Skip to main content
Top

2021 | OriginalPaper | Chapter

Analyzing the Role of Six Big Losses in OEE to Enhance the Performance: Literature Review and Directions

Authors : Sandeep Singh, Jaimal Singh Khamba, Davinder Singh

Published in: Advances in Industrial and Production Engineering

Publisher: Springer Singapore

Activate our intelligent search to find suitable subject content or patents.

search-config
loading …

Abstract

The engineering sectors have a considerable contribution toward a nation’s economy. These industries are amid the principle-focused industries around the globe. Hence, appropriate utilization of available resources as well as equipment is a high priority in task list of every industry. Since many of these industries are dealing with hurdles to keep all the activities, operations, and synchronized use of equipment with a considerable reduction of time losses. These time losses (so called Six Big Losses) have a set of analyzing factors, which affect the overall performance. Six Big Losses (SBL) are now becoming the real cause of focus to attain world class manufacturing standards in association with strategic tool such as OEE (Overall Equipment Effectiveness). To cover the wide-ranging and dynamic time loss analysis, the corrective measure is OEE. The aim of implementation of OEE is to enhance and acquire the equipment’s effectiveness by removing all the potential losses of the industry. This paper discloses the importance of the extensive literature for analysis of these losses systematically. This study also covers a powerful organized strategy, i.e., OEE and the actual time losses in the industries to bring transformation in the attitude of management, managers and workers. This paper tunes up the literature related to SBL to find the potential errors through optimized approach to improve decision-making.

Dont have a licence yet? Then find out more about our products and how to get one now:

Springer Professional "Wirtschaft+Technik"

Online-Abonnement

Mit Springer Professional "Wirtschaft+Technik" erhalten Sie Zugriff auf:

  • über 102.000 Bücher
  • über 537 Zeitschriften

aus folgenden Fachgebieten:

  • Automobil + Motoren
  • Bauwesen + Immobilien
  • Business IT + Informatik
  • Elektrotechnik + Elektronik
  • Energie + Nachhaltigkeit
  • Finance + Banking
  • Management + Führung
  • Marketing + Vertrieb
  • Maschinenbau + Werkstoffe
  • Versicherung + Risiko

Jetzt Wissensvorsprung sichern!

Springer Professional "Technik"

Online-Abonnement

Mit Springer Professional "Technik" erhalten Sie Zugriff auf:

  • über 67.000 Bücher
  • über 390 Zeitschriften

aus folgenden Fachgebieten:

  • Automobil + Motoren
  • Bauwesen + Immobilien
  • Business IT + Informatik
  • Elektrotechnik + Elektronik
  • Energie + Nachhaltigkeit
  • Maschinenbau + Werkstoffe




 

Jetzt Wissensvorsprung sichern!

