Skip to main content
Top
Published in: Optimization and Engineering 4/2023

28-02-2023 | Research Article

An optimization model for the real-time truck dispatching problem in open-pit mining operations

Authors: Hossein Mirzaei-Nasirabad, Mehrnaz Mohtasham, Hooman Askari-Nasab, Behrooz Alizadeh

Published in: Optimization and Engineering | Issue 4/2023

Log in

Activate our intelligent search to find suitable subject content or patents.

search-config
loading …

Abstract

This work is concerned with the real-time truck dispatching problem in open-pit mining operations. The proposed methodology is built on a multi-stage dispatching approach to optimize the truck-shovel material handling systems. The procedure consists of two main stages: allocation planning and dynamic allocation. At first, a scenario-based method is presented to estimate the optimal size of trucks in the mining operation. Then, a novel multi-objective mathematical model for solving the problem of dynamically allocating trucks is presented, aiming at minimizing fleet waiting times and deviations from the path production requirements established by the allocation planning. To evaluate the performance of the proposed model, three different heuristic methods, including criteria of minimizing shovel idle time, minimizing ratio variance, and minimizing the deviation from the allocation planning, are developed. Afterward, the dispatching methods are tested by building a discrete-event simulation of a copper ore mine case study to compare the results. The findings suggest that the multi-objective model developed in this paper has a great potential to meet the production requirements of the operation compared to the heuristic algorithms.

Dont have a licence yet? Then find out more about our products and how to get one now:

Springer Professional "Wirtschaft+Technik"

Online-Abonnement

Mit Springer Professional "Wirtschaft+Technik" erhalten Sie Zugriff auf:

  • über 102.000 Bücher
  • über 537 Zeitschriften

aus folgenden Fachgebieten:

  • Automobil + Motoren
  • Bauwesen + Immobilien
  • Business IT + Informatik
  • Elektrotechnik + Elektronik
  • Energie + Nachhaltigkeit
  • Finance + Banking
  • Management + Führung
  • Marketing + Vertrieb
  • Maschinenbau + Werkstoffe
  • Versicherung + Risiko

Jetzt Wissensvorsprung sichern!

Springer Professional "Technik"

Online-Abonnement

Mit Springer Professional "Technik" erhalten Sie Zugriff auf:

  • über 67.000 Bücher
  • über 390 Zeitschriften

aus folgenden Fachgebieten:

  • Automobil + Motoren
  • Bauwesen + Immobilien
  • Business IT + Informatik
  • Elektrotechnik + Elektronik
  • Energie + Nachhaltigkeit
  • Maschinenbau + Werkstoffe




 

Jetzt Wissensvorsprung sichern!

