Skip to main content
Erschienen in: Production Engineering 5-6/2015

05.10.2015 | Production Management

Workload control policies under continuous order release

verfasst von: Paolo Renna

Erschienen in: Production Engineering | Ausgabe 5-6/2015

Einloggen

Aktivieren Sie unsere intelligente Suche, um passende Fachinhalte oder Patente zu finden.

search-config
loading …

Abstract

This paper analyses the workload control in manufacturing systems under continuous order release by a simulation environment. The main issues investigated in the proposed research regard the selection of the order to release, among the orders in a pre-shop queue, the workload computation based on the routing of the orders and the workload norm. The simulations are conducted changing the number of bottleneck in the manufacturing system tested. The simulation results highlight how two of the proposed policies lead to better performance measures compared to a policy proposed in literature. The main contributions regard the higher improvements for the due date performance (average lateness and percentage of orders in delay) introducing a pre-shop queue management balancing the workload and the computation of the corrected workload considering the average utilization of the work centers.

Sie haben noch keine Lizenz? Dann Informieren Sie sich jetzt über unsere Produkte:

Springer Professional "Wirtschaft+Technik"

Online-Abonnement

Mit Springer Professional "Wirtschaft+Technik" erhalten Sie Zugriff auf:

  • über 102.000 Bücher
  • über 537 Zeitschriften

aus folgenden Fachgebieten:

  • Automobil + Motoren
  • Bauwesen + Immobilien
  • Business IT + Informatik
  • Elektrotechnik + Elektronik
  • Energie + Nachhaltigkeit
  • Finance + Banking
  • Management + Führung
  • Marketing + Vertrieb
  • Maschinenbau + Werkstoffe
  • Versicherung + Risiko

Jetzt Wissensvorsprung sichern!

Springer Professional "Technik"

Online-Abonnement

Mit Springer Professional "Technik" erhalten Sie Zugriff auf:

  • über 67.000 Bücher
  • über 390 Zeitschriften

aus folgenden Fachgebieten:

  • Automobil + Motoren
  • Bauwesen + Immobilien
  • Business IT + Informatik
  • Elektrotechnik + Elektronik
  • Energie + Nachhaltigkeit
  • Maschinenbau + Werkstoffe




 

Jetzt Wissensvorsprung sichern!