Literature
1.
go back to reference Aghaie, A., Popplewell, K.: Simulation for TQM-the unused tool? TQM Mag. 9(2), 111–116 (1997)CrossRef Aghaie, A., Popplewell, K.: Simulation for TQM-the unused tool? TQM Mag. 9(2), 111–116 (1997)CrossRef
2.
go back to reference Ahmed, S., Hj. Hassan, M., Taha, Z.: TPM can go beyond maintenance: excerpt from a case implementation. J. Qual. Maint. Eng. 11(1), 19–42 (2005)CrossRef Ahmed, S., Hj. Hassan, M., Taha, Z.: TPM can go beyond maintenance: excerpt from a case implementation. J. Qual. Maint. Eng. 11(1), 19–42 (2005)CrossRef
3.
go back to reference Ahuja, I.P.S., Khamba, J.S.: Total productive maintenance: literature review and directions. Int. J. Qual. Reliab. Manage. 25(7), 709–756 (2008)CrossRef Ahuja, I.P.S., Khamba, J.S.: Total productive maintenance: literature review and directions. Int. J. Qual. Reliab. Manage. 25(7), 709–756 (2008)CrossRef
4.
go back to reference Anvari, F., Edwards, R.: Performance measurement based on a total quality approach. Int. J. Prod. Perform. Manage. 60(5), 512–528 (2011)CrossRef Anvari, F., Edwards, R.: Performance measurement based on a total quality approach. Int. J. Prod. Perform. Manage. 60(5), 512–528 (2011)CrossRef
5.
go back to reference Arturo Garza-Reyes, J., Eldridge, S., Barber, K.D., Soriano-Meier, H.: Overall equipment effectiveness (OEE) and process capability (PC) measures: a relationship analysis. Int. J. Qual. Reliab. Manage. 27(1), 48–62 (2010)CrossRef Arturo Garza-Reyes, J., Eldridge, S., Barber, K.D., Soriano-Meier, H.: Overall equipment effectiveness (OEE) and process capability (PC) measures: a relationship analysis. Int. J. Qual. Reliab. Manage. 27(1), 48–62 (2010)CrossRef
6.
go back to reference Badiger, A.S., Gandhinathan, R.: A proposal: evaluation of OEE and impact of six big losses on equipment earning capacity. Int. J. Process Manage. Benchmarking 2(3), 234–248 (2008)CrossRef Badiger, A.S., Gandhinathan, R.: A proposal: evaluation of OEE and impact of six big losses on equipment earning capacity. Int. J. Process Manage. Benchmarking 2(3), 234–248 (2008)CrossRef
7.
go back to reference Badiger, A.S., Gandhinathan, R., Gaitonde, V.N.: A methodology to enhance equipment performance using the OEE measure. Eur. J. Indus. Eng. 2(3), 356–376 (2008)CrossRef Badiger, A.S., Gandhinathan, R., Gaitonde, V.N.: A methodology to enhance equipment performance using the OEE measure. Eur. J. Indus. Eng. 2(3), 356–376 (2008)CrossRef
8.
go back to reference Badiger, A.S., Gandhinathan, R., Gaitonde, V.N., Jangaler, R.S.: Implementation of Kaizen and Poka-yoke to enhance overall equipment performance—a case study. Manuf. Eng. Vyrobne Inzinierstvo 6(1), 24–29 (2007) Badiger, A.S., Gandhinathan, R., Gaitonde, V.N., Jangaler, R.S.: Implementation of Kaizen and Poka-yoke to enhance overall equipment performance—a case study. Manuf. Eng. Vyrobne Inzinierstvo 6(1), 24–29 (2007)
9.
go back to reference Baluch, N.H., Abdullah, C.S., Mohtar, S.: TPM and lean maintenance—a critical review. Interdiscipl. J. Contemp. Res. Bus. (IJCRB) (2012) Baluch, N.H., Abdullah, C.S., Mohtar, S.: TPM and lean maintenance—a critical review. Interdiscipl. J. Contemp. Res. Bus. (IJCRB) (2012)
10.
go back to reference Burhan, N., Sari, D.A.: Analysis of overall equipment effectiveness in fanuc line 1 machines by minimizing six big losses. J. Sustain. Eng. Proc. Ser. 1(2), 164–73 (2019)CrossRef Burhan, N., Sari, D.A.: Analysis of overall equipment effectiveness in fanuc line 1 machines by minimizing six big losses. J. Sustain. Eng. Proc. Ser. 1(2), 164–73 (2019)CrossRef
11.
go back to reference Chand, G., Shirvani, B.: Implementation of TPM in cellular manufacture. J. Mater. Process. Technol. 103(1), 149–154 (2000)CrossRef Chand, G., Shirvani, B.: Implementation of TPM in cellular manufacture. J. Mater. Process. Technol. 103(1), 149–154 (2000)CrossRef
12.
go back to reference da Costa, S.G., de Lima, E.P.: Uses and misuses of the overall equipment effectiveness’ for production management. In: IEEE International Engineering Management Conference, Vol. 2, pp. 816–820. IEEE (2002) da Costa, S.G., de Lima, E.P.: Uses and misuses of the overall equipment effectiveness’ for production management. In: IEEE International Engineering Management Conference, Vol. 2, pp. 816–820. IEEE (2002)
