Skip to main content
Top

2023 | OriginalPaper | Chapter

Automated Ergonomics-Based Productivity Analysis for Intelligent Manufacturing in Industrialized Construction

Authors : Jingwen Wang, Yomna Mohamed, SangHyeok Han, Xinming Li, Mohamed Al-Hussein

Published in: Proceedings of the Canadian Society of Civil Engineering Annual Conference 2021

Publisher: Springer Nature Singapore

Activate our intelligent search to find suitable subject content or patents.

search-config
loading …

Abstract

Construction workers perform repetitive and physically demanding tasks that expose them to the risk of developing work-related musculoskeletal disorders. Accurate estimation of the cycle times of manual operations is essential for reliable planning and scheduling as well as for ergonomic risk assessment. However, the reliability of the standardized cycle time analysis is hindered by its dependence on various factors that change with the increasing complexity of the working environment, as well as by the inherent challenges involved in acquiring accurate measurements. This study thus investigates the integration of predetermined motion time systems (PMTSs) with ergonomic risk assessments in 3D visualization for the purposes of cycle time estimation and ergonomic risk evaluation. An integrated approach is implemented to provide an automated and user-friendly method of analyzing manual operations at the motion level in the design phase. The actual and simulated cycle times and ergonomic risks are compared and analyzed using a case study. Preliminary cases are provided to demonstrate the feasibility and the potential applications of the proposed method. The proposed method is shown to be capable of quantifying the required cycle time and the ergonomic risks associated with body parts during the execution of manual operations. Using the proposed method, rapid ergonomic-centric workplace design can be achieved that, in turn, helps to improve productivity while mitigating ergonomic risk. The proposed method can be implemented to improve occupational health and safety, increase the reliability of planning and scheduling, and boost the overall productivity of industrialized construction.

Dont have a licence yet? Then find out more about our products and how to get one now:

Springer Professional "Wirtschaft+Technik"

Online-Abonnement

Mit Springer Professional "Wirtschaft+Technik" erhalten Sie Zugriff auf:

  • über 102.000 Bücher
  • über 537 Zeitschriften

aus folgenden Fachgebieten:

  • Automobil + Motoren
  • Bauwesen + Immobilien
  • Business IT + Informatik
  • Elektrotechnik + Elektronik
  • Energie + Nachhaltigkeit
  • Finance + Banking
  • Management + Führung
  • Marketing + Vertrieb
  • Maschinenbau + Werkstoffe
  • Versicherung + Risiko

Jetzt Wissensvorsprung sichern!

Springer Professional "Technik"

Online-Abonnement

Mit Springer Professional "Technik" erhalten Sie Zugriff auf:

  • über 67.000 Bücher
  • über 390 Zeitschriften

aus folgenden Fachgebieten:

  • Automobil + Motoren
  • Bauwesen + Immobilien
  • Business IT + Informatik
  • Elektrotechnik + Elektronik
  • Energie + Nachhaltigkeit
  • Maschinenbau + Werkstoffe




 

Jetzt Wissensvorsprung sichern!

Springer Professional "Wirtschaft"

Online-Abonnement

Mit Springer Professional "Wirtschaft" erhalten Sie Zugriff auf:

  • über 67.000 Bücher
  • über 340 Zeitschriften

aus folgenden Fachgebieten:

  • Bauwesen + Immobilien
  • Business IT + Informatik
  • Finance + Banking
  • Management + Führung
  • Marketing + Vertrieb
  • Versicherung + Risiko




Jetzt Wissensvorsprung sichern!

