Skip to main content
Top

2015 | OriginalPaper | Chapter

4. Asset Operations: Non-productive Times During Oil Well Drilling

Activate our intelligent search to find suitable subject content or patents.

search-config
loading …

Abstract

Weather, well bore characteristics, tools and equipment failures, and other sources of risk aggregate into non-productive times (NPT) which, in turn, adversely impact on the efficiency and costs of drilling crude oil wells. The imperative is to increase efficiency and reduce the cost of drilling operations, especially for offshore locations where the high temperature and pressure conditions mean that the window between reservoir pore pressures and fracture gradients can be quite narrow. By analyzing data on drilling rigs from three operators, the paper provides insight into some of the prevalent reasons why NPT account for more than 30 % of the budget for oil well construction in the geographical area under study.

Dont have a licence yet? Then find out more about our products and how to get one now:

Springer Professional "Wirtschaft+Technik"

Online-Abonnement

Mit Springer Professional "Wirtschaft+Technik" erhalten Sie Zugriff auf:

  • über 102.000 Bücher
  • über 537 Zeitschriften

aus folgenden Fachgebieten:

  • Automobil + Motoren
  • Bauwesen + Immobilien
  • Business IT + Informatik
  • Elektrotechnik + Elektronik
  • Energie + Nachhaltigkeit
  • Finance + Banking
  • Management + Führung
  • Marketing + Vertrieb
  • Maschinenbau + Werkstoffe
  • Versicherung + Risiko

Jetzt Wissensvorsprung sichern!

Springer Professional "Wirtschaft"

Online-Abonnement

Mit Springer Professional "Wirtschaft" erhalten Sie Zugriff auf:

  • über 67.000 Bücher
  • über 340 Zeitschriften

aus folgenden Fachgebieten:

  • Bauwesen + Immobilien
  • Business IT + Informatik
  • Finance + Banking
  • Management + Führung
  • Marketing + Vertrieb
  • Versicherung + Risiko




Jetzt Wissensvorsprung sichern!

Springer Professional "Technik"

Online-Abonnement

Mit Springer Professional "Technik" erhalten Sie Zugriff auf:

  • über 67.000 Bücher
  • über 390 Zeitschriften

aus folgenden Fachgebieten:

  • Automobil + Motoren
  • Bauwesen + Immobilien
  • Business IT + Informatik
  • Elektrotechnik + Elektronik
  • Energie + Nachhaltigkeit
  • Maschinenbau + Werkstoffe




 

Jetzt Wissensvorsprung sichern!

Literature
1.
go back to reference Reid D, Rosenberg S, Montgomery M, Sutherland M, York P (2006) Drilling hazard mitigation and high value well construction techniques. In: Offshore technology conference, OTC 18084. Houston, Texas, USA, 1–6 May 2006, pp 1–4 Reid D, Rosenberg S, Montgomery M, Sutherland M, York P (2006) Drilling hazard mitigation and high value well construction techniques. In: Offshore technology conference, OTC 18084. Houston, Texas, USA, 1–6 May 2006, pp 1–4
2.
go back to reference Hong W, Soliman MY, Towler FB (2008) Investigation of factors for strengthening a wellbore by propping fractures. In: Drilling conference, SPE 112629. Orlando Florida USA, 4–6 Mar 2008, pp 1–3 Hong W, Soliman MY, Towler FB (2008) Investigation of factors for strengthening a wellbore by propping fractures. In: Drilling conference, SPE 112629. Orlando Florida USA, 4–6 Mar 2008, pp 1–3
3.
go back to reference McAndrews KL (2011) Consequences of Macondo: A summary of recently proposed and enacted changes to US offshore drilling safety and environmental regulation. In: SPE Americas E & P health, safety, security and environmental conference. Houston Texas USA, SPE143718-PP, 21–23 Mar 2011, pp 1–2 McAndrews KL (2011) Consequences of Macondo: A summary of recently proposed and enacted changes to US offshore drilling safety and environmental regulation. In: SPE Americas E & P health, safety, security and environmental conference. Houston Texas USA, SPE143718-PP, 21–23 Mar 2011, pp 1–2
4.
go back to reference Hamayun R, Rich D (2011) Enhanced use of real-time centers can optimize well planning, drilling and geosteering. The drilling contractor magazine, March/April 2011 (issue) Hamayun R, Rich D (2011) Enhanced use of real-time centers can optimize well planning, drilling and geosteering. The drilling contractor magazine, March/April 2011 (issue)
5.
go back to reference Craig DA, Hanley MC, MacFarland B, Shearer D, King P (2009) A proven approach to mitigating drilling vibration problems in offshore Western Australia. In: International petroleum technology conference, IPTC 13399. Doha, Qatar, 7–9 Dec 2009 Craig DA, Hanley MC, MacFarland B, Shearer D, King P (2009) A proven approach to mitigating drilling vibration problems in offshore Western Australia. In: International petroleum technology conference, IPTC 13399. Doha, Qatar, 7–9 Dec 2009
6.
go back to reference Dodson JK (2010) Drilling performance benchmark metrics. Dodson Data Systems.com Dodson JK (2010) Drilling performance benchmark metrics. Dodson Data Systems.com
7.
go back to reference Andersen LB, Lembourn PR (1994) Analysis of interruption and lost rig time due to equipment failure in offshore drilling operations. In: Drilling conference, SPE/IADC 27511. Dallas, Texas USA, 15–18 Feb 1994, pp 1–4 Andersen LB, Lembourn PR (1994) Analysis of interruption and lost rig time due to equipment failure in offshore drilling operations. In: Drilling conference, SPE/IADC 27511. Dallas, Texas USA, 15–18 Feb 1994, pp 1–4
Metadata
Title
Asset Operations: Non-productive Times During Oil Well Drilling
Authors
Joe Amadi-Echendu
Audu Enoch Yakubu
Copyright Year
2015
DOI
https://doi.org/10.1007/978-3-319-06966-1_4

Premium Partners