13.
go back to reference Dal, B., Tugwell, P., Greatbanks, R.: Overall equipment effectiveness as a measure of operational improvement–a practical analysis. Int. J. Oper. Prod. Manage. 20(12), 1488–1502 (2000)CrossRef Dal, B., Tugwell, P., Greatbanks, R.: Overall equipment effectiveness as a measure of operational improvement–a practical analysis. Int. J. Oper. Prod. Manage. 20(12), 1488–1502 (2000)CrossRef
14.
go back to reference Dal, B.: Audit and review of manufacturing performance measures at Airbags International Limited. Doctoral dissertation (1999) Dal, B.: Audit and review of manufacturing performance measures at Airbags International Limited. Doctoral dissertation (1999)
15.
go back to reference Dekker, R.: Applications of maintenance optimization models: a review and analysis. Reliab. Eng. Syst. Saf. 51(3), 229–240 (1996)CrossRef Dekker, R.: Applications of maintenance optimization models: a review and analysis. Reliab. Eng. Syst. Saf. 51(3), 229–240 (1996)CrossRef
16.
go back to reference Dogra, M., Sharma, V.S., Sachdeva, A., Dureja, J.S.: TPM–a key strategy for productivity improvement in process industry. J. Eng. Sci. Technol. 6(1), 1–16 (2011) Dogra, M., Sharma, V.S., Sachdeva, A., Dureja, J.S.: TPM–a key strategy for productivity improvement in process industry. J. Eng. Sci. Technol. 6(1), 1–16 (2011)
17.
go back to reference En-Nhaili, A., Meddaoui, A., Bouami, D.: Effectiveness improvement approach basing on OEE and lean maintenance tools. Int. J. Process Manage. Benchmarking 6(2), 147–169 (2016)CrossRef En-Nhaili, A., Meddaoui, A., Bouami, D.: Effectiveness improvement approach basing on OEE and lean maintenance tools. Int. J. Process Manage. Benchmarking 6(2), 147–169 (2016)CrossRef
18.
go back to reference Garg, A., Deshmukh, S.G.: Maintenance management: literature review and directions. J. Qual. Maint. Eng. 12(3), 205–238 (2006)CrossRef Garg, A., Deshmukh, S.G.: Maintenance management: literature review and directions. J. Qual. Maint. Eng. 12(3), 205–238 (2006)CrossRef
19.
go back to reference Ghafoorpoor Yazdi, P., Azizi, A., Hashemipour, M.: An empirical investigation of the relationship between overall equipment efficiency (OEE) and manufacturing sustainability in industry 4.0 with time study approach. Sustainability 10(9), 3031 (2018) Ghafoorpoor Yazdi, P., Azizi, A., Hashemipour, M.: An empirical investigation of the relationship between overall equipment efficiency (OEE) and manufacturing sustainability in industry 4.0 with time study approach. Sustainability 10(9), 3031 (2018)
20.
go back to reference Gholizadeh, S.: Evaluation of overall equipment effectiveness in developing country in crankshaft manufacturing. In: Proceedings of Academics World International Conference, Johannesburg, South Africa, 25–26 May 2019 (2019) Gholizadeh, S.: Evaluation of overall equipment effectiveness in developing country in crankshaft manufacturing. In: Proceedings of Academics World International Conference, Johannesburg, South Africa, 25–26 May 2019 (2019)
21.
go back to reference Gits, C.W.: Design of maintenance concepts. Int. J. Prod. Econ. 24(3), 217–226 (1992) Gits, C.W.: Design of maintenance concepts. Int. J. Prod. Econ. 24(3), 217–226 (1992)
22.
go back to reference Hedman, R., Subramaniyan, M., Almström, P.: Analysis of critical factors for automatic measurement of OEE. Procedia CIRP 57, 128–133 (2016)CrossRef Hedman, R., Subramaniyan, M., Almström, P.: Analysis of critical factors for automatic measurement of OEE. Procedia CIRP 57, 128–133 (2016)CrossRef
23.
go back to reference Herry, A.P., Farida, F., Lutfia, N.I.: November. Performance analysis of TPM implementation through Overall Equipment Effectiveness (OEE) and Six Big Losses. In: IOP Conference Series: Materials Science and Engineering, Vol. 453, No. 1, p. 012061. IOP Publishing (2018) Herry, A.P., Farida, F., Lutfia, N.I.: November. Performance analysis of TPM implementation through Overall Equipment Effectiveness (OEE) and Six Big Losses. In: IOP Conference Series: Materials Science and Engineering, Vol. 453, No. 1, p. 012061. IOP Publishing (2018)