Literature
1.
go back to reference Freivalds A, Niebel B (2013) Niebel’s methods, standards, and work design. McGraw Hill, New York Freivalds A, Niebel B (2013) Niebel’s methods, standards, and work design. McGraw Hill, New York
2.
go back to reference Genaidy AM, Mital A, Obeidat M (1989) The validity of predetermined motion time systems in setting production standards for industrial tasks. Int J Ind Ergon 3(3):249–263CrossRef Genaidy AM, Mital A, Obeidat M (1989) The validity of predetermined motion time systems in setting production standards for industrial tasks. Int J Ind Ergon 3(3):249–263CrossRef
3.
go back to reference Golabchi A, Han S, AbouRizk S, Kanerva J (2016) Micro-motion level simulation for efficiency analysis and duration estimation of manual operations. Autom Constr 71:443–452CrossRef Golabchi A, Han S, AbouRizk S, Kanerva J (2016) Micro-motion level simulation for efficiency analysis and duration estimation of manual operations. Autom Constr 71:443–452CrossRef
4.
go back to reference Hignett S, McAtamney L (2000) Rapid entire body assessment (REBA). Appl Ergon 31(2):201–205CrossRef Hignett S, McAtamney L (2000) Rapid entire body assessment (REBA). Appl Ergon 31(2):201–205CrossRef
5.
go back to reference Li X, Han S, Gül M, Al-Hussein M (2019) Automated post-3D visualization ergonomic analysis system for rapid workplace design in modular construction. Autom Constr 98:160–174CrossRef Li X, Han S, Gül M, Al-Hussein M (2019) Automated post-3D visualization ergonomic analysis system for rapid workplace design in modular construction. Autom Constr 98:160–174CrossRef
6.
go back to reference Li X, Han S, Gül M, Al-Hussein M, El-Rich M (2018) 3D visualization-based ergonomic risk assessment and work modification framework and its validation for a lifting task. J Constr Eng Manag 144(1):04017093CrossRef Li X, Han S, Gül M, Al-Hussein M, El-Rich M (2018) 3D visualization-based ergonomic risk assessment and work modification framework and its validation for a lifting task. J Constr Eng Manag 144(1):04017093CrossRef
7.
go back to reference Martinez P, Ahmad R, Al-Hussein M (2019) A vision-based system for pre-inspection of steel frame manufacturing. Autom Constr 97:151–163CrossRef Martinez P, Ahmad R, Al-Hussein M (2019) A vision-based system for pre-inspection of steel frame manufacturing. Autom Constr 97:151–163CrossRef
8.
go back to reference Maynard HB, Stegmerten GJ, Schwab JL (1948) Methods-time measurement. McGraw Hill, New York Maynard HB, Stegmerten GJ, Schwab JL (1948) Methods-time measurement. McGraw Hill, New York
9.
go back to reference McAtamney L, Corlett EN (1993) RULA: a survey method for the investigation of work-related upper limb disorders. Appl Ergon 24(2):91–99CrossRef McAtamney L, Corlett EN (1993) RULA: a survey method for the investigation of work-related upper limb disorders. Appl Ergon 24(2):91–99CrossRef
11.
go back to reference Razmi J, Shakhs-Niyaee M (2008) Developing a specific predetermined time study approach: an empirical study in a car industry. Prod Plann Control 19(5):454–460CrossRef Razmi J, Shakhs-Niyaee M (2008) Developing a specific predetermined time study approach: an empirical study in a car industry. Prod Plann Control 19(5):454–460CrossRef
12.
go back to reference Shehata ME, El-Gohary KM (2011) Towards improving construction labor productivity and projects’ performance. Alex Eng J 50:321–330CrossRef Shehata ME, El-Gohary KM (2011) Towards improving construction labor productivity and projects’ performance. Alex Eng J 50:321–330CrossRef
13.
go back to reference Stewart JR (2002) Applying MODAPTS standard. The Society for Work Science (SWS) Stewart JR (2002) Applying MODAPTS standard. The Society for Work Science (SWS)
14.
go back to reference Thomas HR, Maloney WF, Horner RMW, Smith GR, Handa VK, Sanders SR (1990) Modeling construction labor productivity. J Constr Eng Manag 116(4):705–726CrossRef Thomas HR, Maloney WF, Horner RMW, Smith GR, Handa VK, Sanders SR (1990) Modeling construction labor productivity. J Constr Eng Manag 116(4):705–726CrossRef
15.
go back to reference Tuan ST, Karim ANM, Kays HME, Amin AKMN, Hasan MH (2014) Improvement of workflow and productivity through application of Maynard Opeartion Sequence Technique (MOST). In: Proceedings of the 2014 international conference on industrial engineering and operations management, Bali, Indonesia, pp 2162–2171 Tuan ST, Karim ANM, Kays HME, Amin AKMN, Hasan MH (2014) Improvement of workflow and productivity through application of Maynard Opeartion Sequence Technique (MOST). In: Proceedings of the 2014 international conference on industrial engineering and operations management, Bali, Indonesia, pp 2162–2171
16.
go back to reference Wang D, Dai F, Ning X (2015) Risk assessment of work-related musculoskeletal disorders in construction: state-of-the-art review. J Constr Eng Manag 141(6):04015008CrossRef Wang D, Dai F, Ning X (2015) Risk assessment of work-related musculoskeletal disorders in construction: state-of-the-art review. J Constr Eng Manag 141(6):04015008CrossRef
17.
go back to reference Wang J, Li X, Han S, Al-Hussein M (2020) Construction workers’ behaviors assessment using 3D visualization and fuzzy logic method. In: International Conference on Construction and Real Estate Management (ICCREM) 2020: intelligent construction and sustainable buildings, Stockholm, Sweden, ASCE, pp 47–54 Wang J, Li X, Han S, Al-Hussein M (2020) Construction workers’ behaviors assessment using 3D visualization and fuzzy logic method. In: International Conference on Construction and Real Estate Management (ICCREM) 2020: intelligent construction and sustainable buildings, Stockholm, Sweden, ASCE, pp 47–54
18.
go back to reference Wang J, Han S, Li X (2021) 3D fuzzy ergonomic analysis for rapid workplace design and modification in construction. Autom Constr 123:103521 Wang J, Han S, Li X (2021) 3D fuzzy ergonomic analysis for rapid workplace design and modification in construction. Autom Constr 123:103521
19.
go back to reference Zandin KB (1980) MOST work measurement systems. Marcel Dekker, New York Zandin KB (1980) MOST work measurement systems. Marcel Dekker, New York
Metadata
Title
Automated Ergonomics-Based Productivity Analysis for Intelligent Manufacturing in Industrialized Construction
Authors
Jingwen Wang
Yomna Mohamed
SangHyeok Han
Xinming Li
Mohamed Al-Hussein
Copyright Year
2023
Publisher
Springer Nature Singapore
DOI
https://doi.org/10.1007/978-981-19-0968-9_26