Skip to main content
Top
Published in: Cluster Computing 3/2019

26-02-2018

Constrained short-term and long-term multi-objective production optimization using general stochastic approximation algorithm

Authors: Hui Zhao, Yu Zhang, Lin Cao, Xiaodong Kang, Xiaoqing Xie

Published in: Cluster Computing | Special Issue 3/2019

Log in

Activate our intelligent search to find suitable subject content or patents.

search-config
loading …

Abstract

In the water flooding reservoir management, engineers aim to make an optimal production strategy to maximize both the net present value (NPV) in life-cycle and the short-term NPV. Previous researches of multi-objective optimization of long-term and short-term find that the short-term production optimization decreases the long-term NPV and the gradient calculation using adjoint gradient is hard to be applied. Therefore, we implement a multi-objective optimization method in which the long-term NPV is lumped into the short-term objective function as a constraint in order not to decrease the life-cycle NPV, linear and nonlinear constraints are lumped into the augmented Lagrangian objective function. Also, we propose a new gradient-free algorithm general stochastic approximation algorithm (GSA) to obtain the better approximate gradient. We proved that the research direction of GSA algorithm is always uphill, the simultaneous perturbation stochastic approximation algorithm (SPSA) and the ensemble-based optimization algorithm (EnOpt) are also two special forms of GSA algorithm. Toy problem results show that GSA has a more efficient approximation gradient than SPSA. Optimization results of a 2D reservoir show that the increase of the long-term NPV is about 86.5% and the increase of the short-term NPV is about 18.8%. The field case of Brugge field also shows that the long-term and short-term NPV increase by 64.7 and 48.9%.

Dont have a licence yet? Then find out more about our products and how to get one now:

Springer Professional "Wirtschaft+Technik"

Online-Abonnement

Mit Springer Professional "Wirtschaft+Technik" erhalten Sie Zugriff auf:

  • über 102.000 Bücher
  • über 537 Zeitschriften

aus folgenden Fachgebieten:

  • Automobil + Motoren
  • Bauwesen + Immobilien
  • Business IT + Informatik
  • Elektrotechnik + Elektronik
  • Energie + Nachhaltigkeit
  • Finance + Banking
  • Management + Führung
  • Marketing + Vertrieb
  • Maschinenbau + Werkstoffe
  • Versicherung + Risiko

Jetzt Wissensvorsprung sichern!

Springer Professional "Technik"

Online-Abonnement

Mit Springer Professional "Technik" erhalten Sie Zugriff auf:

  • über 67.000 Bücher
  • über 390 Zeitschriften

aus folgenden Fachgebieten:

  • Automobil + Motoren
  • Bauwesen + Immobilien
  • Business IT + Informatik
  • Elektrotechnik + Elektronik
  • Energie + Nachhaltigkeit
  • Maschinenbau + Werkstoffe




 

Jetzt Wissensvorsprung sichern!

Springer Professional "Wirtschaft"

Online-Abonnement

Mit Springer Professional "Wirtschaft" erhalten Sie Zugriff auf:

  • über 67.000 Bücher
  • über 340 Zeitschriften

aus folgenden Fachgebieten:

  • Bauwesen + Immobilien
  • Business IT + Informatik
  • Finance + Banking
  • Management + Führung
  • Marketing + Vertrieb
  • Versicherung + Risiko




Jetzt Wissensvorsprung sichern!

