Eng 19:1–7CrossRef Meng Z, Xian X (2013) Analysis of the mechanical property of mudstone/shale in paralic coal measures and its influence factors. J Coal Sci Eng 19:1–7CrossRef
Zurück zum Zitat Nalbant SS, McCloskey J, Steacy S, Barka AA (2002) Stress accumulation and increased seismic risk in eastern Turkey. Earth Planet Sci Lett 195:291–298CrossRef Nalbant SS, McCloskey J, Steacy S, Barka AA (2002) Stress accumulation and increased seismic risk in eastern Turkey. Earth Planet Sci Lett 195:291–298CrossRef
Zurück zum Zitat Salam SA, Ata A, Shaalan O, Hammad N (2015) Modeling of TBM tunnel construction for the greater Cairo metro line 3. Int J Eng Innov Technol 4:18–24 Salam SA, Ata A, Shaalan O, Hammad N (2015) Modeling of TBM tunnel construction for the greater Cairo metro line 3. Int J Eng Innov Technol 4:18–24
Zurück zum Zitat Saroglu F, Emre O, Kuscu I (1992a) Turkiye Diri Fay Haritasi. MTA Yayini, Ankara Saroglu F, Emre O, Kuscu I (1992a) Turkiye Diri Fay Haritasi. MTA Yayini, Ankara
Zurück zum Zitat Saroglu F, Emre O, Kuscu I (1992b) East Anatolian fault zone of Turkey. Annal Tect 6:99–125 Saroglu F, Emre O, Kuscu I (1992b) East Anatolian fault zone of Turkey. Annal Tect 6:99–125
Zurück zum Zitat Seymen I, Aydın A (1972) Bingol Deprem Fayi ve Bunun Kuzey Anadolu Fayi ile Iliskisi. MTA Dergisi 79:1–8 Seymen I, Aydın A (1972) Bingol Deprem Fayi ve Bunun Kuzey Anadolu Fayi ile Iliskisi. MTA Dergisi 79:1–8
Zurück zum Zitat Sonmez H, Ulusay R (2002) A discussion on the Hoek-Brown failure criterion and suggested modifications to the criterion verified by slope stability case studies. Yerbilimleri 26:77–99 Sonmez H, Ulusay R (2002) A discussion on the Hoek-Brown failure criterion and suggested modifications to the criterion verified by slope stability case studies. Yerbilimleri 26:77–99
Zurück zum Zitat TCDD (General Directorate of Turkish State Railways) (2014) Bahce Nurdag Tuneli (KM: 3 + 653–13 + 450) KM: Jeolojik – Jeoteknik Proje Raporu TCDD (General Directorate of Turkish State Railways) (2014) Bahce Nurdag Tuneli (KM: 3 + 653–13 + 450) KM: Jeolojik – Jeoteknik Proje Raporu
Zurück zum Zitat TCDD (General Directorate of Turkish State Railways) (2018) Bahce Nurdag Tuneli (KM: 3 + 510–13 + 452) KM: 3 + 510 ile KM: 4 + 110 kesimi NATM Projesi Jeolojik Profili TCDD (General Directorate of Turkish State Railways) (2018) Bahce Nurdag Tuneli (KM: 3 + 510–13 + 452) KM: 3 + 510 ile KM: 4 + 110 kesimi NATM Projesi Jeolojik Profili
Zurück zum Zitat Ulusay R, Tuncay E, Sonmez H, Gokceoglu C (2004) An attenuation relationship based on Turkish strong motion data and iso-acceleration map of Turkey. Eng Geol 74:265–291CrossRef Ulusay R, Tuncay E, Sonmez H, Gokceoglu C (2004) An attenuation relationship based on Turkish strong motion data and iso-acceleration map of Turkey. Eng Geol 74:265–291CrossRef
Zurück zum Zitat Usta D (2018) Turkıye Jeoloji Haritalari Serisi Gaziantep-N37 Paftasi, Maden Tetkik Arama Genel Mudurlugu (MTA). Jeoloji Etutleri Dairesi, No.266, Ankara Usta D (2018) Turkıye Jeoloji Haritalari Serisi Gaziantep-N37 Paftasi, Maden Tetkik Arama Genel Mudurlugu (MTA). Jeoloji Etutleri Dairesi, No.266, Ankara
Metadaten
Titel
Using 3D Numerical Analysis for the Assessment of Tunnel–Landslide Relationship: Bahce–Nurdag Tunnel (South of Turkey)
verfasst von
M. P. Komu
U. Guney
T. E. Kilickaya
C. Gokceoglu
Publikationsdatum
11.10.2019
Verlag
Springer International Publishing
Erschienen in
Geotechnical and Geological Engineering / Ausgabe 2/2020
Print ISSN: 0960-3182
Elektronische ISSN: 1573-1529
DOI
https://doi.org/10.1007/s10706-019-01084-9

Weitere Artikel der Ausgabe 2/2020

Geotechnical and Geological Engineering 2/2020 Zur Ausgabe