Skip to main content
Erschienen in: Geotechnical and Geological Engineering 3/2014

01.06.2014 | Technical note

Trench Cutter Case Histories and Their Possible Application for Offshore Piles as Relieve Drilling

verfasst von: Giovanni Spagnoli, Arthur Bi, Leonhard Weixler

Erschienen in: Geotechnical and Geological Engineering | Ausgabe 3/2014

Einloggen

Aktivieren Sie unsere intelligente Suche, um passende Fachinhalte oder Patente zu finden.

search-config
loading …

Abstract

As of 30th June 2013, according to the European Wind Energy Association, there are 1,939 offshore wind turbines, with a combined capacity of 6,040 MW. They are fully grid connected in European waters in 58 wind farms across 10 countries. About 70 % of the foundations used for wind energy are monopiles with a diameter up to 6 m. The monopiles are installed by using hammers. However, there are situations where the piles cannot be installed without the “driving and drilling technique”, above all in the glacial areas, where glacial tills, boulders or cobbles can be encountered. A new technology for supporting the installation of monopiles is the monopile-trench cutter. The following paper describes four onshore trench cutter case histories in hard geology. Based on several projects, a correlation between net cut performance and uniaxial compressive strength (UCS) values of the in situ rock is briefly described. The variation of the cut performance decreases logarithmically with increasing UCS values. However, the data showed are only based on projects already performed, and it is not possible to extrapolate the data for future projects in similar geological conditions. The findings of this paper want to show how the trench cutter technology might be a suitable technology for supporting monopile installation in difficult sea beds. Besides, the information contained in this manuscript wants to be an aid for contractors involved in offshore pile installation.

Sie haben noch keine Lizenz? Dann Informieren Sie sich jetzt über unsere Produkte:

Springer Professional "Wirtschaft+Technik"

Online-Abonnement

Mit Springer Professional "Wirtschaft+Technik" erhalten Sie Zugriff auf:

  • über 102.000 Bücher
  • über 537 Zeitschriften

aus folgenden Fachgebieten:

  • Automobil + Motoren
  • Bauwesen + Immobilien
  • Business IT + Informatik
  • Elektrotechnik + Elektronik
  • Energie + Nachhaltigkeit
  • Finance + Banking
  • Management + Führung
  • Marketing + Vertrieb
  • Maschinenbau + Werkstoffe
  • Versicherung + Risiko

Jetzt Wissensvorsprung sichern!

Springer Professional "Technik"

Online-Abonnement

Mit Springer Professional "Technik" erhalten Sie Zugriff auf:

  • über 67.000 Bücher
  • über 390 Zeitschriften

aus folgenden Fachgebieten:

  • Automobil + Motoren
  • Bauwesen + Immobilien
  • Business IT + Informatik
  • Elektrotechnik + Elektronik
  • Energie + Nachhaltigkeit
  • Maschinenbau + Werkstoffe




 

Jetzt Wissensvorsprung sichern!

