Skip to main content
Top

2015 | OriginalPaper | Chapter

10. Computing Resource Allocation with PEADGA

Authors : Yuanjun Laili, Fei Tao, Lin Zhang

Published in: Configurable Intelligent Optimization Algorithm

Publisher: Springer International Publishing

Activate our intelligent search to find suitable subject content or patents.

search-config
loading …

Abstract

In this chapter, for solving optimal allocation of computing resources (OACR) problem in cloud manufacturing (CMfg) [1], serial three-layer operation configuration and parallel configuration are both applied.

Dont have a licence yet? Then find out more about our products and how to get one now:

Springer Professional "Wirtschaft+Technik"

Online-Abonnement

Mit Springer Professional "Wirtschaft+Technik" erhalten Sie Zugriff auf:

  • über 102.000 Bücher
  • über 537 Zeitschriften

aus folgenden Fachgebieten:

  • Automobil + Motoren
  • Bauwesen + Immobilien
  • Business IT + Informatik
  • Elektrotechnik + Elektronik
  • Energie + Nachhaltigkeit
  • Finance + Banking
  • Management + Führung
  • Marketing + Vertrieb
  • Maschinenbau + Werkstoffe
  • Versicherung + Risiko

Jetzt Wissensvorsprung sichern!

Springer Professional "Technik"

Online-Abonnement

Mit Springer Professional "Technik" erhalten Sie Zugriff auf:

  • über 67.000 Bücher
  • über 390 Zeitschriften

aus folgenden Fachgebieten:

  • Automobil + Motoren
  • Bauwesen + Immobilien
  • Business IT + Informatik
  • Elektrotechnik + Elektronik
  • Energie + Nachhaltigkeit
  • Maschinenbau + Werkstoffe




 

Jetzt Wissensvorsprung sichern!

Springer Professional "Wirtschaft"

Online-Abonnement

Mit Springer Professional "Wirtschaft" erhalten Sie Zugriff auf:

  • über 67.000 Bücher
  • über 340 Zeitschriften

aus folgenden Fachgebieten:

  • Bauwesen + Immobilien
  • Business IT + Informatik
  • Finance + Banking
  • Management + Führung
  • Marketing + Vertrieb
  • Versicherung + Risiko




Jetzt Wissensvorsprung sichern!

