Skip to main content
Top

2017 | OriginalPaper | Chapter

A New Approach to Predicting Reliable Project Runtimes via Probabilistic Model Checking

Authors : Ulrich Vogl, Markus Siegle

Published in: Computer Performance Engineering

Publisher: Springer International Publishing

Activate our intelligent search to find suitable subject content or patents.

search-config
loading …

Abstract

For more than five decades, efforts of calculating exact probabilistic quantiles for generally distributed project runtimes have not been successful due to the tremendous computation requirements, paired with hard restrictions on the available computation power. The methods established today are PERT (Program Evaluation and Review Technique) and CCPM (Critical Chain Project Management). They make simplifying assumptions by focusing on the critical path (PERT) or estimating appropriate buffers (CCPM). In view of this, and since today’s machines offer an increased computation power, we have developed a new approach: For the calculation of more exact quantiles or – reversely – of the resulting buffer sizes, we combine the capabilities of classical reduction techniques for series-parallel structures with the capabilities of probabilistic model checking. In order to avoid the state space explosion problem, we propose a heuristic algorithm.

Dont have a licence yet? Then find out more about our products and how to get one now:

Springer Professional "Wirtschaft+Technik"

Online-Abonnement

Mit Springer Professional "Wirtschaft+Technik" erhalten Sie Zugriff auf:

  • über 102.000 Bücher
  • über 537 Zeitschriften

aus folgenden Fachgebieten:

  • Automobil + Motoren
  • Bauwesen + Immobilien
  • Business IT + Informatik
  • Elektrotechnik + Elektronik
  • Energie + Nachhaltigkeit
  • Finance + Banking
  • Management + Führung
  • Marketing + Vertrieb
  • Maschinenbau + Werkstoffe
  • Versicherung + Risiko

Jetzt Wissensvorsprung sichern!

Springer Professional "Technik"

Online-Abonnement

Mit Springer Professional "Technik" erhalten Sie Zugriff auf:

  • über 67.000 Bücher
  • über 390 Zeitschriften

aus folgenden Fachgebieten:

  • Automobil + Motoren
  • Bauwesen + Immobilien
  • Business IT + Informatik
  • Elektrotechnik + Elektronik
  • Energie + Nachhaltigkeit
  • Maschinenbau + Werkstoffe




 

Jetzt Wissensvorsprung sichern!

Springer Professional "Wirtschaft"

Online-Abonnement

Mit Springer Professional "Wirtschaft" erhalten Sie Zugriff auf:

  • über 67.000 Bücher
  • über 340 Zeitschriften

aus folgenden Fachgebieten:

  • Bauwesen + Immobilien
  • Business IT + Informatik
  • Finance + Banking
  • Management + Führung
  • Marketing + Vertrieb
  • Versicherung + Risiko




Jetzt Wissensvorsprung sichern!

Literature
1.
3.
go back to reference Dilmaghani, F.: Critical chain project management (CCPM) at Bosch Security Systems (CCTV) Eindhoven. Masters Thesis, University of Twente (2008) Dilmaghani, F.: Critical chain project management (CCPM) at Bosch Security Systems (CCTV) Eindhoven. Masters Thesis, University of Twente (2008)
4.
go back to reference Goldratt, E.M.: Critical Chain. The North River Press Publishing Corporation, Great Barrington (1997) Goldratt, E.M.: Critical Chain. The North River Press Publishing Corporation, Great Barrington (1997)
5.
go back to reference Kapici, S.: A stochastic risk model for complex projects (Dissertation) Otto-von-Guericke-Universität, Magdeburg (2005) Kapici, S.: A stochastic risk model for complex projects (Dissertation) Otto-von-Guericke-Universität, Magdeburg (2005)
6.
go back to reference Klar, R., et al.: Messung und Modellierung Paralleler und Verteilter Rechensysteme. B.G. Teubner, Stuttgart (1995)CrossRef Klar, R., et al.: Messung und Modellierung Paralleler und Verteilter Rechensysteme. B.G. Teubner, Stuttgart (1995)CrossRef
10.
go back to reference Melchiors, P., Kolisch, R.: Scheduling of multiple R&D projects in a dynamic and stochastic environment. In: Fleischmann, B., et al. (eds.) Operations Research Proceedings 2008, pp. 135–140. Springer, Heidelberg (2007). doi:10.1007/978-3-642-00142-0_22 Melchiors, P., Kolisch, R.: Scheduling of multiple R&D projects in a dynamic and stochastic environment. In: Fleischmann, B., et al. (eds.) Operations Research Proceedings 2008, pp. 135–140. Springer, Heidelberg (2007). doi:10.​1007/​978-3-642-00142-0_​22
13.
go back to reference Shtub, A., et al.: Project Management: Processes, Methodologies and Economics, 2nd edn. Pearson Education Limited, Essex (2014) Shtub, A., et al.: Project Management: Processes, Methodologies and Economics, 2nd edn. Pearson Education Limited, Essex (2014)
Metadata
Title
A New Approach to Predicting Reliable Project Runtimes via Probabilistic Model Checking
Authors
Ulrich Vogl
Markus Siegle
Copyright Year
2017
DOI
https://doi.org/10.1007/978-3-319-66583-2_8