Literatur
Zurück zum Zitat Beckhaus K, Schmitz S, Schwarz W (2009) Deep cut-off walls constructed under dams with trench cutters. In: Bauer E, Semprich S, Zenz G (eds) Long term behaviour of dams, LTBD09: Proceedings of the 2nd international conference, Technischen Universität Graz, pp. 294–299 Beckhaus K, Schmitz S, Schwarz W (2009) Deep cut-off walls constructed under dams with trench cutters. In: Bauer E, Semprich S, Zenz G (eds) Long term behaviour of dams, LTBD09: Proceedings of the 2nd international conference, Technischen Universität Graz, pp. 294–299
Zurück zum Zitat Bowles JE (2001) Foundation analysis and design. McGraw-Hill, New York Bowles JE (2001) Foundation analysis and design. McGraw-Hill, New York
Zurück zum Zitat Brunner W, Bi A, Chang W, Zong DF (2011) Construction of the first cut-off wall by a low headroom trench cutter inside a tunnel in China. In: Proceedings of the 31st annual USSD conference San Diego, California, pp 663–674 Brunner W, Bi A, Chang W, Zong DF (2011) Construction of the first cut-off wall by a low headroom trench cutter inside a tunnel in China. In: Proceedings of the 31st annual USSD conference San Diego, California, pp 663–674
Zurück zum Zitat Cardu M, Oreste P (2013) Productivity and working costs of modern trench-cutters for the construction of concrete diaphragms in an urban environment. Int J Min Reclam Environ. doi:10.1080/17480930.2013.795340 Cardu M, Oreste P (2013) Productivity and working costs of modern trench-cutters for the construction of concrete diaphragms in an urban environment. Int J Min Reclam Environ. doi:10.​1080/​17480930.​2013.​795340
Zurück zum Zitat Der Norske Veritas AS (2013) Design of offshore wind turbine structures. Standard DNV-OS-J101 Der Norske Veritas AS (2013) Design of offshore wind turbine structures. Standard DNV-OS-J101
Zurück zum Zitat Douglas-Westwood (2011) The world offshore wind market forecast 2012–2016. DW report Douglas-Westwood (2011) The world offshore wind market forecast 2012–2016. DW report
Zurück zum Zitat EWEA (2013a) The European offshore wind industry—key trends and statistics 1st half 2013. European Wind Energy Association EWEA (2013a) The European offshore wind industry—key trends and statistics 1st half 2013. European Wind Energy Association
Zurück zum Zitat EWEA (2013b) The European offshore wind industry—key trends and statistics 2012. European Wind Energy Association EWEA (2013b) The European offshore wind industry—key trends and statistics 2012. European Wind Energy Association
Zurück zum Zitat Kaiser MJ, Snyder BF (2012) Offshore wind energy cost modeling, green energy and technology. Springer, LondonCrossRef Kaiser MJ, Snyder BF (2012) Offshore wind energy cost modeling, green energy and technology. Springer, LondonCrossRef
Zurück zum Zitat Malhotra S (2011) Selection, design and construction of offshore wind turbine foundations. In: Al-Bahadly I (ed) Wind turbines. InTech, Vienna, pp 231–264 Malhotra S (2011) Selection, design and construction of offshore wind turbine foundations. In: Al-Bahadly I (ed) Wind turbines. InTech, Vienna, pp 231–264
Zurück zum Zitat McClelland B, Reifel MD (1986) Planning and design of fixed offshore platforms. Van Nostrand Reinhold Company, New York McClelland B, Reifel MD (1986) Planning and design of fixed offshore platforms. Van Nostrand Reinhold Company, New York
Zurück zum Zitat Randolph M, Cassidy M, Gourvenec S, Erbrich C (2005) Challenges of offshore geotechnical engineering. In: Proceedings of the international conference on soil mechanics and geotechnical engineering, Osaka, Japan, A. A. Balkema Publishers, vol 1, pp. 123–176 Randolph M, Cassidy M, Gourvenec S, Erbrich C (2005) Challenges of offshore geotechnical engineering. In: Proceedings of the international conference on soil mechanics and geotechnical engineering, Osaka, Japan, A. A. Balkema Publishers, vol 1, pp. 123–176
Zurück zum Zitat Spagnoli G, Weixler L (2013a) Alternative offshore foundation installation methods. In: Proceedings of the offshore technology conference, OTC 23962. doi:10.4043/23962-MS Spagnoli G, Weixler L (2013a) Alternative offshore foundation installation methods. In: Proceedings of the offshore technology conference, OTC 23962. doi:10.​4043/​23962-MS
Zurück zum Zitat Spagnoli G, Weixler L (2013b) Support for offshore monopile installation through the trench cutter technology. Trans R Inst Nav Archit Part A 155:131–140 Spagnoli G, Weixler L (2013b) Support for offshore monopile installation through the trench cutter technology. Trans R Inst Nav Archit Part A 155:131–140
Zurück zum Zitat Spagnoli G, Weixler L, Finkenzeller S (2013) Drilling tools for installation of offshore wind foundations. Sea Technol 54:47–49 Spagnoli G, Weixler L, Finkenzeller S (2013) Drilling tools for installation of offshore wind foundations. Sea Technol 54:47–49
Zurück zum Zitat Stevens RS, Edward A, Turton TH (1982) Evaluating pile drivability for hard clay, very dense sand, and rock. In: Proceedings of the offshore technology conference, OTC 4205 Stevens RS, Edward A, Turton TH (1982) Evaluating pile drivability for hard clay, very dense sand, and rock. In: Proceedings of the offshore technology conference, OTC 4205
Zurück zum Zitat Strandgaard T, Vandenbulcke L (2002) Driving mono-piles into glacial till. IBC’s Wind Power Europe Strandgaard T, Vandenbulcke L (2002) Driving mono-piles into glacial till. IBC’s Wind Power Europe
Zurück zum Zitat Tomlinson M, Woodward J (2007) Pile design and construction practice, 5th edn. CRC Press, Boca Raton Tomlinson M, Woodward J (2007) Pile design and construction practice, 5th edn. CRC Press, Boca Raton
Zurück zum Zitat Weltman AJ, Healy PR (1978) Piling in boulder clay and other glacial tills. Construction Industry Research & Information Association (CIRIA), London Weltman AJ, Healy PR (1978) Piling in boulder clay and other glacial tills. Construction Industry Research & Information Association (CIRIA), London
Metadaten
Titel
Trench Cutter Case Histories and Their Possible Application for Offshore Piles as Relieve Drilling
verfasst von
Giovanni Spagnoli
Arthur Bi
Leonhard Weixler
Publikationsdatum
01.06.2014
Verlag
Springer International Publishing
Erschienen in
Geotechnical and Geological Engineering / Ausgabe 3/2014
Print ISSN: 0960-3182
Elektronische ISSN: 1573-1529
DOI
https://doi.org/10.1007/s10706-014-9747-6

Weitere Artikel der Ausgabe 3/2014

Geotechnical and Geological Engineering 3/2014 Zur Ausgabe

Acknowledgments

Acknowledgement