Literature
1.
go back to reference Li BH, Zhang L, Wang SL, Tao F, Cao JW, Jiang XD, Song X, Chai XD (2010) Cloud manufacturing: a new service-oriented networked manufacturing model. Comput Integr Manuf Syst 16(1):1–16 Li BH, Zhang L, Wang SL, Tao F, Cao JW, Jiang XD, Song X, Chai XD (2010) Cloud manufacturing: a new service-oriented networked manufacturing model. Comput Integr Manuf Syst 16(1):1–16
2.
go back to reference Laili YJ, Tao F, Zhang L, Sarker BR (2012) A study of optimal allocation of computing resources in cloud manufacturing systems. Int J Adv Manuf Technol 63(5–8):671–690CrossRef Laili YJ, Tao F, Zhang L, Sarker BR (2012) A study of optimal allocation of computing resources in cloud manufacturing systems. Int J Adv Manuf Technol 63(5–8):671–690CrossRef
3.
go back to reference Yusuf YY, Sarhadi M, Gunasekaran A (1999) Agile manufacturing: The drivers, concepts and attributed. Int J Prod Econ 62(1–2):33–43CrossRef Yusuf YY, Sarhadi M, Gunasekaran A (1999) Agile manufacturing: The drivers, concepts and attributed. Int J Prod Econ 62(1–2):33–43CrossRef
4.
go back to reference Flammia G (2001) Application service providers: challenges and opportunities. IEEE Intell Syst Appl 16(1):22–23CrossRef Flammia G (2001) Application service providers: challenges and opportunities. IEEE Intell Syst Appl 16(1):22–23CrossRef
5.
go back to reference Tao F, Hu YF, Zhou ZD (2008) Study on manufacturing grid & its resource service optimal-selection system. Int J Adv Manuf Technol 37(9–10):1022–1041CrossRef Tao F, Hu YF, Zhou ZD (2008) Study on manufacturing grid & its resource service optimal-selection system. Int J Adv Manuf Technol 37(9–10):1022–1041CrossRef
6.
go back to reference Tao F, Zhang L, Venkatesh VC, Luo YL, Cheng Y (2011) Cloud manufacturing: a computing and service-oriented manufacturing model. Proc Inst Mech Eng, Part B, J Eng Manuf (2011, March 10, Accepted) Tao F, Zhang L, Venkatesh VC, Luo YL, Cheng Y (2011) Cloud manufacturing: a computing and service-oriented manufacturing model. Proc Inst Mech Eng, Part B, J Eng Manuf (2011, March 10, Accepted)
7.
go back to reference Zhang L, Luo LY, Tao F, Ren L, Guo H (2010) Key technologies for the construction of manufacturing cloud. Comput Integr Manuf Syst 16(11):2510–2520 Zhang L, Luo LY, Tao F, Ren L, Guo H (2010) Key technologies for the construction of manufacturing cloud. Comput Integr Manuf Syst 16(11):2510–2520
8.
go back to reference He K, Zhao Y (2005) Research of grid resource management and scheduling. J WuHan Univ Technol (Information and Management Engineering) 27(4): 1–5 He K, Zhao Y (2005) Research of grid resource management and scheduling. J WuHan Univ Technol (Information and Management Engineering) 27(4): 1–5
10.
go back to reference Zhang L, Luo YL, Fan WH, Tao F, Ren L (2011) Analysis of cloud manufacturing and related advanced manufacturing models. Comput Integr Manuf Syst 17(3):458–468 Zhang L, Luo YL, Fan WH, Tao F, Ren L (2011) Analysis of cloud manufacturing and related advanced manufacturing models. Comput Integr Manuf Syst 17(3):458–468
11.
go back to reference Li BH, Zhang L, Chai XD, Tao F, Luo YL, Wang YZ, Yin C, Huang G, Zhao XP (2011) Further discussion on cloud manufacturing. Comput Integr Manuf Syst 27(3):449–457 Li BH, Zhang L, Chai XD, Tao F, Luo YL, Wang YZ, Yin C, Huang G, Zhao XP (2011) Further discussion on cloud manufacturing. Comput Integr Manuf Syst 27(3):449–457
12.
go back to reference Tao F, Cheng Y, Zhang L, Luo YL, Ren L (2011) Cloud manufacturing. The 2nd international conference on manufacturing service and engineering (ICMSE) Tao F, Cheng Y, Zhang L, Luo YL, Ren L (2011) Cloud manufacturing. The 2nd international conference on manufacturing service and engineering (ICMSE)
13.
