Skip to main content

2016 | OriginalPaper | Buchkapitel

Comparing PLM and BIM from the Product Structure Standpoint

verfasst von : Conrad Boton, Louis Rivest, Daniel Forgues, Julie Jupp

Erschienen in: Product Lifecycle Management for Digital Transformation of Industries

Verlag: Springer International Publishing

Aktivieren Sie unsere intelligente Suche, um passende Fachinhalte oder Patente zu finden.

search-config
loading …

Abstract

The increasing use of Building Information Modelling (BIM) across the construction industry highlights the potential for a common endpoint with manufacturing industries. Previous research work has shown that it is possible to improve BIM with the features and the best practices from Product Lifecycle Management (PLM) approach. This article provides a comparison between the PLM and BIM approaches from the standpoint of the Product Structure (PS) and the Bill of Material (BOM). It discusses the need to explicit a structuring concept in the BIM approach in order be able to switch to an information-centric management approach in construction projects instead of the current activity-based approach.

Sie haben noch keine Lizenz? Dann Informieren Sie sich jetzt über unsere Produkte:

Springer Professional "Wirtschaft+Technik"

Online-Abonnement

Mit Springer Professional "Wirtschaft+Technik" erhalten Sie Zugriff auf:

  • über 102.000 Bücher
  • über 537 Zeitschriften

aus folgenden Fachgebieten:

  • Automobil + Motoren
  • Bauwesen + Immobilien
  • Business IT + Informatik
  • Elektrotechnik + Elektronik
  • Energie + Nachhaltigkeit
  • Finance + Banking
  • Management + Führung
  • Marketing + Vertrieb
  • Maschinenbau + Werkstoffe
  • Versicherung + Risiko

Jetzt Wissensvorsprung sichern!

Springer Professional "Technik"

Online-Abonnement

Mit Springer Professional "Technik" erhalten Sie Zugriff auf:

  • über 67.000 Bücher
  • über 390 Zeitschriften

aus folgenden Fachgebieten:

  • Automobil + Motoren
  • Bauwesen + Immobilien
  • Business IT + Informatik
  • Elektrotechnik + Elektronik
  • Energie + Nachhaltigkeit
  • Maschinenbau + Werkstoffe




 

Jetzt Wissensvorsprung sichern!

Springer Professional "Wirtschaft"

Online-Abonnement

Mit Springer Professional "Wirtschaft" erhalten Sie Zugriff auf:

  • über 67.000 Bücher
  • über 340 Zeitschriften

aus folgenden Fachgebieten:

  • Bauwesen + Immobilien
  • Business IT + Informatik
  • Finance + Banking
  • Management + Führung
  • Marketing + Vertrieb
  • Versicherung + Risiko




Jetzt Wissensvorsprung sichern!

