Skip to main content

2023 | OriginalPaper | Buchkapitel

Waste Elimination and Value Management Framework Based on Lean Design Methods

verfasst von : Mahmoud Karaz, José Cardoso Teixeira

Erschienen in: Trends on Construction in the Digital Era

Verlag: Springer International Publishing

Aktivieren Sie unsere intelligente Suche, um passende Fachinhalte oder Patente zu finden.

search-config
loading …

Abstract

Complex design processes depend on vast amounts of information, decline productivity, and cause multiple interruptions in resources and information flows. Design-related problems have been commonly studied from Lean Design Management (LDM) perspective that involves customer value, design processes, and cognitive management issues. LDM is built on the lean construction paradigm, which adopts lean production theories, principles, and practices. That provides stakeholders with problem-solving techniques and knowledge management methods at various levels of analysis (organizational, strategic, and tactical levels). Based on LDM, several social and technical measures can be applied to tackle waste and provide value for the final customer. This paper briefly reviews design-context wastes according to LDM perspectives. In this context, a conceptual model is provided that assembles LDM methods Target Value Design (TVD), Last Planner System (LPS), and Building Information Modelling (BIM). Three research gaps were detected in the reviewed methods. Firstly, there is a lack of adaptations of LDM methods toward standards for managing BIM digital assets. More research is needed to expand those methodologies to assist the decision-making processes of the involved parties in managing the construction of digital assets. Secondly, the current design task management methods adapted from agile software management and LDM are “far away from the addressing construction design peculiarities. Third, transactional audit using blockchain technology is required to secure money flow among cross-functional organizations. This research provides opportunities for applying LDM during design decision-making processes, especially TVD and LPS.

Sie haben noch keine Lizenz? Dann Informieren Sie sich jetzt über unsere Produkte:

Springer Professional "Wirtschaft+Technik"

Online-Abonnement

Mit Springer Professional "Wirtschaft+Technik" erhalten Sie Zugriff auf:

  • über 102.000 Bücher
  • über 537 Zeitschriften

aus folgenden Fachgebieten:

  • Automobil + Motoren
  • Bauwesen + Immobilien
  • Business IT + Informatik
  • Elektrotechnik + Elektronik
  • Energie + Nachhaltigkeit
  • Finance + Banking
  • Management + Führung
  • Marketing + Vertrieb
  • Maschinenbau + Werkstoffe
  • Versicherung + Risiko

Jetzt Wissensvorsprung sichern!

Springer Professional "Technik"

Online-Abonnement

Mit Springer Professional "Technik" erhalten Sie Zugriff auf:

  • über 67.000 Bücher
  • über 390 Zeitschriften

aus folgenden Fachgebieten:

  • Automobil + Motoren
  • Bauwesen + Immobilien
  • Business IT + Informatik
  • Elektrotechnik + Elektronik
  • Energie + Nachhaltigkeit
  • Maschinenbau + Werkstoffe




 

Jetzt Wissensvorsprung sichern!

Springer Professional "Wirtschaft"

Online-Abonnement

Mit Springer Professional "Wirtschaft" erhalten Sie Zugriff auf:

  • über 67.000 Bücher
  • über 340 Zeitschriften

aus folgenden Fachgebieten:

  • Bauwesen + Immobilien
  • Business IT + Informatik
  • Finance + Banking
  • Management + Führung
  • Marketing + Vertrieb
  • Versicherung + Risiko




Jetzt Wissensvorsprung sichern!