go back to reference Tao F, Zhang L, Luo YL, Ren L (2011) Typical characteristic of cloud manufacturing and several key issues of cloud service composition. Comput Integr Manuf Syst 17(3):477–486 Tao F, Zhang L, Luo YL, Ren L (2011) Typical characteristic of cloud manufacturing and several key issues of cloud service composition. Comput Integr Manuf Syst 17(3):477–486
14.
go back to reference Liang JJ, Pan QK, Chen TJ, Wang L (2011) Solving the blocking flow shop scheduling problem by a dynamic multi-swarm particle swarm optimizer. Int J Adv Manuf Technol 55(5–8):755–762CrossRef Liang JJ, Pan QK, Chen TJ, Wang L (2011) Solving the blocking flow shop scheduling problem by a dynamic multi-swarm particle swarm optimizer. Int J Adv Manuf Technol 55(5–8):755–762CrossRef
15.
go back to reference Zou ZM, Li CX (2006) Integrated and events-oriented job shop scheduling. Int J Adv Manuf Technol 29(5–6):551–556CrossRef Zou ZM, Li CX (2006) Integrated and events-oriented job shop scheduling. Int J Adv Manuf Technol 29(5–6):551–556CrossRef
16.
go back to reference Hu PC (2005) Minimizing total flow time for the worker assignment scheduling problem in the identical parallel-machine models. Int J Adv Manuf Technol 25(9–10):1046–1052CrossRef Hu PC (2005) Minimizing total flow time for the worker assignment scheduling problem in the identical parallel-machine models. Int J Adv Manuf Technol 25(9–10):1046–1052CrossRef
17.
go back to reference Kwok YK (1999) Benchmarking and comparison of the task graph scheduling algorithms. J Parallel Distrib Comput 59(3):381–422CrossRefMATH Kwok YK (1999) Benchmarking and comparison of the task graph scheduling algorithms. J Parallel Distrib Comput 59(3):381–422CrossRefMATH
18.
go back to reference Polychronopoulos CD (1991) The hierarchical task graph and its use in auto-scheduling. In: Proceedings of the 5th international conference on supercomputing (ICS’ 91) Polychronopoulos CD (1991) The hierarchical task graph and its use in auto-scheduling. In: Proceedings of the 5th international conference on supercomputing (ICS’ 91)
19.
20.
go back to reference Stone HS (1977) Multiprocessor scheduling with the aid of network flow algorithms. IEEE Trans Software Eng 3(1):85–93CrossRefMATH Stone HS (1977) Multiprocessor scheduling with the aid of network flow algorithms. IEEE Trans Software Eng 3(1):85–93CrossRefMATH
21.
go back to reference Madhukar M, Leuze V, Dowdy V (1995) Petri net model of a dynamically partitioned multiprocessors system. In: Proceedings of the 6th international workshop on petri nets and performance models (PNPM’ 95) Madhukar M, Leuze V, Dowdy V (1995) Petri net model of a dynamically partitioned multiprocessors system. In: Proceedings of the 6th international workshop on petri nets and performance models (PNPM’ 95)
22.
go back to reference Buyya R, Abramson D, Venugopal S (2005) The grid economy. Proc IEEE 93(3):698–714CrossRef Buyya R, Abramson D, Venugopal S (2005) The grid economy. Proc IEEE 93(3):698–714CrossRef
23.
go back to reference Cardoso J, Sheth A, Miller J, Arnold J, Kochut K (2004) Quality of service for workflows and web service processes. Web Semant: Sci Serv Agents WWW 1(3):281–308CrossRef Cardoso J, Sheth A, Miller J, Arnold J, Kochut K (2004) Quality of service for workflows and web service processes. Web Semant: Sci Serv Agents WWW 1(3):281–308CrossRef
24.
go back to reference Yang T, Gerasoulis A (1993) DSC: Scheduling parallel tasks on an unbounded number of processors. IEEE Trans Parallel Distrib Syst 5(9):951–967CrossRef Yang T, Gerasoulis A (1993) DSC: Scheduling parallel tasks on an unbounded number of processors. IEEE Trans Parallel Distrib Syst 5(9):951–967CrossRef
25.
go back to reference Gerasoulis A, Yang T (1993) On the granularity and clustering of directed acyclic task graphs. IEEE Trans Parallel Distrib Syst 4(6):686–701CrossRef Gerasoulis A, Yang T (1993) On the granularity and clustering of directed acyclic task graphs. IEEE Trans Parallel Distrib Syst 4(6):686–701CrossRef
