Skip to main content
Top

2018 | OriginalPaper | Chapter

A-Team Solving Distributed Resource-Constrained Multi-project Scheduling Problem

Authors : Piotr Jedrzejowicz, Ewa Ratajczak-Ropel

Published in: Computational Collective Intelligence

Publisher: Springer International Publishing

Activate our intelligent search to find suitable subject content or patents.

search-config
loading …

Abstract

In this paper a multi-agent system based on the A-Team concept is proposed to solve the distributed resource-constrained multi-project scheduling problem (DRCMPSP). The DRCMPSP belongs to the class of the strongly NP-hard optimisation problems. In the DRCMPSP multiple distributed projects are considered, hence, a coordination of the shared decisions is needed as well as the local task schedule for each project. Multi-agent systems are the natural way of solving such problems. The proposed A-Team multi-agent system has been built using the JABAT environment where two types of the optimisation agents are involved: local and global. Local agents are used to find solutions for the local projects, and global agents are responsible for coordination of the local projects and hence, for the global solution. The approach has been tested experimentally using 140 benchmark problem instances from MPSPLIB with the average project delay (APD) as optimisation criterion.

Dont have a licence yet? Then find out more about our products and how to get one now:

Springer Professional "Wirtschaft+Technik"

Online-Abonnement

Mit Springer Professional "Wirtschaft+Technik" erhalten Sie Zugriff auf:

  • über 102.000 Bücher
  • über 537 Zeitschriften

aus folgenden Fachgebieten:

  • Automobil + Motoren
  • Bauwesen + Immobilien
  • Business IT + Informatik
  • Elektrotechnik + Elektronik
  • Energie + Nachhaltigkeit
  • Finance + Banking
  • Management + Führung
  • Marketing + Vertrieb
  • Maschinenbau + Werkstoffe
  • Versicherung + Risiko

Jetzt Wissensvorsprung sichern!

Springer Professional "Technik"

Online-Abonnement

Mit Springer Professional "Technik" erhalten Sie Zugriff auf:

  • über 67.000 Bücher
  • über 390 Zeitschriften

aus folgenden Fachgebieten:

  • Automobil + Motoren
  • Bauwesen + Immobilien
  • Business IT + Informatik
  • Elektrotechnik + Elektronik
  • Energie + Nachhaltigkeit
  • Maschinenbau + Werkstoffe




 

Jetzt Wissensvorsprung sichern!

Springer Professional "Wirtschaft"

Online-Abonnement

Mit Springer Professional "Wirtschaft" erhalten Sie Zugriff auf:

  • über 67.000 Bücher
  • über 340 Zeitschriften

aus folgenden Fachgebieten:

  • Bauwesen + Immobilien
  • Business IT + Informatik
  • Finance + Banking
  • Management + Führung
  • Marketing + Vertrieb
  • Versicherung + Risiko




Jetzt Wissensvorsprung sichern!