Literature
go back to reference Ahangaran DK, Yasrebi AB, Wetherelt A, Foster P (2012) Real-time dispatching modelling for trucks with different capacities in open pit mines. ARCH Min Sci 57(1):39–52 Ahangaran DK, Yasrebi AB, Wetherelt A, Foster P (2012) Real-time dispatching modelling for trucks with different capacities in open pit mines. ARCH Min Sci 57(1):39–52
go back to reference Ahumada GI, Riveros E, Herzog O (2020) An agent-based system for truck dispatching in open-pit mines. In: ICAART (1) (2020), pp 73–81 Ahumada GI, Riveros E, Herzog O (2020) An agent-based system for truck dispatching in open-pit mines. In: ICAART (1) (2020), pp 73–81
go back to reference Alarie S, Gamache M (2002) Overview of solution strategies used in truck dispatching systems for open pit mines. Int J Surf Min Reclam Environ 16(1):59–76CrossRef Alarie S, Gamache M (2002) Overview of solution strategies used in truck dispatching systems for open pit mines. Int J Surf Min Reclam Environ 16(1):59–76CrossRef
go back to reference Alexandre RF, Campelo F, Vasconcelos JA (2019) Multi-objective evolutionary algorithms for the truck dispatch problem in open-pit mining operations. Learn Nonlin Model 17(2):53–66CrossRef Alexandre RF, Campelo F, Vasconcelos JA (2019) Multi-objective evolutionary algorithms for the truck dispatch problem in open-pit mining operations. Learn Nonlin Model 17(2):53–66CrossRef
go back to reference Arelovich A, Masson F, Agamennoni O, Worrall S, Nebot E (2010) Heuristic rule for truck dispatching in open-pit mines with local information-based decisions. In: 13th International IEEE conference on intelligent transportation systems, Funchal, p.1408–1414 Arelovich A, Masson F, Agamennoni O, Worrall S, Nebot E (2010) Heuristic rule for truck dispatching in open-pit mines with local information-based decisions. In: 13th International IEEE conference on intelligent transportation systems, Funchal, p.1408–1414
go back to reference Ataeepour N, Baafi EY (1999) ARENA simulation model for truck-shovel operation in despatching and non-despatching modes. Int J Surf Min Reclam Environ 13(3):125–129CrossRef Ataeepour N, Baafi EY (1999) ARENA simulation model for truck-shovel operation in despatching and non-despatching modes. Int J Surf Min Reclam Environ 13(3):125–129CrossRef
go back to reference Bajany D, Xia X, Zhang L (2017) A MILP model for truck shovel scheduling to minimize fuel consumption. Energy Procedia 105:2739–2745CrossRef Bajany D, Xia X, Zhang L (2017) A MILP model for truck shovel scheduling to minimize fuel consumption. Energy Procedia 105:2739–2745CrossRef
go back to reference Bakhtavar E, Mahmoudi H (2020) Development of a scenario-based robust model for the optimal truck-shovel allocation in open-pit mining. Comput Oper Res 115:1–10MATHCrossRef Bakhtavar E, Mahmoudi H (2020) Development of a scenario-based robust model for the optimal truck-shovel allocation in open-pit mining. Comput Oper Res 115:1–10MATHCrossRef
go back to reference Bastos GS (2013) Decision making applied to shift change in stochastic open-pit mining truck dispatching. IFAC Proc 46(16):34–39 Bastos GS (2013) Decision making applied to shift change in stochastic open-pit mining truck dispatching. IFAC Proc 46(16):34–39
go back to reference Both C, Dimitrakopoulos R (2020) Joint stochastic shortterm production scheduling and fleet management optimization for mining complexes. Optim Eng 21(4):1–27MathSciNetCrossRef Both C, Dimitrakopoulos R (2020) Joint stochastic shortterm production scheduling and fleet management optimization for mining complexes. Optim Eng 21(4):1–27MathSciNetCrossRef
go back to reference Chatterjee P, Brake D (1981) Truck dispatching and simulation methods in open-pit operations. CIM Bull (Canada) 74(835):102–107 Chatterjee P, Brake D (1981) Truck dispatching and simulation methods in open-pit operations. CIM Bull (Canada) 74(835):102–107