Literatur
1.
Zurück zum Zitat Howard, H., Levitt, R., Paulson, B.C., Pohl, J.G., Tatum, C.B.: Computer integration: reducing fragmentation in AEC industry. J. Comput. Civ. Eng. 3, 18–32 (1989)CrossRef Howard, H., Levitt, R., Paulson, B.C., Pohl, J.G., Tatum, C.B.: Computer integration: reducing fragmentation in AEC industry. J. Comput. Civ. Eng. 3, 18–32 (1989)CrossRef
2.
Zurück zum Zitat Sacks, R., Barak, R.: Impact of three-dimensional parametric modeling of buildings on productivity in structural engineering practice. Autom. Constr. 17, 439–449 (2008)CrossRef Sacks, R., Barak, R.: Impact of three-dimensional parametric modeling of buildings on productivity in structural engineering practice. Autom. Constr. 17, 439–449 (2008)CrossRef
3.
Zurück zum Zitat Arayici, Y., Coates, P., Koskela, L., Kagioglou, M., Usher, C., O’Reilly, K.: Technology adoption in the BIM implementation for lean architectural practice. Autom. Constr. 20, 189–195 (2011)CrossRef Arayici, Y., Coates, P., Koskela, L., Kagioglou, M., Usher, C., O’Reilly, K.: Technology adoption in the BIM implementation for lean architectural practice. Autom. Constr. 20, 189–195 (2011)CrossRef
4.
Zurück zum Zitat Eastman, C., Teicholz, P., Sacks, R., Liston, K.: BIM Handbook: A Guide to Building Information Modeling for Owners, Managers, Engineers, and Contractors. Wiley, Hoboken (2008)CrossRef Eastman, C., Teicholz, P., Sacks, R., Liston, K.: BIM Handbook: A Guide to Building Information Modeling for Owners, Managers, Engineers, and Contractors. Wiley, Hoboken (2008)CrossRef
5.
Zurück zum Zitat Eadie, R., Browne, M., Odeyinka, H., McKeown, C., McNiff, S.: BIM implementation throughout the UK construction project lifecycle: an analysis. Autom. Constr. 36, 145–151 (2013)CrossRef Eadie, R., Browne, M., Odeyinka, H., McKeown, C., McNiff, S.: BIM implementation throughout the UK construction project lifecycle: an analysis. Autom. Constr. 36, 145–151 (2013)CrossRef
6.
Zurück zum Zitat Jupp, J.R.: Incomplete BIM implementation: exploring challenges and the role of product lifecycle management functions. In: Bernard, A., Rivest, L., Dutta, D. (eds.) PLM 2013. IAICT, vol. 409, pp. 630–640. Springer, Heidelberg (2013). doi:10.1007/978-3-642-41501-2_62 CrossRef Jupp, J.R.: Incomplete BIM implementation: exploring challenges and the role of product lifecycle management functions. In: Bernard, A., Rivest, L., Dutta, D. (eds.) PLM 2013. IAICT, vol. 409, pp. 630–640. Springer, Heidelberg (2013). doi:10.​1007/​978-3-642-41501-2_​62 CrossRef
7.
Zurück zum Zitat Jupp, J.R., Nepal, M.: BIM and PLM: comparing and learning from changes to professional practice across sectors. In: Fukuda, S., Bernard, A., Gurumoorthy, B., Bouras, A. (eds.) PLM 2014. IAICT, vol. 442, pp. 41–50. Springer, Heidelberg (2014). doi:10.1007/978-3-662-45937-9_5 Jupp, J.R., Nepal, M.: BIM and PLM: comparing and learning from changes to professional practice across sectors. In: Fukuda, S., Bernard, A., Gurumoorthy, B., Bouras, A. (eds.) PLM 2014. IAICT, vol. 442, pp. 41–50. Springer, Heidelberg (2014). doi:10.​1007/​978-3-662-45937-9_​5
8.
Zurück zum Zitat Aram, S., Eastman, C.: Integration of PLM solutions and BIM systems for the AEC industry. In: Proceedings of 30th International Symposium of Automation and Robotics in Construction and Mining, Montreal, pp. 1046–1055 (2013) Aram, S., Eastman, C.: Integration of PLM solutions and BIM systems for the AEC industry. In: Proceedings of 30th International Symposium of Automation and Robotics in Construction and Mining, Montreal, pp. 1046–1055 (2013)
9.
Zurück zum Zitat Holzer, D.: Fostering the link from PLM to ERP via BIM. In: Fukuda, S., Bernard, A., Gurumoorthy, B., Bouras, A. (eds.) PLM 2014. IAICT, vol. 442, pp. 75–82. Springer, Heidelberg (2014). doi:10.1007/978-3-662-45937-9_8 Holzer, D.: Fostering the link from PLM to ERP via BIM. In: Fukuda, S., Bernard, A., Gurumoorthy, B., Bouras, A. (eds.) PLM 2014. IAICT, vol. 442, pp. 75–82. Springer, Heidelberg (2014). doi:10.​1007/​978-3-662-45937-9_​8