24.
go back to reference Huang, W., Xiong, Y., Wang, X., Miao, F., Wu, C., Gong, X., Lu, Q.: Fine-grained refinement on tpm-based protocol applications. IEEE Trans. Inf. Forensics Secur. 8(6), 1013–1026 (2013)CrossRef Huang, W., Xiong, Y., Wang, X., Miao, F., Wu, C., Gong, X., Lu, Q.: Fine-grained refinement on tpm-based protocol applications. IEEE Trans. Inf. Forensics Secur. 8(6), 1013–1026 (2013)CrossRef
25.
go back to reference Jeong, K.Y., Phillips, D.T.: Operational efficiency and effectiveness measurement. Int. J. Oper. Prod. Manage. 21(11), 1404–1416 (2001)CrossRef Jeong, K.Y., Phillips, D.T.: Operational efficiency and effectiveness measurement. Int. J. Oper. Prod. Manage. 21(11), 1404–1416 (2001)CrossRef
26.
go back to reference Jonsson, P., Lesshammar, M.: Evaluation and improvement of manufacturing performance measurement systems-the role of OEE. Int. J. Oper. Prod. Manage. 19(1), 55–78 (1999)CrossRef Jonsson, P., Lesshammar, M.: Evaluation and improvement of manufacturing performance measurement systems-the role of OEE. Int. J. Oper. Prod. Manage. 19(1), 55–78 (1999)CrossRef
27.
go back to reference Karaulova, T., Bashkite, V.: Decision-making framework for used industrial equipment. Inzinerine Ekonomika-Engineering Economics 27(1), 23–31 (2016) Karaulova, T., Bashkite, V.: Decision-making framework for used industrial equipment. Inzinerine Ekonomika-Engineering Economics 27(1), 23–31 (2016)
28.
go back to reference Mahmood, K., Otto, T., Shevtshenko, E., Karaulova, T. (2016). Performance evaluation by using overall equipment effectiveness (OEE): an analyzing tool Mahmood, K., Otto, T., Shevtshenko, E., Karaulova, T. (2016). Performance evaluation by using overall equipment effectiveness (OEE): an analyzing tool
29.
go back to reference Martomo, Z.I., Laksono, P.W.: Analysis of total productive maintenance (TPM) implementation using overall equipment effectiveness (OEE) and six big losses: A case study. In: AIP Conference Proceedings, Vol. 1931, No. 1, p. 030026. AIP Publishing LLC (2018) Martomo, Z.I., Laksono, P.W.: Analysis of total productive maintenance (TPM) implementation using overall equipment effectiveness (OEE) and six big losses: A case study. In: AIP Conference Proceedings, Vol. 1931, No. 1, p. 030026. AIP Publishing LLC (2018)
30.
go back to reference Mathur, A., Dangayach, G.S., Mittal, M.L., Sharma, M.K. (2011). Performance measurement in automated manufacturing. Measuring business excellence Mathur, A., Dangayach, G.S., Mittal, M.L., Sharma, M.K. (2011). Performance measurement in automated manufacturing. Measuring business excellence
31.
go back to reference Moseichuk, V., Bashkite, V., Karaulova, T.: Lifecycle extension for industrial equipment. In: Proceedings of 7th International Conference of DAAAM Baltic Industrial Engineering, pp. 364–369 (2010) Moseichuk, V., Bashkite, V., Karaulova, T.: Lifecycle extension for industrial equipment. In: Proceedings of 7th International Conference of DAAAM Baltic Industrial Engineering, pp. 364–369 (2010)
32.
go back to reference Munoz-Villamizar, A., Santos, J., Montoya-Torres, J.R., Jaca, C.: Using OEE to evaluate the effectiveness of urban freight transportation systems: a case study. Int. J. Prod. Econ. 197, 232–242 (2018)CrossRef Munoz-Villamizar, A., Santos, J., Montoya-Torres, J.R., Jaca, C.: Using OEE to evaluate the effectiveness of urban freight transportation systems: a case study. Int. J. Prod. Econ. 197, 232–242 (2018)CrossRef
33.
go back to reference Murray, V., Tassie, B.: Evaluating the effectiveness of nonprofit organizations. Jossey-Bass Handb. Nonprofit Leadersh. Manage. 14, 303-324 (1994) Murray, V., Tassie, B.: Evaluating the effectiveness of nonprofit organizations. Jossey-Bass Handb. Nonprofit Leadersh. Manage. 14, 303-324 (1994)
34.
go back to reference Nachiappan, R.M., Anantharaman, N.: Evaluation of overall line effectiveness (OLE) in a continuous product line manufacturing system. J. Manuf. Technol. Manage. 17(7), 987–1008 (2006)CrossRef Nachiappan, R.M., Anantharaman, N.: Evaluation of overall line effectiveness (OLE) in a continuous product line manufacturing system. J. Manuf. Technol. Manage. 17(7), 987–1008 (2006)CrossRef