go back to reference Cox W, French T, Reynolds M, While L (2017) A genetic algorithm for truck dispatching in mining. In: GCAI. October, pp 93–106 Cox W, French T, Reynolds M, While L (2017) A genetic algorithm for truck dispatching in mining. In: GCAI. October, pp 93–106
go back to reference Dumakor N, Temeng V, Bansah K (2017) Optimising shovel-truck fuel consumption using stochastic simulation. Ghana Min J 17(2):39–49CrossRef Dumakor N, Temeng V, Bansah K (2017) Optimising shovel-truck fuel consumption using stochastic simulation. Ghana Min J 17(2):39–49CrossRef
go back to reference Eivazy H, Askari-Nasab H (2012) A mixed integer linear programming model for short-term open pit mine production scheduling. Min Technol 121(2):97–108CrossRef Eivazy H, Askari-Nasab H (2012) A mixed integer linear programming model for short-term open pit mine production scheduling. Min Technol 121(2):97–108CrossRef
go back to reference Elbrond J, Soumis F (1987) Towards integrated production planning and truck dispatching in open pit mines. Int J Surf Min Reclam Environ 1(1):1–6CrossRef Elbrond J, Soumis F (1987) Towards integrated production planning and truck dispatching in open pit mines. Int J Surf Min Reclam Environ 1(1):1–6CrossRef
go back to reference Forsman B, Rönnkvist E, Vagenas N (1993) Truck dispatch computer simulation in Aitik open pit mine. Int J Surf Min Reclam Environ 7(3):117–120CrossRef Forsman B, Rönnkvist E, Vagenas N (1993) Truck dispatch computer simulation in Aitik open pit mine. Int J Surf Min Reclam Environ 7(3):117–120CrossRef
go back to reference Gurgur CZ, Dagdelen K, Artittong S (2011) Optimization of a real-time multi-period truck dispatching system in mining operations. Int J Appl Decision Sci 4(1):57–79CrossRef Gurgur CZ, Dagdelen K, Artittong S (2011) Optimization of a real-time multi-period truck dispatching system in mining operations. Int J Appl Decision Sci 4(1):57–79CrossRef
go back to reference Hashemi AS, Sattarvand J (2015) Simulation based investigation of different fleet management paradigms in open pit mines-a case study of Sungun copper mine / /Symulacje I Badania Różnych Paradygmatów Wykorzystania Floty Pojazdów I Urządzeń W Kopalniach Odkrywkowych. Studium Przypadku: Kopalnia Miedzi W Sungun, Arch Min Sci 60(1):195–208 Hashemi AS, Sattarvand J (2015) Simulation based investigation of different fleet management paradigms in open pit mines-a case study of Sungun copper mine / /Symulacje I Badania Różnych Paradygmatów Wykorzystania Floty Pojazdów I Urządzeń W Kopalniach Odkrywkowych. Studium Przypadku: Kopalnia Miedzi W Sungun, Arch Min Sci 60(1):195–208
go back to reference He MX, Wei JC, Lu XM, Huang BX (2010) The genetic algorithm for truck dispatching problems in surface mine. Inf Technol J 9(4):710–714CrossRef He MX, Wei JC, Lu XM, Huang BX (2010) The genetic algorithm for truck dispatching problems in surface mine. Inf Technol J 9(4):710–714CrossRef
go back to reference Jaoua A, Riopel D, Gamache M (2012) A simulation framework for real-time fleet management in internal transport systems. Simul Modell Pract Theory 21(1):78–90CrossRef Jaoua A, Riopel D, Gamache M (2012) A simulation framework for real-time fleet management in internal transport systems. Simul Modell Pract Theory 21(1):78–90CrossRef
go back to reference L’Heureux G, Gamache M, Soumis F (2013) Mixed integer programming model for short term planning in open-pit mines. Min Technol 122(2):101–109CrossRef L’Heureux G, Gamache M, Soumis F (2013) Mixed integer programming model for short term planning in open-pit mines. Min Technol 122(2):101–109CrossRef
go back to reference Li Z (1990) A methodology for the optimum control of shovel and truck operations in open-pit mining. Min Sci Technol 10(3):337–340CrossRef Li Z (1990) A methodology for the optimum control of shovel and truck operations in open-pit mining. Min Sci Technol 10(3):337–340CrossRef
go back to reference Lizotte Y, Bonates E (1987) Truck and shovel dispatching rules assessment using simulation. Min Sci Technol 5(1):45–58CrossRef Lizotte Y, Bonates E (1987) Truck and shovel dispatching rules assessment using simulation. Min Sci Technol 5(1):45–58CrossRef
