Skip to main content
Top

2013 | OriginalPaper | Chapter

68. A Sequencing Problem for a Mixed-Model Assembly Line on Supply Chain Management

Authors : Shusaku Hiraki, Zhuqi Xu, Shaolan Yang, Hugejile

Published in: LTLGB 2012

Publisher: Springer Berlin Heidelberg

Activate our intelligent search to find suitable subject content or patents.

search-config
loading …

Abstract

The sequencing problem for mixed-model assembly has a direct influence on the parts supply chain, production logistics and mobile sale logistics; it is also one of the key factors to design and organize low-carbon model logistics. The model in this paper assumed that the parts is supplied in JIT and assembled into products in a mixed-model line. A part of the products are transported to the distributor directly by car-carrier after production. In this circumstance, the essay proposes a new sequencing method on mixed-model assembly line, which considers keeping a constant speed in consuming each part in the line, leveling the load on each process within the line, and the products transportation planning above-mentioned. At last an example is given to illustrate the characteristics and effectiveness of the method in the paper.

Dont have a licence yet? Then find out more about our products and how to get one now:

Springer Professional "Wirtschaft+Technik"

Online-Abonnement

Mit Springer Professional "Wirtschaft+Technik" erhalten Sie Zugriff auf:

  • über 102.000 Bücher
  • über 537 Zeitschriften

aus folgenden Fachgebieten:

  • Automobil + Motoren
  • Bauwesen + Immobilien
  • Business IT + Informatik
  • Elektrotechnik + Elektronik
  • Energie + Nachhaltigkeit
  • Finance + Banking
  • Management + Führung
  • Marketing + Vertrieb
  • Maschinenbau + Werkstoffe
  • Versicherung + Risiko

Jetzt Wissensvorsprung sichern!

Springer Professional "Wirtschaft"

Online-Abonnement

Mit Springer Professional "Wirtschaft" erhalten Sie Zugriff auf:

  • über 67.000 Bücher
  • über 340 Zeitschriften

aus folgenden Fachgebieten:

  • Bauwesen + Immobilien
  • Business IT + Informatik
  • Finance + Banking
  • Management + Führung
  • Marketing + Vertrieb
  • Versicherung + Risiko




Jetzt Wissensvorsprung sichern!

Literature
go back to reference Bard JF, Dar-e1 E, Shtub A (1992) An analytic. Framework for sequencing mixed model assembly. Int J Prod Res 30(1):35–48CrossRef Bard JF, Dar-e1 E, Shtub A (1992) An analytic. Framework for sequencing mixed model assembly. Int J Prod Res 30(1):35–48CrossRef
go back to reference Bard JF, Shtub A, Joshi SB (1994) Sequencing mixed-model assembly lines to level parts usage and minimizing line length. Int J Prod Res 32(10):2431–2454CrossRef Bard JF, Shtub A, Joshi SB (1994) Sequencing mixed-model assembly lines to level parts usage and minimizing line length. Int J Prod Res 32(10):2431–2454CrossRef
go back to reference Cakir A, Inman RR (1993) Modified goal chasing for products with non-zero/one bills of materials. Int J Prod Res 31(1):107–115CrossRef Cakir A, Inman RR (1993) Modified goal chasing for products with non-zero/one bills of materials. Int J Prod Res 31(1):107–115CrossRef
go back to reference Huge J, Hiraki S, Jia C (2011) International conference on information technology. Serv Sci Eng Manag 3(26–28):1539–1542 Huge J, Hiraki S, Jia C (2011) International conference on information technology. Serv Sci Eng Manag 3(26–28):1539–1542
go back to reference Inman RR, Bulfin RL (1991) Manage. Science 37(7):901–904 Inman RR, Bulfin RL (1991) Manage. Science 37(7):901–904
go back to reference Kotani S, Ito T, Ohno K (2004) Sequencing problem for a mixed-model assembly line in the Toyota production system. Int J Prod Res 42(23):4955–4974CrossRef Kotani S, Ito T, Ohno K (2004) Sequencing problem for a mixed-model assembly line in the Toyota production system. Int J Prod Res 42(23):4955–4974CrossRef
go back to reference Kurashige K, Yanagawa Y, Miyazaki S, Kameyama Y (2002) Production and operations management. Prod Plan Contr 13(8):735–745CrossRef Kurashige K, Yanagawa Y, Miyazaki S, Kameyama Y (2002) Production and operations management. Prod Plan Contr 13(8):735–745CrossRef
go back to reference Miltenburg J (1989) Manage. Science 35(2):192–207 Miltenburg J (1989) Manage. Science 35(2):192–207
go back to reference Miltenburg J, Goldstein T (1991) Developing production schedules which balance part usage and smooth production loads in just-in-time production systems. Nav Res Log 38(6):893–910 Miltenburg J, Goldstein T (1991) Developing production schedules which balance part usage and smooth production loads in just-in-time production systems. Nav Res Log 38(6):893–910
go back to reference Okamura K, Yamashina H (1979) Parametric appraisal of the JIT systems. Int J Prod Res 17(3):233–247CrossRef Okamura K, Yamashina H (1979) Parametric appraisal of the JIT systems. Int J Prod Res 17(3):233–247CrossRef
go back to reference Thomopoulos NT (1967) Manage. Science 14(2):B59–B75 Thomopoulos NT (1967) Manage. Science 14(2):B59–B75
go back to reference Tsai LH (1995) Manage. Science 41(3):485–495 Tsai LH (1995) Manage. Science 41(3):485–495
go back to reference Xu Z, Hiraki S (1996) Japan industrial management association, vol 46(6). pp 614–622 Xu Z, Hiraki S (1996) Japan industrial management association, vol 46(6). pp 614–622
Metadata
Title
A Sequencing Problem for a Mixed-Model Assembly Line on Supply Chain Management
Authors
Shusaku Hiraki
Zhuqi Xu
Shaolan Yang
Hugejile
Copyright Year
2013
Publisher
Springer Berlin Heidelberg
DOI
https://doi.org/10.1007/978-3-642-34651-4_68