35.
go back to reference Nakajima, S.: Introduction to TPM: total productive maintenance. (Translation). Productivity Press, Inc., 1988:129 (1988) Nakajima, S.: Introduction to TPM: total productive maintenance. (Translation). Productivity Press, Inc., 1988:129 (1988)
36.
go back to reference Nakajima, S.: TPM development program: implementing total productive maintenance. Productivity press (1989) Nakajima, S.: TPM development program: implementing total productive maintenance. Productivity press (1989)
37.
go back to reference Nord, C., Petterson, B., Johansson, B.: TPM: Total Productive Maintenance. Idrottens Grafiska, Goteborg (1997) Nord, C., Petterson, B., Johansson, B.: TPM: Total Productive Maintenance. Idrottens Grafiska, Goteborg (1997)
38.
go back to reference Pomorski, T.R.: Total productive maintenance (TPM) concepts and literature review. Brooks Automation, pp. 1–110 (2004) Pomorski, T.R.: Total productive maintenance (TPM) concepts and literature review. Brooks Automation, pp. 1–110 (2004)
39.
go back to reference Rajput, H.S., Jayaswal P.: A total productive maintenance (TPM) approach to improve overall equipment efficiency. Int. J Mod. Eng. Res. 2(6), 4383–4386 (2012) Rajput, H.S., Jayaswal P.: A total productive maintenance (TPM) approach to improve overall equipment efficiency. Int. J Mod. Eng. Res. 2(6), 4383–4386 (2012)
40.
go back to reference Riis, J.O., Luxhoj, J.T., Thorsteinsson, U.: A situational maintenance model. Int. J. Qual. Reliab. Manage. 14(4), 349–366 (1997)CrossRef Riis, J.O., Luxhoj, J.T., Thorsteinsson, U.: A situational maintenance model. Int. J. Qual. Reliab. Manage. 14(4), 349–366 (1997)CrossRef
41.
go back to reference Rimawan, E., Mardono, U., Purba, H., Univercity, M.B.: Mathematical Modeling with Sem–PLS in elimination of six big losses to reduce production cost of steel factories (2018) Rimawan, E., Mardono, U., Purba, H., Univercity, M.B.: Mathematical Modeling with Sem–PLS in elimination of six big losses to reduce production cost of steel factories (2018)
42.
go back to reference De Ron, A.J., Rooda, J.E.: Equipment effectiveness: OEE revisited. IEEE Trans. Semicond. Manuf. 18(1), 190–196 (2005)CrossRef De Ron, A.J., Rooda, J.E.: Equipment effectiveness: OEE revisited. IEEE Trans. Semicond. Manuf. 18(1), 190–196 (2005)CrossRef
43.
go back to reference Rozak, A., Shadrina, A., Rimawan, E.: Kaizen in world class automotive company with reduction of six big losses in cylinder block machining line in Indonesia. Int. J. Innov. Sci. Res. Technol. 4(7), 339–344 (2019) Rozak, A., Shadrina, A., Rimawan, E.: Kaizen in world class automotive company with reduction of six big losses in cylinder block machining line in Indonesia. Int. J. Innov. Sci. Res. Technol. 4(7), 339–344 (2019)
44.
go back to reference Rusman, M., Parenreng, S.M., Setiawan, I., Asmal, S., Wahid, I.: The overall equipment effectiveness (OEE) analysis in minimizing the Six Big Losses: an effort to green manufacturing in a wood processing company. In: IOP Conference Series: Earth and Environmental Science, Vol. 343, No. 1, p. 012010. IOP Publishing (2019) Rusman, M., Parenreng, S.M., Setiawan, I., Asmal, S., Wahid, I.: The overall equipment effectiveness (OEE) analysis in minimizing the Six Big Losses: an effort to green manufacturing in a wood processing company. In: IOP Conference Series: Earth and Environmental Science, Vol. 343, No. 1, p. 012010. IOP Publishing (2019)
45.
go back to reference Saenz de Ugarte, B., Artiba, A., Pellerin, R.: Manufacturing execution system–a literature review. Prod. Plan. Control 20(6), 525–539 (2009)CrossRef Saenz de Ugarte, B., Artiba, A., Pellerin, R.: Manufacturing execution system–a literature review. Prod. Plan. Control 20(6), 525–539 (2009)CrossRef
46.
go back to reference Sharma, R.K., Kumar, D., Kumar, P.: FLM to select suitable maintenance strategy in process industries using MISO model. J. Qual. Maint. Eng. 11(4), 359–374 (2005)CrossRef Sharma, R.K., Kumar, D., Kumar, P.: FLM to select suitable maintenance strategy in process industries using MISO model. J. Qual. Maint. Eng. 11(4), 359–374 (2005)CrossRef
47.