Literature
1.
go back to reference Jansen, J., S. Douma., D. Brouwer., P. V. den Hof, Heemink, A.: close-loop reservoir management. In: Proceedings of the SPE Reservoir Simulation Symposium, 2–4 Feb 2009 Jansen, J., S. Douma., D. Brouwer., P. V. den Hof, Heemink, A.: close-loop reservoir management. In: Proceedings of the SPE Reservoir Simulation Symposium, 2–4 Feb 2009
2.
go back to reference Wang, C., Li, G., Reynolds, A.C.: Production optimization in closed-loop reservoir management. In: Proceedings of the SPE Society of Petroleum Engineers, 1 September 2009 Wang, C., Li, G., Reynolds, A.C.: Production optimization in closed-loop reservoir management. In: Proceedings of the SPE Society of Petroleum Engineers, 1 September 2009
3.
go back to reference Chen, C., Li, G., Reynolds, A.: Close-loop reservoir management on the Brugge test case. Comput. Geoscience. 14(4), 691–703 (2010)CrossRef Chen, C., Li, G., Reynolds, A.: Close-loop reservoir management on the Brugge test case. Comput. Geoscience. 14(4), 691–703 (2010)CrossRef
4.
go back to reference Zhao, H., Chen, C., Do, S.T., Li, G., Reynolds, A.C.: Maximization of a dynamic quadratic interpolation model for production optimization. In: Paper SPE 141317 Presented at Society of Petroleum Engineers, 1 January 2011 Zhao, H., Chen, C., Do, S.T., Li, G., Reynolds, A.C.: Maximization of a dynamic quadratic interpolation model for production optimization. In: Paper SPE 141317 Presented at Society of Petroleum Engineers, 1 January 2011
5.
go back to reference Zhao, H., Li, Y., Yao, J., Zhang, K.: Theoretical research on reservoir closed-loop production management. Sci. China Tech. Sci. 54(10), 2815–2824 (2011)CrossRef Zhao, H., Li, Y., Yao, J., Zhang, K.: Theoretical research on reservoir closed-loop production management. Sci. China Tech. Sci. 54(10), 2815–2824 (2011)CrossRef
6.
go back to reference Pinto, M.A.S., Ghasemi, M., Sorek, N., Gildin, E., Schiozer, D.J.: Hybrid Optimization For Closed-Loop Reservoir Management. Society of Petroleum Engineers, Richardson (2015)CrossRef Pinto, M.A.S., Ghasemi, M., Sorek, N., Gildin, E., Schiozer, D.J.: Hybrid Optimization For Closed-Loop Reservoir Management. Society of Petroleum Engineers, Richardson (2015)CrossRef
7.
go back to reference Van Essen, G.M., van den Hof, P.M.J., Jansen, J.D.: Hierarchical long term and short term production optimization. In: Proceedings of the SPE Annual Technical Conference and Exhibition, 1 Jan 2009 Van Essen, G.M., van den Hof, P.M.J., Jansen, J.D.: Hierarchical long term and short term production optimization. In: Proceedings of the SPE Annual Technical Conference and Exhibition, 1 Jan 2009
8.
go back to reference Van Essen, G., van den Hof, P., Jansen, J.-D.: Hierarchical long-term and short-term production optimization. SPE J. 16(1), 191–199 (2011)CrossRef Van Essen, G., van den Hof, P., Jansen, J.-D.: Hierarchical long-term and short-term production optimization. SPE J. 16(1), 191–199 (2011)CrossRef
9.
go back to reference Conn, A.R., Gould, N.I.M., Toint, P.L.: LANCELOT: A fortran package for large-scale nonlinear optimization (Release A), No.17. Berlin: Springer Series in Computational Mathematics, Springer-Verlag (1992) Conn, A.R., Gould, N.I.M., Toint, P.L.: LANCELOT: A fortran package for large-scale nonlinear optimization (Release A), No.17. Berlin: Springer Series in Computational Mathematics, Springer-Verlag (1992)
10.
go back to reference Byrd, R.H., Lu, P., Nocedal, J., Zhu, C.: A Limited memory algorithm for bound constrained optimization. SIAM J. Sci. Comput. 16(5), 1190–1208 (1995)MathSciNetCrossRef Byrd, R.H., Lu, P., Nocedal, J., Zhu, C.: A Limited memory algorithm for bound constrained optimization. SIAM J. Sci. Comput. 16(5), 1190–1208 (1995)MathSciNetCrossRef
11.
go back to reference Nocedal, J., Wright, S.J.: Numerical Optimization. Springer, New York (1999)CrossRef Nocedal, J., Wright, S.J.: Numerical Optimization. Springer, New York (1999)CrossRef
12.
go back to reference Aanonsen, S.I., Doublet, D., Tai, X.-C.: Efficient history matching and production optimization with the augmented lagrangian method. In: Proceedings of the SPE Reservoir Simulation Symposium, 1 Jan 2007 Aanonsen, S.I., Doublet, D., Tai, X.-C.: Efficient history matching and production optimization with the augmented lagrangian method. In: Proceedings of the SPE Reservoir Simulation Symposium, 1 Jan 2007
13.