Literature
2.
go back to reference Barbucha, D., Czarnowski, I., Jędrzejowicz, P., Ratajczak-Ropel, E., Wierzbowska, I.: E-JABAT - an implementation of the web-based A-team. In: Nguyen, N.T., Jain, L.C. (eds.) Intelligent Agents in the Evolution of Web and Applications. SCI, vol. 167, pp. 57–86. Springer, Heilderberg (2009). https://doi.org/10.1007/978-3-540-88071-4_4CrossRef Barbucha, D., Czarnowski, I., Jędrzejowicz, P., Ratajczak-Ropel, E., Wierzbowska, I.: E-JABAT - an implementation of the web-based A-team. In: Nguyen, N.T., Jain, L.C. (eds.) Intelligent Agents in the Evolution of Web and Applications. SCI, vol. 167, pp. 57–86. Springer, Heilderberg (2009). https://​doi.​org/​10.​1007/​978-3-540-88071-4_​4CrossRef
3.
go back to reference Barbucha, D., Czarnowski, I., Jędrzejowicz, P., Ratajczak-Ropel, E., Wierzbowska, I.: Influence of the working strategy on A-team performance. In: Szczerbicki, E., Nguyen, N.T. (eds.) Smart Information and Knowledge Management. SCI, vol. 260, pp. 83–102. Springer, Heidelberg (2010). https://doi.org/10.1007/978-3-642-04584-4_4CrossRef Barbucha, D., Czarnowski, I., Jędrzejowicz, P., Ratajczak-Ropel, E., Wierzbowska, I.: Influence of the working strategy on A-team performance. In: Szczerbicki, E., Nguyen, N.T. (eds.) Smart Information and Knowledge Management. SCI, vol. 260, pp. 83–102. Springer, Heidelberg (2010). https://​doi.​org/​10.​1007/​978-3-642-04584-4_​4CrossRef
4.
go back to reference Bellifemine, F., Caire, G., Poggi, A., Rimassa, G.: JADE. A White Paper, Exp. 3(3), 6–20 (2003) Bellifemine, F., Caire, G., Poggi, A., Rimassa, G.: JADE. A White Paper, Exp. 3(3), 6–20 (2003)
5.
go back to reference Bellifemine, F., Caire, G., Greenwood, D.: Developing Multi-agent Systems with JADE. Wiley, Chichester (2007)CrossRef Bellifemine, F., Caire, G., Greenwood, D.: Developing Multi-agent Systems with JADE. Wiley, Chichester (2007)CrossRef
8.
go back to reference Confessore, G., Giordani, S., Rismondo, S.: An auction based approach in decentralized project scheduling. In: Proceedings of PMS 2002 - International Workshop on Project Management and Scheduling, Valencia, pp. 110–113 (2002) Confessore, G., Giordani, S., Rismondo, S.: An auction based approach in decentralized project scheduling. In: Proceedings of PMS 2002 - International Workshop on Project Management and Scheduling, Valencia, pp. 110–113 (2002)
10.
go back to reference Homberger, J.: A multi-agent system for the decentralized resource-constrained multi-project scheduling problem. Int. Trans. Oper. Res. 14(6), 565–589 (2007)CrossRef Homberger, J.: A multi-agent system for the decentralized resource-constrained multi-project scheduling problem. Int. Trans. Oper. Res. 14(6), 565–589 (2007)CrossRef
13.
go back to reference Jędrzejowicz, P., Ratajczak-Ropel, E.: New generation a-team for solving the resource constrained project scheduling. In: Proceedings of the Eleventh International Workshop on Project Management and Scheduling, Istanbul, pp. 156–159 (2008) Jędrzejowicz, P., Ratajczak-Ropel, E.: New generation a-team for solving the resource constrained project scheduling. In: Proceedings of the Eleventh International Workshop on Project Management and Scheduling, Istanbul, pp. 156–159 (2008)
17.
go back to reference Ratajczak-Ropel, E.: Agent-based approach to the single and multi-mode resource-constrained project scheduling. In: Kacprzyk, J. (ed.) Population-Based Approaches to the Resource-Constrained and Discrete-Continuous Scheduling. SSDC, vol. 108, pp. 1–100. Springer, Heidelberg (2018). https://doi.org/10.1007/978-3-319-62893-6CrossRef Ratajczak-Ropel, E.: Agent-based approach to the single and multi-mode resource-constrained project scheduling. In: Kacprzyk, J. (ed.) Population-Based Approaches to the Resource-Constrained and Discrete-Continuous Scheduling. SSDC, vol. 108, pp. 1–100. Springer, Heidelberg (2018). https://​doi.​org/​10.​1007/​978-3-319-62893-6CrossRef
18.
go back to reference Song, W., Kang, D., Zhang, J., Xi, H.: Decentralized multi-project scheduling via multi-unit combinatorial auction. In: Proceedings of the 2016 International Conference on Autonomous Agents and Multiagent Systems, pp. 836–844. International Foundation for Autonomous Agents and Multiagent Systems, Singapore (2016) Song, W., Kang, D., Zhang, J., Xi, H.: Decentralized multi-project scheduling via multi-unit combinatorial auction. In: Proceedings of the 2016 International Conference on Autonomous Agents and Multiagent Systems, pp. 836–844. International Foundation for Autonomous Agents and Multiagent Systems, Singapore (2016)
19.
go back to reference Talukdar S., Baerentzen L., Gove A., De Souza P.: Asynchronous teams: co-operation schemes for autonomous, computer-based agents. Technical report EDRC 18–59-96, Carnegie Mellon University, Pittsburgh (1996) Talukdar S., Baerentzen L., Gove A., De Souza P.: Asynchronous teams: co-operation schemes for autonomous, computer-based agents. Technical report EDRC 18–59-96, Carnegie Mellon University, Pittsburgh (1996)
20.
go back to reference Zheng, Z., Guo, Z., Zhu, Y., Zhang, X.: A critical chains based distributed multi-project scheduling approach. Neurocomputing 143(16), 282–293 (2014)CrossRef Zheng, Z., Guo, Z., Zhu, Y., Zhang, X.: A critical chains based distributed multi-project scheduling approach. Neurocomputing 143(16), 282–293 (2014)CrossRef
Metadata
Title
A-Team Solving Distributed Resource-Constrained Multi-project Scheduling Problem
Authors
Piotr Jedrzejowicz
Ewa Ratajczak-Ropel
Copyright Year
2018
DOI
https://doi.org/10.1007/978-3-319-98446-9_23

Premium Partner