26.
go back to reference Gerasoulis A, Yang T (1994) Performance bounds for parallelizing Gaussian-Elimination and Gauss-Jordan on message-passing machines. Applied Numerical Mathematics Journal 16:283–297CrossRefMATHMathSciNet Gerasoulis A, Yang T (1994) Performance bounds for parallelizing Gaussian-Elimination and Gauss-Jordan on message-passing machines. Applied Numerical Mathematics Journal 16:283–297CrossRefMATHMathSciNet
27.
go back to reference Jones WM, Pang LW, Ligon WB, Stanzione D (2005) Characterization of bandwidth-aware meta-schedulers for co-allocating jobs across multiple clusters. J Supercomput 34(2):135–163CrossRef Jones WM, Pang LW, Ligon WB, Stanzione D (2005) Characterization of bandwidth-aware meta-schedulers for co-allocating jobs across multiple clusters. J Supercomput 34(2):135–163CrossRef
28.
go back to reference Hamscher V, Schwiegelshohn U, Streit A, Yahyapour V (2004) Evaluation of job-scheduling strategies for grid computing. Grid Computing at the 7th International Conference on High Performance Computing 191–202 Hamscher V, Schwiegelshohn U, Streit A, Yahyapour V (2004) Evaluation of job-scheduling strategies for grid computing. Grid Computing at the 7th International Conference on High Performance Computing 191–202
29.
go back to reference Ememann C, Hamscher V, Yahyapou V (2002) On effects of machine configurations on parallel job scheduling in computational grids. In: Proceedings of the international conference on architecture of computing systems (ARCS 2002), 169–179 Ememann C, Hamscher V, Yahyapou V (2002) On effects of machine configurations on parallel job scheduling in computational grids. In: Proceedings of the international conference on architecture of computing systems (ARCS 2002), 169–179
30.
go back to reference Davidovi T, Hansen P, Mladenovi N (2005) Permutation based genetic, tabu and variable neighborhood search heuristics for multiprocessor scheduling with communication delays. Asia-Pac J Oper Res 22(3):297–326MathSciNet Davidovi T, Hansen P, Mladenovi N (2005) Permutation based genetic, tabu and variable neighborhood search heuristics for multiprocessor scheduling with communication delays. Asia-Pac J Oper Res 22(3):297–326MathSciNet
31.
go back to reference Sinnen O, Sousa LA (2005) Communication contention in task scheduling. IEEE Trans Parallel Distrib Syst 16(6):503–515CrossRef Sinnen O, Sousa LA (2005) Communication contention in task scheduling. IEEE Trans Parallel Distrib Syst 16(6):503–515CrossRef
32.
go back to reference Sinnen O, Sousa LA, Sandnes FE (2006) Toward a realistic task scheduling model. IEEE Trans Parallel Distrib Syst 17(3):263–275CrossRef Sinnen O, Sousa LA, Sandnes FE (2006) Toward a realistic task scheduling model. IEEE Trans Parallel Distrib Syst 17(3):263–275CrossRef
33.
go back to reference Benoit A, Marchal L, Pineau JF (2010) Scheduling concurrent bag-of-tasks applications on heterogeneous platforms. IEEE Trans Comput 59(2):202–217CrossRefMathSciNet Benoit A, Marchal L, Pineau JF (2010) Scheduling concurrent bag-of-tasks applications on heterogeneous platforms. IEEE Trans Comput 59(2):202–217CrossRefMathSciNet
34.
go back to reference Adam TL, Chandy KM, Dickson JR (1974) A comparison of list schedules for parallel processing systems. Commun ACM 17(12):685–690CrossRefMATH Adam TL, Chandy KM, Dickson JR (1974) A comparison of list schedules for parallel processing systems. Commun ACM 17(12):685–690CrossRefMATH
35.
go back to reference Sinnen O, Sousa LA (2004) List scheduling: Extension for contention awareness and evaluation of node priorites for heterogeneous cluster architectures. Parallel Comput 30(1):81–101CrossRef Sinnen O, Sousa LA (2004) List scheduling: Extension for contention awareness and evaluation of node priorites for heterogeneous cluster architectures. Parallel Comput 30(1):81–101CrossRef
