Skip to main content
Top
Published in: Research in Engineering Design 1/2018

31-03-2017 | Original Paper

Criticality and propagation analysis of impacts between project deliverables

Authors: Hadi Jaber, Franck Marle, Ludovic-Alexandre Vidal, Lionel Didiez

Published in: Research in Engineering Design | Issue 1/2018

Log in

Activate our intelligent search to find suitable subject content or patents.

search-config
loading …

Abstract

The implementation of a management by deliverables and deadlines is based on detailed planning and strict control of deliverables. It is a strategic decision that reports to the project manager and a key element to the success of complex projects. Based on the modeling of the project elements and their interactions using weighted directed graphs, this article presents some contributions to anticipate potential behavior of the project. Topological and propagation analyses are made to detect and prioritize critical elements and critical interdependencies while enlarging the sense of the polysemous word “critical.” We recommend a set of topological indicators suitable for project elements and interactions, which mainly allow us to discuss “How the impact of a project element affects other elements within the network? What is the collective influence of this element?”. These indicators permit to prioritize project elements and their interactions by detecting the most influential ones taking into account the network structure. For instance, they permit to evaluate the collective criticality of project deliverables and to re-evaluate the priority of the risks associated with these deliverables by coupling the traditional features of individual risks with the topological indicators of the deliverables. Furthermore, some algorithms are applied to extract and visualize the propagation path between two elements within the network. For example, this allows to provide a vision of potential impact propagation between two project deliverables, either they are associated with two milestones or are critical. An application to automotive industry illustrates the benefits of the approach, and some perspectives are drawn for further work.

Dont have a licence yet? Then find out more about our products and how to get one now:

Springer Professional "Wirtschaft+Technik"

Online-Abonnement

Mit Springer Professional "Wirtschaft+Technik" erhalten Sie Zugriff auf:

  • über 102.000 Bücher
  • über 537 Zeitschriften

aus folgenden Fachgebieten:

  • Automobil + Motoren
  • Bauwesen + Immobilien
  • Business IT + Informatik
  • Elektrotechnik + Elektronik
  • Energie + Nachhaltigkeit
  • Finance + Banking
  • Management + Führung
  • Marketing + Vertrieb
  • Maschinenbau + Werkstoffe
  • Versicherung + Risiko

Jetzt Wissensvorsprung sichern!

Springer Professional "Technik"

Online-Abonnement

Mit Springer Professional "Technik" erhalten Sie Zugriff auf:

  • über 67.000 Bücher
  • über 390 Zeitschriften

aus folgenden Fachgebieten:

  • Automobil + Motoren
  • Bauwesen + Immobilien
  • Business IT + Informatik
  • Elektrotechnik + Elektronik
  • Energie + Nachhaltigkeit
  • Maschinenbau + Werkstoffe




 

Jetzt Wissensvorsprung sichern!