10.
Zurück zum Zitat Pinquié, R., Conception, L., Produits, D.: An illustrated glossary of ambiguous PLM terms used in discrete manufacturing. Int. J. Prod. Lifecycle Manag. 8, 142–171 (2015)CrossRef Pinquié, R., Conception, L., Produits, D.: An illustrated glossary of ambiguous PLM terms used in discrete manufacturing. Int. J. Prod. Lifecycle Manag. 8, 142–171 (2015)CrossRef
11.
Zurück zum Zitat Green, S.D., Fernie, S., Weller, S.: Making sense of supply chain management: a comparative study of aerospace and construction. Constr. Manag. Econ. 23, 579–593 (2005)CrossRef Green, S.D., Fernie, S., Weller, S.: Making sense of supply chain management: a comparative study of aerospace and construction. Constr. Manag. Econ. 23, 579–593 (2005)CrossRef
12.
Zurück zum Zitat Kubicki, S.: Assister la coordination flexible de l’activité de construction de bâtiments, Une approche par les modèles pour la proposition d’outils de visualisation du contexte de coopération (2006) Kubicki, S.: Assister la coordination flexible de l’activité de construction de bâtiments, Une approche par les modèles pour la proposition d’outils de visualisation du contexte de coopération (2006)
13.
Zurück zum Zitat de Blois, M., Lizarralde, G., De Coninck, P.: Iterative project processes within temporary multi-organizations in construction: the self-, eco-, re-organizing projects. Proj. Manag. J. 47, 27–44 (2016)CrossRef de Blois, M., Lizarralde, G., De Coninck, P.: Iterative project processes within temporary multi-organizations in construction: the self-, eco-, re-organizing projects. Proj. Manag. J. 47, 27–44 (2016)CrossRef
14.
Zurück zum Zitat Patrick, C.: Construction Project Planning and Scheduling. Prentice Hall, Upper Saddle River (2003) Patrick, C.: Construction Project Planning and Scheduling. Prentice Hall, Upper Saddle River (2003)
15.
Zurück zum Zitat Reefman, R.J.B., van Nederveen, S.: A controlled integral product model (IPM®) in building and construction. In: CIB W78-W102 2011: International Conference (2011) Reefman, R.J.B., van Nederveen, S.: A controlled integral product model (IPM®) in building and construction. In: CIB W78-W102 2011: International Conference (2011)
16.
Zurück zum Zitat Lebègue, E., De Almeida, R., Pinon, L.: Lascom AEC BIM Edition, un couplage BIM IFC et PLM. In: BIM & Maquette numérique pour l’architecture et la construction, Eyrolles, pp. 107–114 (2014) Lebègue, E., De Almeida, R., Pinon, L.: Lascom AEC BIM Edition, un couplage BIM IFC et PLM. In: BIM & Maquette numérique pour l’architecture et la construction, Eyrolles, pp. 107–114 (2014)
17.
Zurück zum Zitat Popov, V.: BIM/PLM bentley platform. In: Conference on Digital Construction (2014) Popov, V.: BIM/PLM bentley platform. In: Conference on Digital Construction (2014)
18.
Zurück zum Zitat Jansen-Vullers, M., van Dorp, C., Beulens, A.J.: Managing traceability information in manufacture. Int. J. Inf. Manag. 23, 395–413 (2003)CrossRef Jansen-Vullers, M., van Dorp, C., Beulens, A.J.: Managing traceability information in manufacture. Int. J. Inf. Manag. 23, 395–413 (2003)CrossRef
19.
Zurück zum Zitat Schuh, G., Rozenfeld, H., Assmus, D., Zancul, E.: Process oriented framework to support PLM implementation. Comput. Ind. 59, 210–218 (2008)CrossRef Schuh, G., Rozenfeld, H., Assmus, D., Zancul, E.: Process oriented framework to support PLM implementation. Comput. Ind. 59, 210–218 (2008)CrossRef
20.
Zurück zum Zitat Maull, R., Hughes, D., Bennett, J.: The role of the bill-of-materials as a CAD/CAPM interface and the key importance of engineering change control. Comput. Control Eng. J. 3, 63 (1992)CrossRef Maull, R., Hughes, D., Bennett, J.: The role of the bill-of-materials as a CAD/CAPM interface and the key importance of engineering change control. Comput. Control Eng. J. 3, 63 (1992)CrossRef
21.
Zurück zum Zitat Saaksvuori, A., Immonen, A.: Product Lifecycle Management. Springer, Berlin (2008)CrossRef Saaksvuori, A., Immonen, A.: Product Lifecycle Management. Springer, Berlin (2008)CrossRef