Literatur
6.
Zurück zum Zitat Koskela, L., Ballard, G., Howell, G., Tommelein, I.: The foundations of lean construction. Des. Constr. Build. Value 291(December 2015), 211–226 (2002) Koskela, L., Ballard, G., Howell, G., Tommelein, I.: The foundations of lean construction. Des. Constr. Build. Value 291(December 2015), 211–226 (2002)
12.
Zurück zum Zitat Lappalainen, E., Uusitalo, P., Seppänen, O., Peltokorpi, A.: Design process stability: observations of batch size, throughput time and reliability in design. In: IGLC 2021 - 29th Annual Conference of the International Group for Lean Construction - Lean Construction in Crisis Times: Responding to the Post-Pandemic AEC Industry Challenges, July 2021, pp. 605–612 (2021). https://doi.org/10.24928/2021/0144 Lappalainen, E., Uusitalo, P., Seppänen, O., Peltokorpi, A.: Design process stability: observations of batch size, throughput time and reliability in design. In: IGLC 2021 - 29th Annual Conference of the International Group for Lean Construction - Lean Construction in Crisis Times: Responding to the Post-Pandemic AEC Industry Challenges, July 2021, pp. 605–612 (2021). https://​doi.​org/​10.​24928/​2021/​0144
15.
Zurück zum Zitat Uusitalo, P., Lehtovaara, J., Peltokorpi, A.: Waste in design management operations from the viewpoint of project needs. In: Proceedings of the 28th Annual Conference of the International Group for Lean Construction (IGLC), Berkeley, California, USA, 6–10 July 2020, pp. 73–83 (2020) Uusitalo, P., Lehtovaara, J., Peltokorpi, A.: Waste in design management operations from the viewpoint of project needs. In: Proceedings of the 28th Annual Conference of the International Group for Lean Construction (IGLC), Berkeley, California, USA, 6–10 July 2020, pp. 73–83 (2020)
16.
Zurück zum Zitat Tzortzopoulos, P., dos Santos Hentschke, C., Kagioglou, M.: Lean product development and design management. In: Lean Construction, pp. 14–44. Routledge (2020) Tzortzopoulos, P., dos Santos Hentschke, C., Kagioglou, M.: Lean product development and design management. In: Lean Construction, pp. 14–44. Routledge (2020)
18.
Zurück zum Zitat Rooke, J.: People and knowledge: lean organization. In: Lean Construction, pp. 85–101. Routledge (2020) Rooke, J.: People and knowledge: lean organization. In: Lean Construction, pp. 85–101. Routledge (2020)
19.
Zurück zum Zitat Tommelein, I.D., Gholami, S.: Root causes of clashes in building information models. In: IGLC 2012 - 20th Conference of the International Group for Lean Construction, vol. 1, no. 510 (2012) Tommelein, I.D., Gholami, S.: Root causes of clashes in building information models. In: IGLC 2012 - 20th Conference of the International Group for Lean Construction, vol. 1, no. 510 (2012)
22.
Zurück zum Zitat Lappalainen, E., Uusitalo, P., Seppänen, O., Peltokorpi, A.: Design process stability: observations of batch size, throughput time and reliability in design. In: Proceedings of the 29th Annual Conference on International Group for Lean Construction, pp. 605–612 (2021). https://doi.org/10.24928/2021/0144 Lappalainen, E., Uusitalo, P., Seppänen, O., Peltokorpi, A.: Design process stability: observations of batch size, throughput time and reliability in design. In: Proceedings of the 29th Annual Conference on International Group for Lean Construction, pp. 605–612 (2021). https://​doi.​org/​10.​24928/​2021/​0144
23.
Zurück zum Zitat Uusitalo, P., Olivieri, H., Seppänen, O., Pikas, E., Peltokorpi, A.: Review of lean design management: processes, methods and technologies. In: 25th Annual Conference of the International Group for Lean Construction, pp. 571–578 (2017). https://doi.org/10.24928/2017/0224 Uusitalo, P., Olivieri, H., Seppänen, O., Pikas, E., Peltokorpi, A.: Review of lean design management: processes, methods and technologies. In: 25th Annual Conference of the International Group for Lean Construction, pp. 571–578 (2017). https://​doi.​org/​10.​24928/​2017/​0224
24.
Zurück zum Zitat Ballard, G.: Rethinking project definition in terms of target costing. In: Understanding and Managing the Construction Process: Theory and Practice - 14th Annual Conference of the International Group for Lean Construction, IGLC-14, pp. 77–89 (2006) Ballard, G.: Rethinking project definition in terms of target costing. In: Understanding and Managing the Construction Process: Theory and Practice - 14th Annual Conference of the International Group for Lean Construction, IGLC-14, pp. 77–89 (2006)
27.
Zurück zum Zitat Ballard, G.: The Last Planner System of Production Control. University of Birmingham, UK (2000) Ballard, G.: The Last Planner System of Production Control. University of Birmingham, UK (2000)
28.
Zurück zum Zitat Ballard, G.: The last planner system. In: Lean Construction, pp. 45–53. Routledge (2020) Ballard, G.: The last planner system. In: Lean Construction, pp. 45–53. Routledge (2020)
33.
Zurück zum Zitat Sacks, R., Eastman, C., Lee, G., Teicholz, P.: BIM Handbook, 3rd edn. Wiley, Hoboken (2018)CrossRef Sacks, R., Eastman, C., Lee, G., Teicholz, P.: BIM Handbook, 3rd edn. Wiley, Hoboken (2018)CrossRef
35.
Zurück zum Zitat Dave, B.: Developing a Construction Management System Based on Lean Construction and Building Information Modelling. University of Salford (2013) Dave, B.: Developing a Construction Management System Based on Lean Construction and Building Information Modelling. University of Salford (2013)
39.
Zurück zum Zitat Michaud, M., Forgues, D., Meyer, J., Ouellet-Plamondon, C.: A case study on improving standardization in the conception phase by developing tools and protocols. In: 27th Annual Conference on International Group for Lean Construction, IGLC 2019, pp. 927–936 (2020). https://doi.org/10.24928/2019/0176 Michaud, M., Forgues, D., Meyer, J., Ouellet-Plamondon, C.: A case study on improving standardization in the conception phase by developing tools and protocols. In: 27th Annual Conference on International Group for Lean Construction, IGLC 2019, pp. 927–936 (2020). https://​doi.​org/​10.​24928/​2019/​0176
41.
Zurück zum Zitat Pedo, B., Tezel, A., Koskela, L., Whitelock-Wainwright, A., Lenagan, D., Nguyen, Q.A.: Lean contributions to BIM processes: the case of clash management in highways design. In: Proceedings of the 29th Annual Conference of the International Group for Lean Construction (IGLC), pp. 116–125 (2021). https://doi.org/10.24928/2021/0164 Pedo, B., Tezel, A., Koskela, L., Whitelock-Wainwright, A., Lenagan, D., Nguyen, Q.A.: Lean contributions to BIM processes: the case of clash management in highways design. In: Proceedings of the 29th Annual Conference of the International Group for Lean Construction (IGLC), pp. 116–125 (2021). https://​doi.​org/​10.​24928/​2021/​0164
42.
Zurück zum Zitat Dave, B., Sacks, R.: Construction at the next nexus of Lean and BIM. In: Lean Construction: Core Concepts and New Frontiers, pp. 54–84. Routledge (2020) Dave, B., Sacks, R.: Construction at the next nexus of Lean and BIM. In: Lean Construction: Core Concepts and New Frontiers, pp. 54–84. Routledge (2020)
Metadaten
Titel
Waste Elimination and Value Management Framework Based on Lean Design Methods
verfasst von
Mahmoud Karaz
José Cardoso Teixeira
Copyright-Jahr
2023
DOI
https://doi.org/10.1007/978-3-031-20241-4_23