Consideration of sustainable development principles in ultimate pit limit design

Authors: Nabiollah Adibi, Majid Ataee-pour

Published in: Environmental Earth Sciences | Issue 6/2015

Log in

Activate our intelligent search to find suitable subject content or patents.

search-config
loading …

Abstract

Sustainable development is a concept that was introduced almost at the end of the twentieth century and quickly entered the literature. In recent years, the concept of sustainability and sustainable development (SD) has been successfully extended to mineral resources, but there have been few attempts to consider this concept in the ultimate pit limit (UPL) design. The problem of UPL determination is the first step in the open pit mine design and planning process. There are several mathematical, heuristic and meta-heuristic algorithms to determine UPL. The objective function in these algorithms is the maximization of total profit. Few models integrated some aspects of mining reclamation benefit and cost in the UPL design. However, there is not any comprehensive method for UPL design based on SD considerations. This paper provides a model for UPL designing based on SD indicators. According to this model, it is possible to integrate the SD principles in UPL design. The proposed model is explained by a simple 2D example and applied in an iron mine as a case study. Generally, using SD principles in UPL design may lead to a larger UPL than traditional method (profit maximization). The suggested method is appropriate for those ore bodies with no underground option. In cases with the underground option, before applying the suggested method, the transition level from surface to underground shall be determined.

Dont have a licence yet? Then find out more about our products and how to get one now:

Springer Professional "Wirtschaft+Technik"

Online-Abonnement

Mit Springer Professional "Wirtschaft+Technik" erhalten Sie Zugriff auf:

  • über 102.000 Bücher
  • über 537 Zeitschriften

aus folgenden Fachgebieten:

  • Automobil + Motoren
  • Bauwesen + Immobilien
  • Business IT + Informatik
  • Elektrotechnik + Elektronik
  • Energie + Nachhaltigkeit
  • Finance + Banking
  • Management + Führung
  • Marketing + Vertrieb
  • Maschinenbau + Werkstoffe
  • Versicherung + Risiko

Jetzt Wissensvorsprung sichern!

Springer Professional "Technik"

Online-Abonnement

Mit Springer Professional "Technik" erhalten Sie Zugriff auf:

  • über 67.000 Bücher
  • über 390 Zeitschriften

aus folgenden Fachgebieten:

  • Automobil + Motoren
  • Bauwesen + Immobilien
  • Business IT + Informatik
  • Elektrotechnik + Elektronik
  • Energie + Nachhaltigkeit
  • Maschinenbau + Werkstoffe




 

Jetzt Wissensvorsprung sichern!