22.
Zurück zum Zitat Brière-Côté, A., Rivest, L., Desrochers, A.: Adaptive generic product structure modelling for design reuse in engineer-to-order products. Comput. Ind. 61, 53–65 (2010)CrossRef Brière-Côté, A., Rivest, L., Desrochers, A.: Adaptive generic product structure modelling for design reuse in engineer-to-order products. Comput. Ind. 61, 53–65 (2010)CrossRef
23.
Zurück zum Zitat Eynard, B., Gallet, T., Nowak, P., Roucoules, L.: UML based specifications of PDM product structure and workflow. Comput. Ind. 55, 301–316 (2004)CrossRef Eynard, B., Gallet, T., Nowak, P., Roucoules, L.: UML based specifications of PDM product structure and workflow. Comput. Ind. 55, 301–316 (2004)CrossRef
24.
Zurück zum Zitat Trappey, A.J.C., Peng, T.-K., Lin, H.-D.: An object-oriented bill of materials system for dynamic product management. J. Intell. Manuf. 7, 365–371 (1996)CrossRef Trappey, A.J.C., Peng, T.-K., Lin, H.-D.: An object-oriented bill of materials system for dynamic product management. J. Intell. Manuf. 7, 365–371 (1996)CrossRef
25.
Zurück zum Zitat Kreider, R., Messner, J.: The Uses of BIM: Classifying and Selecting BIM Uses. Pennsylvania state University, University Park (2013) Kreider, R., Messner, J.: The Uses of BIM: Classifying and Selecting BIM Uses. Pennsylvania state University, University Park (2013)
26.
Zurück zum Zitat Kreider, R., Messner, J., Dubler, C.: Determining the frequency and impact of applying BIM for different purposes on building projects. In: Proceedings of the 6th International Conference on Innovation in Architecture, Engineering and Construction (AEC), pp. 1–10 (2010) Kreider, R., Messner, J., Dubler, C.: Determining the frequency and impact of applying BIM for different purposes on building projects. In: Proceedings of the 6th International Conference on Innovation in Architecture, Engineering and Construction (AEC), pp. 1–10 (2010)
27.
Zurück zum Zitat American Institute of Architects: E202-2008 Building Information Modeling protocol exhibit (2008) American Institute of Architects: E202-2008 Building Information Modeling protocol exhibit (2008)
28.
Zurück zum Zitat Gijezen, S., Hartmann, T., Buursema, N.: Organizing 3D building information models with the help of work breakdown structures to improve the clash detection process (2009) Gijezen, S., Hartmann, T., Buursema, N.: Organizing 3D building information models with the help of work breakdown structures to improve the clash detection process (2009)
29.
Zurück zum Zitat Zhou, W., Heesom, D., Georgakis, P., Nwagboso, C., Feng, A.: An interactive approach to collaborative 4D construction planning. Electron. J. Inf. Technol. Constr. 14, 30–47 (2009) Zhou, W., Heesom, D., Georgakis, P., Nwagboso, C., Feng, A.: An interactive approach to collaborative 4D construction planning. Electron. J. Inf. Technol. Constr. 14, 30–47 (2009)
30.
Zurück zum Zitat Saluja, C.: A process mapping procedure for planning building information modeling (BIM): execution on a building construction project, pp. 1–152 (2009) Saluja, C.: A process mapping procedure for planning building information modeling (BIM): execution on a building construction project, pp. 1–152 (2009)
31.
Zurück zum Zitat Monteiro, A., Poças Martins, J.: A survey on modeling guidelines for quantity takeoff-oriented BIM-based design. Autom. Constr. 35, 238–253 (2013)CrossRef Monteiro, A., Poças Martins, J.: A survey on modeling guidelines for quantity takeoff-oriented BIM-based design. Autom. Constr. 35, 238–253 (2013)CrossRef
32.
Zurück zum Zitat Hardin, B., McCool, D.: BIM and Construction Management: Proven Tools, Methods, and Workflows, 2nd edn. Wiley, Hoboken (2015) Hardin, B., McCool, D.: BIM and Construction Management: Proven Tools, Methods, and Workflows, 2nd edn. Wiley, Hoboken (2015)
Metadaten
Titel
Comparing PLM and BIM from the Product Structure Standpoint
verfasst von
Conrad Boton
Louis Rivest
Daniel Forgues
Julie Jupp
Copyright-Jahr
2016
DOI
https://doi.org/10.1007/978-3-319-54660-5_40

Premium Partner