Skip to main content
Top
Published in: Evolutionary Intelligence 3/2020

17-10-2019 | Research Paper

Comparisons of metaheuristic algorithms for unrelated parallel machine weighted earliness/tardiness scheduling problems

Author: Oğuzhan Ahmet Arık

Published in: Evolutionary Intelligence | Issue 3/2020

Log in

Activate our intelligent search to find suitable subject content or patents.

search-config
loading …

Abstract

This paper investigates unrelated parallel machine scheduling problems where the objectives are to minimize total weighted sum of earliness/tardiness costs. Three different metaheuristic algorithms are compared with others to determine what kind (swarm intelligence based, evolutionary or single solution) of metaheuristics is effective to solve these problems. In this study, artificial bee colony (ABC), genetic algorithm and simulated annealing algorithm are chosen as swarm intelligence based algorithm, evolutionary algorithm and single solution algorithm. All proposed algorithms are created without modification in order to determine effectiveness of these metaheuristics. Experimental results show that ABC outperforms its opponents in view of solution quality as swarm intelligence based metaheuristic algorithm.

Dont have a licence yet? Then find out more about our products and how to get one now:

Springer Professional "Wirtschaft+Technik"

Online-Abonnement

Mit Springer Professional "Wirtschaft+Technik" erhalten Sie Zugriff auf:

  • über 102.000 Bücher
  • über 537 Zeitschriften

aus folgenden Fachgebieten:

  • Automobil + Motoren
  • Bauwesen + Immobilien
  • Business IT + Informatik
  • Elektrotechnik + Elektronik
  • Energie + Nachhaltigkeit
  • Finance + Banking
  • Management + Führung
  • Marketing + Vertrieb
  • Maschinenbau + Werkstoffe
  • Versicherung + Risiko

Jetzt Wissensvorsprung sichern!

Springer Professional "Technik"

Online-Abonnement

Mit Springer Professional "Technik" erhalten Sie Zugriff auf:

  • über 67.000 Bücher
  • über 390 Zeitschriften

aus folgenden Fachgebieten:

  • Automobil + Motoren
  • Bauwesen + Immobilien
  • Business IT + Informatik
  • Elektrotechnik + Elektronik
  • Energie + Nachhaltigkeit
  • Maschinenbau + Werkstoffe




 

Jetzt Wissensvorsprung sichern!

Springer Professional "Wirtschaft"

Online-Abonnement

Mit Springer Professional "Wirtschaft" erhalten Sie Zugriff auf:

  • über 67.000 Bücher
  • über 340 Zeitschriften

aus folgenden Fachgebieten:

  • Bauwesen + Immobilien
  • Business IT + Informatik
  • Finance + Banking
  • Management + Führung
  • Marketing + Vertrieb
  • Versicherung + Risiko




Jetzt Wissensvorsprung sichern!

Literature
3.
go back to reference Yang Y-J, Liu M, Wu C (2001) Evolutionary strategy method for parallel machine earliness/tardiness scheduling problem with common due date. Tien Tzu Hsueh Pao/Acta Electron Sin 29:1478–1481 Yang Y-J, Liu M, Wu C (2001) Evolutionary strategy method for parallel machine earliness/tardiness scheduling problem with common due date. Tien Tzu Hsueh Pao/Acta Electron Sin 29:1478–1481
14.
go back to reference Awasthi A, Lässig J, Kramer O (2014) Common due-date problem: exact polynomial algorithms for a given job sequence. In: Proceedings - 15th international symposium on symbolic and numeric algorithms for scientific computing, SYNASC 2013, 2014, pp 258–264 Awasthi A, Lässig J, Kramer O (2014) Common due-date problem: exact polynomial algorithms for a given job sequence. In: Proceedings - 15th international symposium on symbolic and numeric algorithms for scientific computing, SYNASC 2013, 2014, pp 258–264
18.
go back to reference Yang Z, Wang L, Cai Y, Kimie K (2018) A polychromatic sets theory based algorithm for the input/output scheduling problem in AS/RSs. Evol Intell 12:333–340CrossRef Yang Z, Wang L, Cai Y, Kimie K (2018) A polychromatic sets theory based algorithm for the input/output scheduling problem in AS/RSs. Evol Intell 12:333–340CrossRef
20.
go back to reference Karaboga D (2005) An idea based on honey bee swarm for numerical optimization. Technical Report TR06, Engineering Faculty, Computer Engineering Department, Erciyes University Karaboga D (2005) An idea based on honey bee swarm for numerical optimization. Technical Report TR06, Engineering Faculty, Computer Engineering Department, Erciyes University
Metadata
Title
Comparisons of metaheuristic algorithms for unrelated parallel machine weighted earliness/tardiness scheduling problems
Author
Oğuzhan Ahmet Arık
Publication date
17-10-2019
Publisher
Springer Berlin Heidelberg
Published in
Evolutionary Intelligence / Issue 3/2020
Print ISSN: 1864-5909
Electronic ISSN: 1864-5917
DOI
https://doi.org/10.1007/s12065-019-00305-7

Other articles of this Issue 3/2020

Evolutionary Intelligence 3/2020 Go to the issue

Premium Partner