go back to reference Chen, C., Wang, Y., Li, G., Reynolds, A.: Closed-loop reservoir management on the Brugge test case. Comput. Geosci. 14(4), 691–703 (2010)CrossRef Chen, C., Wang, Y., Li, G., Reynolds, A.: Closed-loop reservoir management on the Brugge test case. Comput. Geosci. 14(4), 691–703 (2010)CrossRef
14.
go back to reference Chen, C., Li, G., Reynolds, A.: Robust constrained optimization of short- and long-term net present value for closed-loop reservoir management. In: Paper SPE141314 Presented at Society of Petroleum Engineers, 1 Sept2012 Chen, C., Li, G., Reynolds, A.: Robust constrained optimization of short- and long-term net present value for closed-loop reservoir management. In: Paper SPE141314 Presented at Society of Petroleum Engineers, 1 Sept2012
15.
go back to reference Zhao, H., Tang, Y. W., Li, Y. et al. Reservoir production optimization using general stochastic approximate algorithm under the mixed-linear-nonlinear constraints. J. Resid. Sci. Technol. 13(8) (2016) Zhao, H., Tang, Y. W., Li, Y. et al. Reservoir production optimization using general stochastic approximate algorithm under the mixed-linear-nonlinear constraints. J. Resid. Sci. Technol. 13(8) (2016)
16.
go back to reference Brouwer, D., Jansen, J.: Dynamic optimization of water flooding with smart wells using optimal control theory. SPE J. 9(4), 391–402 (2009)CrossRef Brouwer, D., Jansen, J.: Dynamic optimization of water flooding with smart wells using optimal control theory. SPE J. 9(4), 391–402 (2009)CrossRef
17.
go back to reference Romero, C., Carter, J., Gringarten, A., Zimmerman, R.: A modified genetic algorithm for reservoir characterization. In: Paper SPE 64765 presented at the International Oil and Gas Conference and Exhibition in China. 1 Jan 2000 Romero, C., Carter, J., Gringarten, A., Zimmerman, R.: A modified genetic algorithm for reservoir characterization. In: Paper SPE 64765 presented at the International Oil and Gas Conference and Exhibition in China. 1 Jan 2000
18.
go back to reference Montes, G., Bartolome, P., Udias, A.: The use of genetic algorithms in well placement optimiaziton. In: Paper SPE 69439 presented at the SPE Latin American and Caribbean Petroleum Engineering Conference. 1 Jan 2001 Montes, G., Bartolome, P., Udias, A.: The use of genetic algorithms in well placement optimiaziton. In: Paper SPE 69439 presented at the SPE Latin American and Caribbean Petroleum Engineering Conference. 1 Jan 2001
19.
go back to reference Yeten, B.: Optimum deployment of nonconventional wells. PhD thesis, Department of Petroleum Engineering (2003) Yeten, B.: Optimum deployment of nonconventional wells. PhD thesis, Department of Petroleum Engineering (2003)
20.
go back to reference Emerick, A.A., Silva, E., Messer, B., Almeida, L., Szwarcman, D., Pacheco, M., Vellasco, M.: Well placement optimization using a genetic algorithm with nonlinear constraints. In: Paper SPE 18808 presented at the SPE Reservoir Simulation Symposium, 2–4 Feb 2009 Emerick, A.A., Silva, E., Messer, B., Almeida, L., Szwarcman, D., Pacheco, M., Vellasco, M.: Well placement optimization using a genetic algorithm with nonlinear constraints. In: Paper SPE 18808 presented at the SPE Reservoir Simulation Symposium, 2–4 Feb 2009
21.
go back to reference Parsopoulos, K., Vrahatis, M.: Recent approaches to global optimization problems 36 through particle swarm optimization. Nat. Comput. 1, 235–306 (2002)MathSciNetCrossRef Parsopoulos, K., Vrahatis, M.: Recent approaches to global optimization problems 36 through particle swarm optimization. Nat. Comput. 1, 235–306 (2002)MathSciNetCrossRef
22.
go back to reference Onwunalu, J.E.: Optimization of field development using particle swarm optimization and new well pattern optimization. PhD thesis, Department of Energy Resources Engineering, Stanford University (2002) Onwunalu, J.E.: Optimization of field development using particle swarm optimization and new well pattern optimization. PhD thesis, Department of Energy Resources Engineering, Stanford University (2002)
24.
go back to reference Deutsch, C.V., Journel, A.G.: The application of simulated annealing to stochastic 5 reservoir modeling. SPE Adv. Tech. Ser. 2(2), 222–227 (1994)CrossRef Deutsch, C.V., Journel, A.G.: The application of simulated annealing to stochastic 5 reservoir modeling. SPE Adv. Tech. Ser. 2(2), 222–227 (1994)CrossRef
25.
go back to reference Beckner, B., Song, X.: Field development planning using simulated annealing-optimal economic well scheduling and placement. In: Paper SPE 30650 Presented at the SPE Annual Technical Conference and Exhibition Dallas (1995) Beckner, B., Song, X.: Field development planning using simulated annealing-optimal economic well scheduling and placement. In: Paper SPE 30650 Presented at the SPE Annual Technical Conference and Exhibition Dallas (1995)