go back to reference Manríquez F, González H, Morales N (2019) Short-term open-pit mine production scheduling with hierarchical objectives, In: Mining goes digital: proceedings of the 39th International Symposium'Application of Computers and Operations Research in the Mineral Industry'(APCOM 2019), June 4–6, 2019, Wroclaw, Poland. CRC Press Manríquez F, González H, Morales N (2019) Short-term open-pit mine production scheduling with hierarchical objectives, In: Mining goes digital: proceedings of the 39th International Symposium'Application of Computers and Operations Research in the Mineral Industry'(APCOM 2019), June 4–6, 2019, Wroclaw, Poland. CRC Press
go back to reference Matamoros MEV, Dimitrakopoulos R (2016) Stochastic short-term mine production schedule accounting for fleet allocation, operational considerations and blending restrictions. Eur J Oper Res 255(3):911–921MathSciNetMATHCrossRef Matamoros MEV, Dimitrakopoulos R (2016) Stochastic short-term mine production schedule accounting for fleet allocation, operational considerations and blending restrictions. Eur J Oper Res 255(3):911–921MathSciNetMATHCrossRef
go back to reference Mohtasham M, Mirzaei-Nasirabad H, Mahmoodi MA (2017) Development of a goal programming model for optimization of truck allocation in open pit mines. J Min Env 8(3):359–371 Mohtasham M, Mirzaei-Nasirabad H, Mahmoodi MA (2017) Development of a goal programming model for optimization of truck allocation in open pit mines. J Min Env 8(3):359–371
go back to reference Mohtasham M, Mirzaei-Nasirabad H, Alizadeh B (2021a) Optimization of truck-shovel allocation in open-pit mines under uncertainty: a chance-constrained goal programming approach. Min Technol 130(2):81–100CrossRef Mohtasham M, Mirzaei-Nasirabad H, Alizadeh B (2021a) Optimization of truck-shovel allocation in open-pit mines under uncertainty: a chance-constrained goal programming approach. Min Technol 130(2):81–100CrossRef
go back to reference Mohtasham M, Mirzaei-Nasirabad H, Askari-Nasab H, Alizadeh B (2021b) A multi-objective model for fleet allocation schedule in open-pit mines considering the impact of prioritising objectives on transportation system performance. Int J Min Reclamat Environ 35(9):1–19 Mohtasham M, Mirzaei-Nasirabad H, Askari-Nasab H, Alizadeh B (2021b) A multi-objective model for fleet allocation schedule in open-pit mines considering the impact of prioritising objectives on transportation system performance. Int J Min Reclamat Environ 35(9):1–19
go back to reference Moradi-Afrapoli A, Tabesh M, Askari-Nasab H (2019a) A multiple objective transportation problem approach to dynamic truck dispatching in surface mines. Eur J Operat Res 276(1):331–342MathSciNetMATHCrossRef Moradi-Afrapoli A, Tabesh M, Askari-Nasab H (2019a) A multiple objective transportation problem approach to dynamic truck dispatching in surface mines. Eur J Operat Res 276(1):331–342MathSciNetMATHCrossRef
go back to reference Moradi-Afrapoli A, Tabesh M, Askari-Nasab H (2019b) A transportation problem-based stochastic integer programming model to dispatch surface mining trucks under uncertainty. In: Proceedings of the 27th international symposium on mine planning and equipment selection-MPES 2018. Springer, Berlin/Heidelberg, Germany, pp 255–264 Moradi-Afrapoli A, Tabesh M, Askari-Nasab H (2019b) A transportation problem-based stochastic integer programming model to dispatch surface mining trucks under uncertainty. In: Proceedings of the 27th international symposium on mine planning and equipment selection-MPES 2018. Springer, Berlin/Heidelberg, Germany, pp 255–264
go back to reference Ozdemir B, Kumral M (2019) Simulation-based optimization of truck-shovel material handling systems in multi-pit surface mines. Simul Model Pract Theory 95:36–48CrossRef Ozdemir B, Kumral M (2019) Simulation-based optimization of truck-shovel material handling systems in multi-pit surface mines. Simul Model Pract Theory 95:36–48CrossRef