Appendix
Available only for authorised users
Literature
go back to reference Amankwah H (2011) Mathematical optimization models and methods for open-pit mining. Linköping Studies in Science and Technology, Dissertations No. 1396, Linköping University Amankwah H (2011) Mathematical optimization models and methods for open-pit mining. Linköping Studies in Science and Technology, Dissertations No. 1396, Linköping University
go back to reference Ataee-pour M, Rahmanpour M, Adibee N (2012) Ultimate pit limit optimization with simultaneous maximization of profit and ore content. In: 4th Iranian mining engineering conference, Tehran University, Iran, pp 145–151 Ataee-pour M, Rahmanpour M, Adibee N (2012) Ultimate pit limit optimization with simultaneous maximization of profit and ore content. In: 4th Iranian mining engineering conference, Tehran University, Iran, pp 145–151
go back to reference Burgher EK, Erickson E (1984) The optimization of coal mine production schedules using linear programming: an example that determines the effects of reclamation costs and interest rates. Min Sci Technol 2:69–78. doi:10.1016/S0167-9031(84)90223-8 CrossRef Burgher EK, Erickson E (1984) The optimization of coal mine production schedules using linear programming: an example that determines the effects of reclamation costs and interest rates. Min Sci Technol 2:69–78. doi:10.​1016/​S0167-9031(84)90223-8 CrossRef
go back to reference Coccetta L, Kelsey PJ (2001) Models for mine site rehabilitation. In: International conference on models and simulation, pp 2155–2160 Coccetta L, Kelsey PJ (2001) Models for mine site rehabilitation. In: International conference on models and simulation, pp 2155–2160
go back to reference Craynon J, Karmis M (2011) Optimizing coal mine design for sustainable development at large surface coal mining operations in Appalachia. 5th international conference on sustainable development indicators in the mineral industry (SDIMI). Aachen, Germany, pp 75–82 Craynon J, Karmis M (2011) Optimizing coal mine design for sustainable development at large surface coal mining operations in Appalachia. 5th international conference on sustainable development indicators in the mineral industry (SDIMI). Aachen, Germany, pp 75–82
go back to reference Dogan T, Bascetin A, Sertabipoglu Z (2009) The effects of changing block size on ore quality control and environmental impacts. 8th international Symposium on Mine Planning and Equipment Selection (MPES). Alberta, Canada, pp 301–310 Dogan T, Bascetin A, Sertabipoglu Z (2009) The effects of changing block size on ore quality control and environmental impacts. 8th international Symposium on Mine Planning and Equipment Selection (MPES). Alberta, Canada, pp 301–310
go back to reference Gholamnejad J (2009) Incorporation of rehabilitation cost into the optimum cut-off grade determination. J South Afr Inst Min Metall 108:89–94 Gholamnejad J (2009) Incorporation of rehabilitation cost into the optimum cut-off grade determination. J South Afr Inst Min Metall 108:89–94
go back to reference Gholamnejad J, Mojahedfar AR (2010) Determination of the largest pit with the non-negative net profit in the open pit mines. J Min Environ 2(1):45–52 Gholamnejad J, Mojahedfar AR (2010) Determination of the largest pit with the non-negative net profit in the open pit mines. J Min Environ 2(1):45–52
go back to reference King BM (1998) Impact of rehabilitation and closure costs on production rate and cut-off grade strategy. In: Conference on application of computers and operations research in the mineral industry (APCOM), London, UK, pp 617–629 King BM (1998) Impact of rehabilitation and closure costs on production rate and cut-off grade strategy. In: Conference on application of computers and operations research in the mineral industry (APCOM), London, UK, pp 617–629
go back to reference Lerchs H, Grossmann IF (1965) Optimum design of open-pit mines. Trans Can Inst Min Metall 68:17–24 Lerchs H, Grossmann IF (1965) Optimum design of open-pit mines. Trans Can Inst Min Metall 68:17–24
go back to reference Mehrabi B, Karimi B (2004) Jalalabad iron deposit; example of hydrothermal iron deposit. In: Proceedings of 22nd geoscience symposium of Iran, Tehran, pp 125–134 Mehrabi B, Karimi B (2004) Jalalabad iron deposit; example of hydrothermal iron deposit. In: Proceedings of 22nd geoscience symposium of Iran, Tehran, pp 125–134
go back to reference O’Hara TA, Suboleski CS (1992) Costs and cost estimation. In: SME mining engineering handbook, 2nd edn, vol 1, Chap 6.3. Society for Mining, Metallurgy, and Exploration, United State pp 405–424 O’Hara TA, Suboleski CS (1992) Costs and cost estimation. In: SME mining engineering handbook, 2nd edn, vol 1, Chap 6.3. Society for Mining, Metallurgy, and Exploration, United State pp 405–424
go back to reference Rashidinejad F, Osanloo M, Rezai B (2008a) An environmental oriented model for optimum cut-off grades in open pit mining projects to minimize acid mine drainage. Int J Environ Sci Technol 5(2):183–194. doi:10.1007/BF03326012 CrossRef Rashidinejad F, Osanloo M, Rezai B (2008a) An environmental oriented model for optimum cut-off grades in open pit mining projects to minimize acid mine drainage. Int J Environ Sci Technol 5(2):183–194. doi:10.​1007/​BF03326012 CrossRef
go back to reference Rashidinejad F, Osanloo M, Rezai B (2008b) Cutoff Grades optimization with environmental management; a case study: Sungun copper project. IUST Int J Eng Sci 19(5–1):1–13 Rashidinejad F, Osanloo M, Rezai B (2008b) Cutoff Grades optimization with environmental management; a case study: Sungun copper project. IUST Int J Eng Sci 19(5–1):1–13
Metadata
Title
Consideration of sustainable development principles in ultimate pit limit design
Authors
Nabiollah Adibi
Majid Ataee-pour
Publication date
01-09-2015
Publisher
Springer Berlin Heidelberg
Published in
Environmental Earth Sciences / Issue 6/2015
Print ISSN: 1866-6280
Electronic ISSN: 1866-6299
DOI
https://doi.org/10.1007/s12665-015-4434-3

Other articles of this Issue 6/2015

Environmental Earth Sciences 6/2015 Go to the issue