36.
go back to reference Wu MY, Gajski DD (1990) Hypertool: a programming aid for message-passing systems. IEEE Trans Parallel Distrib Syst 1(3):330–343CrossRef Wu MY, Gajski DD (1990) Hypertool: a programming aid for message-passing systems. IEEE Trans Parallel Distrib Syst 1(3):330–343CrossRef
37.
go back to reference Sarkar V (1989) Partitioning and scheduling of parallel programs for multiprocessors. Research Monographs in Parallel Computing, MIT Press Sarkar V (1989) Partitioning and scheduling of parallel programs for multiprocessors. Research Monographs in Parallel Computing, MIT Press
38.
go back to reference Chen S, Eshaghia MM, Wu Y (1995) Mapping arbitrary non-uniform task graphs onto arbitrary non-uniform system graphs. In: Proceedings of the international conference on parallel processing Chen S, Eshaghia MM, Wu Y (1995) Mapping arbitrary non-uniform task graphs onto arbitrary non-uniform system graphs. In: Proceedings of the international conference on parallel processing
39.
go back to reference Yang L, Gohad T, Ghosh P, Sinha D, Sen D, Richa A (2005) Resource mapping and scheduling for heterogeneous network processor systems. In: Proceedings of the 2005 ACM Symposium on Architecture for Networking and Communications Systems (ANCS’ 05), 19–28 Yang L, Gohad T, Ghosh P, Sinha D, Sen D, Richa A (2005) Resource mapping and scheduling for heterogeneous network processor systems. In: Proceedings of the 2005 ACM Symposium on Architecture for Networking and Communications Systems (ANCS’ 05), 19–28
40.
go back to reference Weng N, Wolf T (2005) Profiling and mapping of parallel workloads on network processors. In: proceedings of the 20th annual ACM symposium on applied computing (sac) 890–896 Weng N, Wolf T (2005) Profiling and mapping of parallel workloads on network processors. In: proceedings of the 20th annual ACM symposium on applied computing (sac) 890–896
41.
go back to reference Huang JG, Chen JE, Chen SQ (2004) Parallel-job scheduling on cluster computing system. Chin J Comput 27(6):765–771 Huang JG, Chen JE, Chen SQ (2004) Parallel-job scheduling on cluster computing system. Chin J Comput 27(6):765–771
42.
go back to reference Huang JG (2008) Approximation algorithm on multi-processor job scheduling. Comput Eng Appl 44(32):26–28 Huang JG (2008) Approximation algorithm on multi-processor job scheduling. Comput Eng Appl 44(32):26–28
43.
go back to reference Yin GF, Luo Y, Long HN, Cheng EJ (2004) Genetic algorithms for subtask scheduling in concurrent design. J Comput aided Des Comput Graph 16(8): 1122–1126 Yin GF, Luo Y, Long HN, Cheng EJ (2004) Genetic algorithms for subtask scheduling in concurrent design. J Comput aided Des Comput Graph 16(8): 1122–1126
44.
go back to reference Correa RC, Ferreira A, Rebreyend P (1999) Scheduling multiprocessor tasks with genetic algorithms. IEEE Trans Parallel Distrib Syst 10(8):825–837CrossRef Correa RC, Ferreira A, Rebreyend P (1999) Scheduling multiprocessor tasks with genetic algorithms. IEEE Trans Parallel Distrib Syst 10(8):825–837CrossRef
45.
go back to reference Tsai JT, Liu TK, Ho WH, Chou JH (2008) An improved genetic algorithm for job-shop scheduling problems using taguchi-based crossover. Int J Adv Manuf Technol 38(9–10):987–994CrossRef Tsai JT, Liu TK, Ho WH, Chou JH (2008) An improved genetic algorithm for job-shop scheduling problems using taguchi-based crossover. Int J Adv Manuf Technol 38(9–10):987–994CrossRef
46.
go back to reference Chen YW, Lu YZ, Yang GK (2008) Hybrid evolutionary algorithm with marriage of genetic algorithm and extremal optimization for production scheduling. Int J Adv Manuf Technol 36(9–10):959–968CrossRef Chen YW, Lu YZ, Yang GK (2008) Hybrid evolutionary algorithm with marriage of genetic algorithm and extremal optimization for production scheduling. Int J Adv Manuf Technol 36(9–10):959–968CrossRef