Literatur
1.
Zurück zum Zitat Atwater JB, Chakravorty SS (2002) A study of the utilization of capacity constrained resources in drum-buffer-rope systems. Prod Oper Manag 11(2):259–273CrossRef Atwater JB, Chakravorty SS (2002) A study of the utilization of capacity constrained resources in drum-buffer-rope systems. Prod Oper Manag 11(2):259–273CrossRef
2.
Zurück zum Zitat Bertrand JWM, Van Ooijen HPG (2002) Workload based order release and productivity: a missing link. Prod Plan Control 13:665–678CrossRef Bertrand JWM, Van Ooijen HPG (2002) Workload based order release and productivity: a missing link. Prod Plan Control 13:665–678CrossRef
3.
Zurück zum Zitat Blackstone JH, Cox JF (2002) Designing unbalanced lines—understanding protective capacity and protective inventory. Prod Plan Control 13(4):416–423CrossRef Blackstone JH, Cox JF (2002) Designing unbalanced lines—understanding protective capacity and protective inventory. Prod Plan Control 13(4):416–423CrossRef
4.
Zurück zum Zitat Breithaupt JW, Land J, Nyhuis P (2002) The workload control concept: theory and practical extensions of load oriented order release. Prod Plan Control 13(7):625–638CrossRef Breithaupt JW, Land J, Nyhuis P (2002) The workload control concept: theory and practical extensions of load oriented order release. Prod Plan Control 13(7):625–638CrossRef
5.
Zurück zum Zitat Centeno MA, Reyes MF (1998) So you have your model: what to do next a tutorial on simulation output analysis. In: Proceedings of the 1998 winter simulation conference 1998 Centeno MA, Reyes MF (1998) So you have your model: what to do next a tutorial on simulation output analysis. In: Proceedings of the 1998 winter simulation conference 1998
6.
Zurück zum Zitat Fernandes NO, Carmo-Silva S (2011) Workload control under continuous order release. Int J Prod Econ 131:257–262CrossRef Fernandes NO, Carmo-Silva S (2011) Workload control under continuous order release. Int J Prod Econ 131:257–262CrossRef
7.
Zurück zum Zitat Fernandes NO, Land MJ, Carmo-Silva S (2014) Workload control in unbalanced job shops. Int J Prod Res 52(3):679–690CrossRef Fernandes NO, Land MJ, Carmo-Silva S (2014) Workload control in unbalanced job shops. Int J Prod Res 52(3):679–690CrossRef
8.
Zurück zum Zitat Fredendall LD, Divesh O, Patterson JW (2010) Concerning the theory of workload control. Eur J Oper Res 201:99–111MATHCrossRef Fredendall LD, Divesh O, Patterson JW (2010) Concerning the theory of workload control. Eur J Oper Res 201:99–111MATHCrossRef
9.
Zurück zum Zitat Land MJ, Gaalman GJC (1996) Workload control concepts in job shops: a critical assessment. Int J Prod Econ 46–47:535–538CrossRef Land MJ, Gaalman GJC (1996) Workload control concepts in job shops: a critical assessment. Int J Prod Econ 46–47:535–538CrossRef
10.
Zurück zum Zitat Melnyk SA, Ragatz GL (1989) Order review/release: research issues and perspectives. Int J Prod Res 27(7):1081–1096CrossRef Melnyk SA, Ragatz GL (1989) Order review/release: research issues and perspectives. Int J Prod Res 27(7):1081–1096CrossRef
11.
Zurück zum Zitat Missbauer H (2009) Models of the transient behaviour of production units to optimize the aggregate material flow. Int J Prod Econ 118(2):387–397CrossRef Missbauer H (2009) Models of the transient behaviour of production units to optimize the aggregate material flow. Int J Prod Econ 118(2):387–397CrossRef
12.
Zurück zum Zitat Oosterman BJ, Land MJ, Gaalman GJC (2000) The influence of shop characteristics on workload control. Int J Prod Econ 68(1):107–119CrossRef Oosterman BJ, Land MJ, Gaalman GJC (2000) The influence of shop characteristics on workload control. Int J Prod Econ 68(1):107–119CrossRef
13.
Zurück zum Zitat Stevenson M, Hendry LC, Kingsman BG (2005) A review of production planning and control: the applicability of key concepts to the make-to-order industry. Int J Prod Res 43(5):869–898CrossRef Stevenson M, Hendry LC, Kingsman BG (2005) A review of production planning and control: the applicability of key concepts to the make-to-order industry. Int J Prod Res 43(5):869–898CrossRef
14.
Zurück zum Zitat Stevenson M, Silva C (2008) Theoretical development of workload control methodology: evidence from two case studies. Int J Prod Res 46(11):3107–3131MATHCrossRef Stevenson M, Silva C (2008) Theoretical development of workload control methodology: evidence from two case studies. Int J Prod Res 46(11):3107–3131MATHCrossRef
15.
Zurück zum Zitat Thürer M, Silva C, Stevenson M, Land MJ (2012) Improving the applicability of workload control: the influence of sequence dependent set-up times on workload controlled job shops. Int J Prod Res 50(22):6419–6430CrossRef Thürer M, Silva C, Stevenson M, Land MJ (2012) Improving the applicability of workload control: the influence of sequence dependent set-up times on workload controlled job shops. Int J Prod Res 50(22):6419–6430CrossRef
16.
Zurück zum Zitat Thürer M, Silva C, Stevenson M (2014) Controlled order release: a performance assessment in job shops with sequence dependent set-up times. Prod Plan Control 25(7):603–615CrossRef Thürer M, Silva C, Stevenson M (2014) Controlled order release: a performance assessment in job shops with sequence dependent set-up times. Prod Plan Control 25(7):603–615CrossRef
17.
Zurück zum Zitat Thürer M, Qu T, Stevenson M, Maschek T, Godinho Filho M (2014) Continuous workload control order release revisited: an assessment by simulation. Int J Prod Res 52(22):6664–6680CrossRef Thürer M, Qu T, Stevenson M, Maschek T, Godinho Filho M (2014) Continuous workload control order release revisited: an assessment by simulation. Int J Prod Res 52(22):6664–6680CrossRef
18.
Zurück zum Zitat Thürer M, Silva C, Stevenson M (2011) Optimising workload norms: the influence of shop floor characteristics on setting workload norms for the workload control concept. Int J Prod Res 49(4):1151–1171CrossRef Thürer M, Silva C, Stevenson M (2011) Optimising workload norms: the influence of shop floor characteristics on setting workload norms for the workload control concept. Int J Prod Res 49(4):1151–1171CrossRef
19.
Zurück zum Zitat Thürer M, Stevenson M, Silva C, Land MJ, Fredendall LD (2012) workload control (wlc) and order release: a lean solution for make-to-order companies. Prod Oper Manag 21(5):939–953CrossRef Thürer M, Stevenson M, Silva C, Land MJ, Fredendall LD (2012) workload control (wlc) and order release: a lean solution for make-to-order companies. Prod Oper Manag 21(5):939–953CrossRef
20.
Zurück zum Zitat Thürer M, Land MJ, Stevenson M, Fredendall LD, Godinho Filho M (2014) Concerning workload control and order release: the pre-shop pool sequencing decision. Prod Oper Manag. doi:10.1111/poms.12304 Thürer M, Land MJ, Stevenson M, Fredendall LD, Godinho Filho M (2014) Concerning workload control and order release: the pre-shop pool sequencing decision. Prod Oper Manag. doi:10.​1111/​poms.​12304
21.
Zurück zum Zitat Zafar H, Zuhairi M, Harle D, Andonovic I (2012) A review of techniques for the analysis of simulation output. IETE Technical Review 29(3):223–228CrossRef Zafar H, Zuhairi M, Harle D, Andonovic I (2012) A review of techniques for the analysis of simulation output. IETE Technical Review 29(3):223–228CrossRef
Metadaten
Titel
Workload control policies under continuous order release
verfasst von
Paolo Renna
Publikationsdatum
05.10.2015
Verlag
Springer Berlin Heidelberg
Erschienen in
Production Engineering / Ausgabe 5-6/2015
Print ISSN: 0944-6524
Elektronische ISSN: 1863-7353
DOI
https://doi.org/10.1007/s11740-015-0639-2

Weitere Artikel der Ausgabe 5-6/2015

Production Engineering 5-6/2015 Zur Ausgabe

    Marktübersichten

    Die im Laufe eines Jahres in der „adhäsion“ veröffentlichten Marktübersichten helfen Anwendern verschiedenster Branchen, sich einen gezielten Überblick über Lieferantenangebote zu verschaffen.