Skip to main content

2019 | OriginalPaper | Buchkapitel

19. Advanced Production Planning and Scheduling Systems

verfasst von : Henk Zijm, Marco Schutten

Erschienen in: Operations, Logistics and Supply Chain Management

Verlag: Springer International Publishing

Aktivieren Sie unsere intelligente Suche, um passende Fachinhalte oder Patente zu finden.

search-config
loading …

Abstract

In this chapter, we present algorithms for a number of functions of the production planning framework presented in Chap. 5. We focus on models for integrated Capacity and Master Production Planning, Job Planning and Resource Group Loading, and Shop Floor Scheduling and Control. At the Master Production Planning level, we exploit a simple Linear Programming formulation to set appropriate capacity levels and in particular to decide whether a temporary expansion of capacity is needed (e.g., through overtime work). With the same formulation, we decide what end-items are to be produced in which period. By applying the lead time offset procedure that is the heart of Materials Requirements Planning, and using the Bill of Materials information, the same is done on the level of part manufacturing (basic level). Essential in the above procedure are two parameters, the effective overall capacity of each manufacturing shop and the final assembly department, often indicated as the maximum throughput, and the lead times needed to complete a part or product in each department. A significant portion of these lead times may in fact be waiting times in front of individual workstations that are busy. To minimize these waiting times, workload control norms are often used which in turn may influence the effective capacity. An essential question then is what these workloads should be in order to match a desired throughput and production lead time. That question is answered by exploiting a Closed Queueing Network approach that explicitly determines the relation between a preset work-in-process level, throughput and the resulting lead times (advanced level). Finally, we exploit a detailed shop floor scheduling procedure, called the Shifting Bottleneck approach, that basically serves to ascertain that internal due-dates, following from the above defined internal manufacturing lead times are indeed met (state-of-the-art).

Sie haben noch keine Lizenz? Dann Informieren Sie sich jetzt über unsere Produkte:

Springer Professional "Wirtschaft+Technik"

Online-Abonnement

Mit Springer Professional "Wirtschaft+Technik" erhalten Sie Zugriff auf:

  • über 102.000 Bücher
  • über 537 Zeitschriften

aus folgenden Fachgebieten:

  • Automobil + Motoren
  • Bauwesen + Immobilien
  • Business IT + Informatik
  • Elektrotechnik + Elektronik
  • Energie + Nachhaltigkeit
  • Finance + Banking
  • Management + Führung
  • Marketing + Vertrieb
  • Maschinenbau + Werkstoffe
  • Versicherung + Risiko

Jetzt Wissensvorsprung sichern!

Springer Professional "Technik"

Online-Abonnement

Mit Springer Professional "Technik" erhalten Sie Zugriff auf:

  • über 67.000 Bücher
  • über 390 Zeitschriften

aus folgenden Fachgebieten:

  • Automobil + Motoren
  • Bauwesen + Immobilien
  • Business IT + Informatik
  • Elektrotechnik + Elektronik
  • Energie + Nachhaltigkeit
  • Maschinenbau + Werkstoffe




 

Jetzt Wissensvorsprung sichern!

Springer Professional "Wirtschaft"

Online-Abonnement

Mit Springer Professional "Wirtschaft" erhalten Sie Zugriff auf:

  • über 67.000 Bücher
  • über 340 Zeitschriften

aus folgenden Fachgebieten:

  • Bauwesen + Immobilien
  • Business IT + Informatik
  • Finance + Banking
  • Management + Führung
  • Marketing + Vertrieb
  • Versicherung + Risiko




Jetzt Wissensvorsprung sichern!