47.
go back to reference Wang G, Gong WR, DeRenzi B, Kastner R (2007) Ant colony optimizations for resource and timing constrained operation scheduling. IEEE Trans Comput Aided Des Integr Circuits Syst 26(6):1010–1029CrossRef Wang G, Gong WR, DeRenzi B, Kastner R (2007) Ant colony optimizations for resource and timing constrained operation scheduling. IEEE Trans Comput Aided Des Integr Circuits Syst 26(6):1010–1029CrossRef
48.
go back to reference Chen WN, Zhang J (2009) An ant colony optimization approach to a grid workflow scheduling problem with various QoS requirements. IEEE Trans Syst Man Cyber 39(1):29–43 Chen WN, Zhang J (2009) An ant colony optimization approach to a grid workflow scheduling problem with various QoS requirements. IEEE Trans Syst Man Cyber 39(1):29–43
49.
go back to reference Li JQ, Pan QK, Gao KZ (2011) Pareto-based discrete artificial bee colony algorithm for multi-objective flexible job shop scheduling problems. Int J Adv Manuf Technol 55(9–12):1159–1169CrossRef Li JQ, Pan QK, Gao KZ (2011) Pareto-based discrete artificial bee colony algorithm for multi-objective flexible job shop scheduling problems. Int J Adv Manuf Technol 55(9–12):1159–1169CrossRef
50.
go back to reference Xu XD, Li CX (2007) Research on immune genetic algorithm for solving the job-shop scheduling problem. Int J Adv Manuf Technol 34(7–8):783–789CrossRef Xu XD, Li CX (2007) Research on immune genetic algorithm for solving the job-shop scheduling problem. Int J Adv Manuf Technol 34(7–8):783–789CrossRef
51.
go back to reference Agarwal R, Tiwari MK, Mukherjee SK (2007) Artificial immune system based approach for solving resource constraint project scheduling problem. Int J Adv Manuf Technol 34(5–6):584–593CrossRef Agarwal R, Tiwari MK, Mukherjee SK (2007) Artificial immune system based approach for solving resource constraint project scheduling problem. Int J Adv Manuf Technol 34(5–6):584–593CrossRef
52.
go back to reference Saravanan M, Haq AN (2008) Evaluation of scatter-search approach for scheduling optimization of flexible manufacturing systems. Int J Adv Manuf Technol 38(9–10):978–986CrossRef Saravanan M, Haq AN (2008) Evaluation of scatter-search approach for scheduling optimization of flexible manufacturing systems. Int J Adv Manuf Technol 38(9–10):978–986CrossRef
53.
go back to reference Laha D, Chakraborty UK (2008) An efficient heuristic approach to total flowtime minimization in permutation flow shop scheduling. Int J Adv Manuf Technol 38(9–10):1018–1025CrossRef Laha D, Chakraborty UK (2008) An efficient heuristic approach to total flowtime minimization in permutation flow shop scheduling. Int J Adv Manuf Technol 38(9–10):1018–1025CrossRef
54.
go back to reference Maheswaran R, Ponnambalam SG, Aravindan C (2005) A meta-heuristic approach to single machine scheduling problems. Int J Adv Manuf Technol 25(7–8):772–776CrossRef Maheswaran R, Ponnambalam SG, Aravindan C (2005) A meta-heuristic approach to single machine scheduling problems. Int J Adv Manuf Technol 25(7–8):772–776CrossRef
55.
go back to reference Zhang JX, Gu ZM, Zheng C (2010) Survey of research progress on cloud computing. Appl Research Comput 27(2): 429–433 Zhang JX, Gu ZM, Zheng C (2010) Survey of research progress on cloud computing. Appl Research Comput 27(2): 429–433
56.
go back to reference Hong B, Prasanna VK (2004) Distributed adaptive task allocation in heterogeneous computing environments to maximize throughput. In: Proceedings of the 18th international parallel and distributed processing symposium (IPDPS’ 04) Hong B, Prasanna VK (2004) Distributed adaptive task allocation in heterogeneous computing environments to maximize throughput. In: Proceedings of the 18th international parallel and distributed processing symposium (IPDPS’ 04)
