Skip to main content
Top

2020 | OriginalPaper | Chapter

A Problem Specific Genetic Algorithm for Disassembly Planning and Scheduling Considering Process Plan Flexibility and Parallel Operations

Activate our intelligent search to find suitable subject content or patents.

search-config
loading …

Abstract

Increased awareness of resource scarcity and man-made pollution has driven consumers and manufacturers to reflect ways how to deal with end-of-life products and exploit their remaining value. The options of repair, remanufacturing or recycling each require at least partial disassembly of the structure with the variety of feasible process plans and large number of emerging parts and sub-assemblies generally making for a challenging optimization problem. Its complexity is further accentuated by considering divergent process flows which result from multiple parts or sub-assemblies that are released in the course of disassembly. In a previous study, it was shown that exact solution using an and/or graph based mixed integer linear program (MILP) was only practical for smaller problem instances. Consequently, a meta-heuristic approach is now taken to enable solution of large size problems. This study presents a genetic algorithm (GA) along with a problem specific representation to address both the scheduling and process planning aspect while allowing for parallel execution of certain disassembly tasks. Performance analysis with artificial test data shows that the proposed GA is capable of producing good quality solutions in reasonable time and bridging the gap regarding application to large scale problems as compared to the existing MILP formulation.

Dont have a licence yet? Then find out more about our products and how to get one now:

Springer Professional "Wirtschaft+Technik"

Online-Abonnement

Mit Springer Professional "Wirtschaft+Technik" erhalten Sie Zugriff auf:

  • über 102.000 Bücher
  • über 537 Zeitschriften

aus folgenden Fachgebieten:

  • Automobil + Motoren
  • Bauwesen + Immobilien
  • Business IT + Informatik
  • Elektrotechnik + Elektronik
  • Energie + Nachhaltigkeit
  • Finance + Banking
  • Management + Führung
  • Marketing + Vertrieb
  • Maschinenbau + Werkstoffe
  • Versicherung + Risiko

Jetzt Wissensvorsprung sichern!

Springer Professional "Wirtschaft"

Online-Abonnement

Mit Springer Professional "Wirtschaft" erhalten Sie Zugriff auf:

  • über 67.000 Bücher
  • über 340 Zeitschriften

aus folgenden Fachgebieten:

  • Bauwesen + Immobilien
  • Business IT + Informatik
  • Finance + Banking
  • Management + Führung
  • Marketing + Vertrieb
  • Versicherung + Risiko




Jetzt Wissensvorsprung sichern!

Literature
1.
go back to reference Zhang, R., Ong, S.K, Nee, A.Y.: A simulation-based genetic algorithm approach for remanufacturing process planning and scheduling. In: Applied Soft Computing, vol. 37, pp. 521–532 (2015) Zhang, R., Ong, S.K, Nee, A.Y.: A simulation-based genetic algorithm approach for remanufacturing process planning and scheduling. In: Applied Soft Computing, vol. 37, pp. 521–532 (2015)
2.
go back to reference Gong, G., Deng, Q., Chiong, R., Gong, X., Huang, H., Han, W.: Remanufacturing-oriented process planning and scheduling: mathematical modelling and evolutionary optimisation. Int. J. Prod. Res. 58(12), 3781–3799 (2020) Gong, G., Deng, Q., Chiong, R., Gong, X., Huang, H., Han, W.: Remanufacturing-oriented process planning and scheduling: mathematical modelling and evolutionary optimisation. Int. J. Prod. Res. 58(12), 3781–3799 (2020)
3.
go back to reference Özgüven, C., Özbakır, L., Yavuz, Y.: Mathematical models for job-shop scheduling problems with routing and process plan flexibility. Appl. Math. Model. 34(6), 1539–1548 (2010) Özgüven, C., Özbakır, L., Yavuz, Y.: Mathematical models for job-shop scheduling problems with routing and process plan flexibility. Appl. Math. Model. 34(6), 1539–1548 (2010)
4.
go back to reference Amin-Naseri, M.R., Afshari, A.J.: A hybrid genetic algorithm for integrated process planning and scheduling problem with precedence constraints. Int. J. Adv. Manuf. Technol. 59(1–4), 273–287 (2012) Amin-Naseri, M.R., Afshari, A.J.: A hybrid genetic algorithm for integrated process planning and scheduling problem with precedence constraints. Int. J. Adv. Manuf. Technol. 59(1–4), 273–287 (2012)
5.
go back to reference Gaudreault, J., Frayret, J.M., Rousseau, A., D’Amours, S.: Combined planning and scheduling in a divergent production system with co-production: a case study in the lumber industry. Comput. Oper. Res. 38(9), 1238–1250 (2011) Gaudreault, J., Frayret, J.M., Rousseau, A., D’Amours, S.: Combined planning and scheduling in a divergent production system with co-production: a case study in the lumber industry. Comput. Oper. Res. 38(9), 1238–1250 (2011)
6.
go back to reference Ehm, F.: Machine scheduling for multi-product disassembly. In: Operations Research Proceedings 2016, pp. 507–513. Springer, Cham (2018) Ehm, F.: Machine scheduling for multi-product disassembly. In: Operations Research Proceedings 2016, pp. 507–513. Springer, Cham (2018)
7.
go back to reference Ehm, F.: A data-driven modeling approach for integrated disassembly planning and scheduling. J. Remanuf. 9(2), 89–107 (2019) Ehm, F.: A data-driven modeling approach for integrated disassembly planning and scheduling. J. Remanuf. 9(2), 89–107 (2019)
Metadata
Title
A Problem Specific Genetic Algorithm for Disassembly Planning and Scheduling Considering Process Plan Flexibility and Parallel Operations
Author
Franz Ehm
Copyright Year
2020
DOI
https://doi.org/10.1007/978-3-030-48439-2_73

Premium Partner