go back to reference Singh, D., Khamba, J.S., Nanda, T.: Factors contributing towards technology development in small firms. World Acad. Sci. Eng. Technol. Int. J. Mech. Indus. Sci. Eng. 8(1), 235–243 (2014) Singh, D., Khamba, J.S., Nanda, T.: Factors contributing towards technology development in small firms. World Acad. Sci. Eng. Technol. Int. J. Mech. Indus. Sci. Eng. 8(1), 235–243 (2014)
48.
go back to reference Singh, D., Khamba, J.S., Nanda, T.: Justification of technology innovation implementation in Indian MSMEs using AHP. Int. J. Serv. Oper. Manage. 32(4), 522–538 (2019) Singh, D., Khamba, J.S., Nanda, T.: Justification of technology innovation implementation in Indian MSMEs using AHP. Int. J. Serv. Oper. Manage. 32(4), 522–538 (2019)
49.
go back to reference Singh, S., Singh, K., Mahajan, V., Singh, G.: Justification of overall equipment effectiveness (OEE) in Indian sugar mill industry for attaining core excellence. Int. J. 8(1), 34–36 (2020) Singh, S., Singh, K., Mahajan, V., Singh, G.: Justification of overall equipment effectiveness (OEE) in Indian sugar mill industry for attaining core excellence. Int. J. 8(1), 34–36 (2020)
50.
go back to reference Singh, S., Khamba, J.S., Singh, D.: Analysis and directions of OEE and its integration with different strategic tools. J. Proces. Mech. Eng. (2020). Accepted: May 2020 Singh, S., Khamba, J.S., Singh, D.: Analysis and directions of OEE and its integration with different strategic tools. J. Proces. Mech. Eng. (2020). Accepted: May 2020
51.
go back to reference Sowmya, K., Chetan, N.: A review on effective utilization of resources using overall equipment effectiveness by reducing six big losses. Int. J. Sci. Res. Sci. Eng. Technol. 2(1), 2394–4099 (2016) Sowmya, K., Chetan, N.: A review on effective utilization of resources using overall equipment effectiveness by reducing six big losses. Int. J. Sci. Res. Sci. Eng. Technol. 2(1), 2394–4099 (2016)
52.
go back to reference Sutoni, A., Setyawan, W., Munandar, T.: Total productive maintenance (TPM) analysis on lathe machines using the overall equipment effectiveness method and six big losses. In Journal of Physics: Conference Series, Vol. 1179, No. 1, p. 012089. IOP Publishing (2019) Sutoni, A., Setyawan, W., Munandar, T.: Total productive maintenance (TPM) analysis on lathe machines using the overall equipment effectiveness method and six big losses. In Journal of Physics: Conference Series, Vol. 1179, No. 1, p. 012089. IOP Publishing (2019)
53.
go back to reference Sutoni, A., Setyawan, W., Munandar, T.: Total productive maintenance (TPM) analysis on lathe machines using the overall equipment effectiveness method and six big losses. In: Journal of Physics: Conference Series, Vol. 1179, No. 1, p. 012089. IOP Publishing (2019) Sutoni, A., Setyawan, W., Munandar, T.: Total productive maintenance (TPM) analysis on lathe machines using the overall equipment effectiveness method and six big losses. In: Journal of Physics: Conference Series, Vol. 1179, No. 1, p. 012089. IOP Publishing (2019)
54.
go back to reference Tajiri, M., Gotoh, F.: Autonomous maintenance in seven steps: implementing TPM on the shop floor. Productivity (1999) Tajiri, M., Gotoh, F.: Autonomous maintenance in seven steps: implementing TPM on the shop floor. Productivity (1999)
55.
go back to reference Vijayakumar, S.R., Gajendran, S.: Improvement of overall equipment effectiveness (OEE) in injection moulding process industry. IOSR J. Mech. Civil Eng. 2(10), 47–60 (2014) Vijayakumar, S.R., Gajendran, S.: Improvement of overall equipment effectiveness (OEE) in injection moulding process industry. IOSR J. Mech. Civil Eng. 2(10), 47–60 (2014)
56.
go back to reference Willmott, H.: Business process re-engineering and human resource management. Personnel Rev. 23(3), 34–46 (1994)CrossRef Willmott, H.: Business process re-engineering and human resource management. Personnel Rev. 23(3), 34–46 (1994)CrossRef
Metadata
Title
Analyzing the Role of Six Big Losses in OEE to Enhance the Performance: Literature Review and Directions
Authors
Sandeep Singh
Jaimal Singh Khamba
Davinder Singh
Copyright Year
2021
Publisher
Springer Singapore
DOI
https://doi.org/10.1007/978-981-33-4320-7_37

Premium Partners