go back to reference Sadler WM (1988) Practical truck dispatching—a micro computer based approach. In: Fytas K, Collins JL, Singhal RK (eds) Computer applications in the mineral industry. Balkema, Rotterdam, pp 495–500 Sadler WM (1988) Practical truck dispatching—a micro computer based approach. In: Fytas K, Collins JL, Singhal RK (eds) Computer applications in the mineral industry. Balkema, Rotterdam, pp 495–500
go back to reference Sahoo LK, Bandyopadhyay S, Banerjee R (2010) Energy performance of dump trucks in opencast mine. Proceedings of ECOS, pp 1899–1906 Sahoo LK, Bandyopadhyay S, Banerjee R (2010) Energy performance of dump trucks in opencast mine. Proceedings of ECOS, pp 1899–1906
go back to reference Samavati M, Palmer AW, Hill AJ, Seiler KM (2019) Improvements in plan-driven truck dispatching systems for surface mining. Mining Goes Digital. CRC Press, Florida, pp 357–366CrossRef Samavati M, Palmer AW, Hill AJ, Seiler KM (2019) Improvements in plan-driven truck dispatching systems for surface mining. Mining Goes Digital. CRC Press, Florida, pp 357–366CrossRef
go back to reference Seiler KM, Palmer AW, Hill AJ (2020) Flow-achieving online planning and dispatching for continuous transportation with autonomous vehicles. IEEE Transactions on Automation Science and Engineering 2020 Dec 14 Seiler KM, Palmer AW, Hill AJ (2020) Flow-achieving online planning and dispatching for continuous transportation with autonomous vehicles. IEEE Transactions on Automation Science and Engineering 2020 Dec 14
go back to reference Sgurev V, Vassilev V, Dokev N, Genova K, Drangajov S, Korsemov Ch, Atanassov A (1989) TRASY—An automated system for real-time control of the industrial truck haulage in open-pit mines. Eur J Oper Res 43(1):44–52CrossRef Sgurev V, Vassilev V, Dokev N, Genova K, Drangajov S, Korsemov Ch, Atanassov A (1989) TRASY—An automated system for real-time control of the industrial truck haulage in open-pit mines. Eur J Oper Res 43(1):44–52CrossRef
go back to reference Smith A, Linderoth J, Luedtke J (2021) Optimization-based dispatching policies for open-pit mining. Optim Eng 22(3):1347–1387MATHCrossRef Smith A, Linderoth J, Luedtke J (2021) Optimization-based dispatching policies for open-pit mining. Optim Eng 22(3):1347–1387MATHCrossRef
go back to reference Soumis F, Ethier J, Elbrond J (1989) Truck dispatching in an open pit mine. Int J Surf Min Reclam Environ 3(2):115–119CrossRef Soumis F, Ethier J, Elbrond J (1989) Truck dispatching in an open pit mine. Int J Surf Min Reclam Environ 3(2):115–119CrossRef
go back to reference Soumis F, Ethier F, Elbrond J (1990) Evaluation of the new truck dispatching in the mount wright mine. In: 21st APCOM Proceedings, pp 674–682 Soumis F, Ethier F, Elbrond J (1990) Evaluation of the new truck dispatching in the mount wright mine. In: 21st APCOM Proceedings, pp 674–682
go back to reference Souza MJF, Coelho IM, Ribas S, Santos HG, Merschmann LHC (2010) A hybrid heuristic algorithm for the open-pit-mining operational planning problem. Eur J Operat Res 207(2):1041–1051MATHCrossRef Souza MJF, Coelho IM, Ribas S, Santos HG, Merschmann LHC (2010) A hybrid heuristic algorithm for the open-pit-mining operational planning problem. Eur J Operat Res 207(2):1041–1051MATHCrossRef
go back to reference Subtil RF, Silva DM, Alves JC (2011) A practical approach to truck dispatch for open pit mines. In: 35th APCOM, 2011, September, University of Wollongong, Wollongong, NSW, Australia, pp 765–777 Subtil RF, Silva DM, Alves JC (2011) A practical approach to truck dispatch for open pit mines. In: 35th APCOM, 2011, September, University of Wollongong, Wollongong, NSW, Australia, pp 765–777
go back to reference Ta CH, Kresta JV, Forbes JF, Marquez HJ (2005) A stochastic optimization approach to mine truck allocation. Int J Surf Min Reclam Environ 19(3):162–175CrossRef Ta CH, Kresta JV, Forbes JF, Marquez HJ (2005) A stochastic optimization approach to mine truck allocation. Int J Surf Min Reclam Environ 19(3):162–175CrossRef