57.
go back to reference Bhat PB, Raghavendra CS, Prasanna VK (2003) Efficient collective communication in distributed heterogeneous systems. J Parallel Distrib Comput 63(3):251–263CrossRefMATH Bhat PB, Raghavendra CS, Prasanna VK (2003) Efficient collective communication in distributed heterogeneous systems. J Parallel Distrib Comput 63(3):251–263CrossRefMATH
58.
go back to reference Gawiejnowics S (2008) Time-dependent scheduling. Springer, Berlin Gawiejnowics S (2008) Time-dependent scheduling. Springer, Berlin
59.
go back to reference Wang L, Pan J, Jiao LC (2000) The immune programming. Chin J Comput 23(8): 806–812 Wang L, Pan J, Jiao LC (2000) The immune programming. Chin J Comput 23(8): 806–812
60.
go back to reference Wang L, Pan J, Jiao LC (2000). The immune algorithm. Acta Electronica Sinica, 28(7): 74–77 Wang L, Pan J, Jiao LC (2000). The immune algorithm. Acta Electronica Sinica, 28(7): 74–77
61.
go back to reference Park J, Kang M, Lee K (1996) An intelligent operations scheduling system in a job shop. Int J Adv Manuf Technol 11(2):111–119CrossRef Park J, Kang M, Lee K (1996) An intelligent operations scheduling system in a job shop. Int J Adv Manuf Technol 11(2):111–119CrossRef
62.
go back to reference Jiao LM, Khoo LP, Chen CH (2004) An intelligent concurrent design task planner for manufacturing system. Int J Adv Manuf Technol 23(9–10):672–681CrossRef Jiao LM, Khoo LP, Chen CH (2004) An intelligent concurrent design task planner for manufacturing system. Int J Adv Manuf Technol 23(9–10):672–681CrossRef
63.
go back to reference Chaudhry IA, Drake PR (2009) Minimizing total tardiness for the machine scheduling and worker assignment problems in identical parallel machines using genetic algorithms. Int J Adv Manuf Technol 42(5–6):581–594CrossRef Chaudhry IA, Drake PR (2009) Minimizing total tardiness for the machine scheduling and worker assignment problems in identical parallel machines using genetic algorithms. Int J Adv Manuf Technol 42(5–6):581–594CrossRef
64.
go back to reference Saravanan M, Haq AN (2008) Evaluation of scatter-search approach for scheduling optimization of flexible manufacturing systems. Int J Adv Manuf Technol 38(9–10):978–986CrossRef Saravanan M, Haq AN (2008) Evaluation of scatter-search approach for scheduling optimization of flexible manufacturing systems. Int J Adv Manuf Technol 38(9–10):978–986CrossRef
65.
go back to reference Wang LY, Wang JB, Gao WJ, Huang X, Feng EM (2010) Two single-machine scheduling problems with the effects of deterioration and learning. Int J Adv Manuf Technol 46(5–8):715–720CrossRef Wang LY, Wang JB, Gao WJ, Huang X, Feng EM (2010) Two single-machine scheduling problems with the effects of deterioration and learning. Int J Adv Manuf Technol 46(5–8):715–720CrossRef
66.
go back to reference Jerald J, Asokan P, Saravanan R, Delphin R, Rani C (2006) Simultaneous scheduling of parts and automated guided vehicles in an FMS environment using adaptive genetic algorithm. Int J Adv Manuf Technol 29(5–6):584–589CrossRef Jerald J, Asokan P, Saravanan R, Delphin R, Rani C (2006) Simultaneous scheduling of parts and automated guided vehicles in an FMS environment using adaptive genetic algorithm. Int J Adv Manuf Technol 29(5–6):584–589CrossRef
67.
go back to reference Shukla SK, Son YJ, Tiwari MK (2008) Fuzzy-based adaptive sample-sort simulated annealing for resource-constrained project scheduling. Int J Adv Manuf Technol 36(9–10):982–995CrossRef Shukla SK, Son YJ, Tiwari MK (2008) Fuzzy-based adaptive sample-sort simulated annealing for resource-constrained project scheduling. Int J Adv Manuf Technol 36(9–10):982–995CrossRef
Metadata
Title
Computing Resource Allocation with PEADGA
Authors
Yuanjun Laili
Fei Tao
Lin Zhang
Copyright Year
2015
DOI
https://doi.org/10.1007/978-3-319-08840-2_10

Premium Partner