27.
go back to reference Walton, S., Hassan, O., Morgan, K., Brown, M.R.: Modified cuckoo search: a new gradient free optimization algorithm. Chaos Solitons Fract. 44, 710–718 (2011)CrossRef Walton, S., Hassan, O., Morgan, K., Brown, M.R.: Modified cuckoo search: a new gradient free optimization algorithm. Chaos Solitons Fract. 44, 710–718 (2011)CrossRef
28.
go back to reference Wang, C., Li, G., Reynolds A.C.: Production optimization in the context of closed-loop reservoir management. In: Paper SPE 109805 Present at Annual Technical Conference and Exhibition. 11–14 Nov 2007 Wang, C., Li, G., Reynolds A.C.: Production optimization in the context of closed-loop reservoir management. In: Paper SPE 109805 Present at Annual Technical Conference and Exhibition. 11–14 Nov 2007
29.
go back to reference Zhao, H.: Theoretical research on reservoir close-loop production optimization. PhD thesis China university of petroleum (2011) Zhao, H.: Theoretical research on reservoir close-loop production optimization. PhD thesis China university of petroleum (2011)
30.
go back to reference Zhao, H., Cao, L., Li, Y., et al.: Production optimization of oil reservoirs based on an improved simultaneous perturbation stochastic approximate algorithm. Acta Pet. Sinca. 32(6), 1031–1036 (2011) Zhao, H., Cao, L., Li, Y., et al.: Production optimization of oil reservoirs based on an improved simultaneous perturbation stochastic approximate algorithm. Acta Pet. Sinca. 32(6), 1031–1036 (2011)
31.
go back to reference Chen, Y., Oliver, D.S., Zhang, D.: Efficient ensemble-based closed-loop production optimization. SPE J. 14(4), 634–645 (2009)CrossRef Chen, Y., Oliver, D.S., Zhang, D.: Efficient ensemble-based closed-loop production optimization. SPE J. 14(4), 634–645 (2009)CrossRef
32.
go back to reference Fonseca, R., Leeuwenburgh, O., Van den Hof, P., Jansen, J.-D.: Improving the Ensemble-Optimization Method Through Covariance-Matrix Adaptation. Society of Petroleum Engineers, Richardson (2014)CrossRef Fonseca, R., Leeuwenburgh, O., Van den Hof, P., Jansen, J.-D.: Improving the Ensemble-Optimization Method Through Covariance-Matrix Adaptation. Society of Petroleum Engineers, Richardson (2014)CrossRef
33.
go back to reference Do, S.T., Reynolds, A.C.: Theoretical connections between optimization algorithms based on an approximate gradient. Comput. Geosci. 17(6), 959–973 (2013)MathSciNetCrossRef Do, S.T., Reynolds, A.C.: Theoretical connections between optimization algorithms based on an approximate gradient. Comput. Geosci. 17(6), 959–973 (2013)MathSciNetCrossRef
35.
go back to reference Yuan, Y., Sun, W.: Optimization Theory and Method. Science and technology press, Haidian, Beijing (1999) Yuan, Y., Sun, W.: Optimization Theory and Method. Science and technology press, Haidian, Beijing (1999)
36.
go back to reference Spall, J.C.: Multivariate stochastic approximation using a simultaneous perturbation gradient approximation. IEEE Trans. Autom. Control 37(3), 332–341 (1992)MathSciNetCrossRef Spall, J.C.: Multivariate stochastic approximation using a simultaneous perturbation gradient approximation. IEEE Trans. Autom. Control 37(3), 332–341 (1992)MathSciNetCrossRef
37.
go back to reference Spall, J.C.: Adaptive stochastic approximation by the simultaneous perturbation method. IEEE Trans. Autom. Control 45(10), 1839–1853 (2000)MathSciNetCrossRef Spall, J.C.: Adaptive stochastic approximation by the simultaneous perturbation method. IEEE Trans. Autom. Control 45(10), 1839–1853 (2000)MathSciNetCrossRef
38.
go back to reference Zhao, H., Li, Y., Kang, Z.: Robust optimization in oil reservoir production. Acta Pet. Sinca. 34(5), 947–953 (2013) Zhao, H., Li, Y., Kang, Z.: Robust optimization in oil reservoir production. Acta Pet. Sinca. 34(5), 947–953 (2013)
Metadata
Title
Constrained short-term and long-term multi-objective production optimization using general stochastic approximation algorithm
Authors
Hui Zhao
Yu Zhang
Lin Cao
Xiaodong Kang
Xiaoqing Xie
Publication date
26-02-2018
Publisher
Springer US
Published in
Cluster Computing / Issue Special Issue 3/2019
Print ISSN: 1386-7857
Electronic ISSN: 1573-7543
DOI
https://doi.org/10.1007/s10586-018-1965-x

Other articles of this Special Issue 3/2019

Cluster Computing 3/2019 Go to the issue

Premium Partner