Literatur
Zurück zum Zitat Adams J, Balas E, Zawack D (1988) The shifting bottleneck procedure for job shop scheduling. Manag Sci 34:391–401MathSciNetCrossRef Adams J, Balas E, Zawack D (1988) The shifting bottleneck procedure for job shop scheduling. Manag Sci 34:391–401MathSciNetCrossRef
Zurück zum Zitat Bitran GR, Haas EA, Hax AC (1982) Hierarchical production planning: a two stage system. Oper Res 30:232–251CrossRef Bitran GR, Haas EA, Hax AC (1982) Hierarchical production planning: a two stage system. Oper Res 30:232–251CrossRef
Zurück zum Zitat Brucker P, Jurisch B, Sievers B (1994) A branch and bound algorithm for the job-shop scheduling problem. Discrete Appl Math 49:107–127MathSciNetCrossRef Brucker P, Jurisch B, Sievers B (1994) A branch and bound algorithm for the job-shop scheduling problem. Discrete Appl Math 49:107–127MathSciNetCrossRef
Zurück zum Zitat Buitenhek R, van Houtum GJ, Zijm WHM (2000) AMVA based solution procedures for open queueing networks with a population constraint. Ann Oper Res 93:15–40MathSciNetCrossRef Buitenhek R, van Houtum GJ, Zijm WHM (2000) AMVA based solution procedures for open queueing networks with a population constraint. Ann Oper Res 93:15–40MathSciNetCrossRef
Zurück zum Zitat Buzacott JA, Shanthikumar JG (1993) Stochastic models of manufacturing systems. Prentice-Hall, Englewood Cliffs, NJ Buzacott JA, Shanthikumar JG (1993) Stochastic models of manufacturing systems. Prentice-Hall, Englewood Cliffs, NJ
Zurück zum Zitat Chen H, Yao DD (2001) Fundamentals of queueing networks—performance, asymptotics and optimization. Springer, New YorkCrossRef Chen H, Yao DD (2001) Fundamentals of queueing networks—performance, asymptotics and optimization. Springer, New YorkCrossRef
Zurück zum Zitat Dallery Y (1990) Approximate analysis of general open queueing networks with restricted capacity. Perform Eval 11:209–222CrossRef Dallery Y (1990) Approximate analysis of general open queueing networks with restricted capacity. Perform Eval 11:209–222CrossRef
Zurück zum Zitat Di Mascolo M, Frein Y, Dallery Y (1996) An analytical method for performance evaluation of Kanban-controlled production systems. Oper Res 44(1):50–64CrossRef Di Mascolo M, Frein Y, Dallery Y (1996) An analytical method for performance evaluation of Kanban-controlled production systems. Oper Res 44(1):50–64CrossRef
Zurück zum Zitat Hax AC, Candea D (1984) Production and inventory management. Prentice-Hall, Englewood Cliffs, NJ Hax AC, Candea D (1984) Production and inventory management. Prentice-Hall, Englewood Cliffs, NJ
Zurück zum Zitat Hax AC, Meal HC (1975) Hierarchical integration of production planning and scheduling. In: Geisler MA (ed) Logistics. Studies in the management sciences, vol 1. Elsevier, North-Holland Hax AC, Meal HC (1975) Hierarchical integration of production planning and scheduling. In: Geisler MA (ed) Logistics. Studies in the management sciences, vol 1. Elsevier, North-Holland
Zurück zum Zitat Hopp WJ, Spearman ML (2008) Factory physics: foundations of manufacturing management. Richard D. Irwin, Homewood, IL Hopp WJ, Spearman ML (2008) Factory physics: foundations of manufacturing management. Richard D. Irwin, Homewood, IL
Zurück zum Zitat Ivens P, Lambrecht M (1996) Extending the shifting bottleneck procedure to real-life applications. Eur J Oper Res 90:252–268CrossRef Ivens P, Lambrecht M (1996) Extending the shifting bottleneck procedure to real-life applications. Eur J Oper Res 90:252–268CrossRef
Zurück zum Zitat Pinedo M, Chao X (1996) Operations scheduling with applications to manufacturing and services. Irwin/McGraw-Hill, BostonMATH Pinedo M, Chao X (1996) Operations scheduling with applications to manufacturing and services. Irwin/McGraw-Hill, BostonMATH
Zurück zum Zitat Reiser M, Lavenberg SS (1980) Mean-value analysis of closed multichain queueing networks. J Assoc Comput Mach 27:313—322 Reiser M, Lavenberg SS (1980) Mean-value analysis of closed multichain queueing networks. J Assoc Comput Mach 27:313—322
Zurück zum Zitat Silver EA, Pyke DF, Thomas DJ (2017) Inventory and production management in supply chains. CRC Press (Taylor and Francis), Boca Raton Silver EA, Pyke DF, Thomas DJ (2017) Inventory and production management in supply chains. CRC Press (Taylor and Francis), Boca Raton
Zurück zum Zitat Schutten JMJ, Leussink RAM (1996) Parallel machine scheduling with release dates, due dates and family setup times. Int J Prod Econ 46–47:119–125CrossRef Schutten JMJ, Leussink RAM (1996) Parallel machine scheduling with release dates, due dates and family setup times. Int J Prod Econ 46–47:119–125CrossRef
Zurück zum Zitat Schutten JMJ, van de Velde SL, Zijm WHM (1996) Single-machine scheduling with release dates, due dates and family setup times. Manag Sci 42(8):1165–1174CrossRef Schutten JMJ, van de Velde SL, Zijm WHM (1996) Single-machine scheduling with release dates, due dates and family setup times. Manag Sci 42(8):1165–1174CrossRef
Zurück zum Zitat Slomp J (1993) Production control for flexible manufacturing system—an application-oriented approach. PhD thesis, University of Twente Slomp J (1993) Production control for flexible manufacturing system—an application-oriented approach. PhD thesis, University of Twente
Zurück zum Zitat Zijm WHM, Buitenhek R (1996) Capacity planning and lead time management. Int J Prod Econ 46–47:165–179CrossRef Zijm WHM, Buitenhek R (1996) Capacity planning and lead time management. Int J Prod Econ 46–47:165–179CrossRef
Zurück zum Zitat Zijm WHM (2000) Towards intelligent manufacturing planning and control systems. OR Spectr 22:313–345CrossRef Zijm WHM (2000) Towards intelligent manufacturing planning and control systems. OR Spectr 22:313–345CrossRef
Metadaten
Titel
Advanced Production Planning and Scheduling Systems
verfasst von
Henk Zijm
Marco Schutten
Copyright-Jahr
2019
DOI
https://doi.org/10.1007/978-3-319-92447-2_19

Premium Partner