go back to reference Tan Y, Miwa K, Chinbat U, Takakuwa S (2012) Operations modeling and analysis of open pit copper mining using GPS tracking data. In Proceedings of the 2012 Winter Simulation Conference (WSC), IEEE, pp 1–12 Tan Y, Miwa K, Chinbat U, Takakuwa S (2012) Operations modeling and analysis of open pit copper mining using GPS tracking data. In Proceedings of the 2012 Winter Simulation Conference (WSC), IEEE, pp 1–12
go back to reference Temeng VA, Otuonye FO, Frendewey JOA (1989) non-preemptive goal programming approach to truck dispatching in open pit mines. MRE 7(2):59–67 Temeng VA, Otuonye FO, Frendewey JOA (1989) non-preemptive goal programming approach to truck dispatching in open pit mines. MRE 7(2):59–67
go back to reference Temeng VA, Otuonye FO, Frendewey JO (1997) Real-time truck dispatching using a transportation algorithm. Int J Surf Min Reclam Environ 11(4):203–207CrossRef Temeng VA, Otuonye FO, Frendewey JO (1997) Real-time truck dispatching using a transportation algorithm. Int J Surf Min Reclam Environ 11(4):203–207CrossRef
go back to reference Topal E, Ramazan S (2012) Mining truck scheduling with stochastic maintenance cost. J Coal Sci Eng (China) 18(3):313–319CrossRef Topal E, Ramazan S (2012) Mining truck scheduling with stochastic maintenance cost. J Coal Sci Eng (China) 18(3):313–319CrossRef
go back to reference Torkamani E, Askari-Nasab H (2015) A linkage of truck-and-shovel operations to short-term mine plans using discrete-event simulation. Int J Min Mineral Eng 6(2):97–118CrossRef Torkamani E, Askari-Nasab H (2015) A linkage of truck-and-shovel operations to short-term mine plans using discrete-event simulation. Int J Min Mineral Eng 6(2):97–118CrossRef
go back to reference Tu J, Hucka VJ (1985) Analysis of open-pit truck haulage system by use of a computer-model. CIM Bull 78(879):53–59 Tu J, Hucka VJ (1985) Analysis of open-pit truck haulage system by use of a computer-model. CIM Bull 78(879):53–59
go back to reference Upadhyay SP, Askari-Nasab H (2016) Truck-shovel allocation optimisation: a goal programming approach. Min Technol 125(2):1–11CrossRef Upadhyay SP, Askari-Nasab H (2016) Truck-shovel allocation optimisation: a goal programming approach. Min Technol 125(2):1–11CrossRef
go back to reference White JW, Olson JP (1986) Computer-based dispatching in mines with concurrent operating objectives. Min Eng Littleton 38(11):1045–1054 White JW, Olson JP (1986) Computer-based dispatching in mines with concurrent operating objectives. Min Eng Littleton 38(11):1045–1054
go back to reference White JW, Arnold M, Clevenger J (1982) Automated open-pit truck dispatching at Tyrone. E&MJ 183(6):76–84 White JW, Arnold M, Clevenger J (1982) Automated open-pit truck dispatching at Tyrone. E&MJ 183(6):76–84
go back to reference Xi Y, Yegulalp TM (1993) Optimum dispatching algorithm for Anshan open-pit mine. In 24th APCOM, Canadian Institute of Mining, Metallurgy and Petroleum, Montreal, Quebec, Canada Xi Y, Yegulalp TM (1993) Optimum dispatching algorithm for Anshan open-pit mine. In 24th APCOM, Canadian Institute of Mining, Metallurgy and Petroleum, Montreal, Quebec, Canada
go back to reference Yeganejou M, Badiozamani M, Moradi-Afrapoli A, Askari-Nasab H (2021) Integration of simulation and dispatch modelling to predict fleet productivity: an open-pit mining case. Mining Technology, pp 1–13 Yeganejou M, Badiozamani M, Moradi-Afrapoli A, Askari-Nasab H (2021) Integration of simulation and dispatch modelling to predict fleet productivity: an open-pit mining case. Mining Technology, pp 1–13
Metadata
Title
An optimization model for the real-time truck dispatching problem in open-pit mining operations
Authors
Hossein Mirzaei-Nasirabad
Mehrnaz Mohtasham
Hooman Askari-Nasab
Behrooz Alizadeh
Publication date
28-02-2023
Publisher
Springer US
Published in
Optimization and Engineering / Issue 4/2023
Print ISSN: 1389-4420
Electronic ISSN: 1573-2924
DOI
https://doi.org/10.1007/s11081-022-09780-x

Other articles of this Issue 4/2023

Optimization and Engineering 4/2023 Go to the issue

Premium Partners