Literature
go back to reference Akao Y (1990) Quality function deployment. Productivity Press, Cambridge Akao Y (1990) Quality function deployment. Productivity Press, Cambridge
go back to reference Association of Project Management (2000) Syllabus for the APMP Examination (2nd Ed) Appendix 1 Glossary of Project Management Terms., Association of Project Management. ed. High Wycombe, UK Association of Project Management (2000) Syllabus for the APMP Examination (2nd Ed) Appendix 1 Glossary of Project Management Terms., Association of Project Management. ed. High Wycombe, UK
go back to reference Bonacich P (1972) Factoring and weighting approaches to status scores and clique identification. J Math Sociol 2:113–120CrossRef Bonacich P (1972) Factoring and weighting approaches to status scores and clique identification. J Math Sociol 2:113–120CrossRef
go back to reference Borgatti SP, Everett MG, Johnson JC (2013) Analyzing social networks, 1st Edition. ed. SAGE Publications Limited Borgatti SP, Everett MG, Johnson JC (2013) Analyzing social networks, 1st Edition. ed. SAGE Publications Limited
go back to reference Braha D, Bar-Yam Y (2004) Information flow structure in large-scale product development organizational networks. J Inf Technol 19:244–253CrossRef Braha D, Bar-Yam Y (2004) Information flow structure in large-scale product development organizational networks. J Inf Technol 19:244–253CrossRef
go back to reference Braha D, Bar-Yam Y (2007) The statistical mechanics of complex product development: empirical and analytical results. Manage Sci 53:1127–1145CrossRefMATH Braha D, Bar-Yam Y (2007) The statistical mechanics of complex product development: empirical and analytical results. Manage Sci 53:1127–1145CrossRefMATH
go back to reference Browning TR (2001) Applying the design structure matrix to system decomposition and integration problems: a review and new directions. IEEE Trans Eng Manage 48:292–306. doi:10.1109/17.946528 CrossRef Browning TR (2001) Applying the design structure matrix to system decomposition and integration problems: a review and new directions. IEEE Trans Eng Manage 48:292–306. doi:10.​1109/​17.​946528 CrossRef
go back to reference Browning TR (2014) Managing complex project process models with a process architecture framework. Int J Project Manage 32(2):229–241CrossRef Browning TR (2014) Managing complex project process models with a process architecture framework. Int J Project Manage 32(2):229–241CrossRef
go back to reference Bruni ME (2011) A heuristic approach for resource constrained project scheduling with uncertain activity durations. Comput Oper Res 38:1305–1318CrossRefMATH Bruni ME (2011) A heuristic approach for resource constrained project scheduling with uncertain activity durations. Comput Oper Res 38:1305–1318CrossRefMATH
go back to reference Bryde DJ, Joby R (2007) Product-based planning: the importance of project and project management deliverables in the management of clinical trials. R&D. Management 37:363–377 Bryde DJ, Joby R (2007) Product-based planning: the importance of project and project management deliverables in the management of clinical trials. R&D. Management 37:363–377
go back to reference Cano JL, Lidón I (2011) Guided reflection on project definition. Int J Project Manag 29:525–536CrossRef Cano JL, Lidón I (2011) Guided reflection on project definition. Int J Project Manag 29:525–536CrossRef
go back to reference Clarkson PJ, Simons C, Eckert C (2004) Predicting change propagation in complex design. J Mech Des 126:788CrossRef Clarkson PJ, Simons C, Eckert C (2004) Predicting change propagation in complex design. J Mech Des 126:788CrossRef
go back to reference Cook RI (1998) How complex systems fail. Cognitive Technologies Laboratory. University of Chicago, Chicago Cook RI (1998) How complex systems fail. Cognitive Technologies Laboratory. University of Chicago, Chicago
go back to reference Danilovic M, Browning, TRTR (2007) Managing complex product development projects with Design structure matrices and domain mapping matrices. Int J Project Manage 25:300–314CrossRef Danilovic M, Browning, TRTR (2007) Managing complex product development projects with Design structure matrices and domain mapping matrices. Int J Project Manage 25:300–314CrossRef
go back to reference Eppinger SD, Browning TR (2012) Design structure matrix methods and applications. MIT Press, Cambridge Eppinger SD, Browning TR (2012) Design structure matrix methods and applications. MIT Press, Cambridge
go back to reference Eppinger SD, Whitney DE, Smith RP, Gebala DA (1994a) A model-based method for organizing tasks in product development. Res Eng Design 6:1–13CrossRef Eppinger SD, Whitney DE, Smith RP, Gebala DA (1994a) A model-based method for organizing tasks in product development. Res Eng Design 6:1–13CrossRef
go back to reference Everett MG, Borgatti SP (2012) Categorical attribute based centrality: E–I and G–F centrality. Social Networks 34:562–569CrossRef Everett MG, Borgatti SP (2012) Categorical attribute based centrality: E–I and G–F centrality. Social Networks 34:562–569CrossRef
go back to reference Fang C (2011) Modeling and analyzing propagation behavior in complex risk network: a decision support system for project risk management Fang C (2011) Modeling and analyzing propagation behavior in complex risk network: a decision support system for project risk management
go back to reference Fang C, Marle F (2012) A simulation-based risk network model for decision support in project risk management. Decision Support Syst 52:635–644CrossRef Fang C, Marle F (2012) A simulation-based risk network model for decision support in project risk management. Decision Support Syst 52:635–644CrossRef
go back to reference Feng W (2010) Dependency structure matrix modelling for stakeholder value networks. In: The 12th International DSM Conference. Cambridge Feng W (2010) Dependency structure matrix modelling for stakeholder value networks. In: The 12th International DSM Conference. Cambridge
go back to reference Fernandez A (2011) Les nouveaux tableaux de bords des managers, Editions d’organisation. ed Fernandez A (2011) Les nouveaux tableaux de bords des managers, Editions d’organisation. ed
go back to reference Freeman L (1977) Set of measures of centrality based on betweenness. Sociometry 40:35–41CrossRef Freeman L (1977) Set of measures of centrality based on betweenness. Sociometry 40:35–41CrossRef
go back to reference Gannon-Leary P, Mccarthy MD (2010) Customer care. Elsevier, ed. PhiladelphiaCrossRef Gannon-Leary P, Mccarthy MD (2010) Customer care. Elsevier, ed. PhiladelphiaCrossRef
go back to reference Garver MS (2003) Best practices in identifying customer-driven improvement opportunities. Ind Mark Manage 32:455–466CrossRef Garver MS (2003) Best practices in identifying customer-driven improvement opportunities. Ind Mark Manage 32:455–466CrossRef
go back to reference Gonzalez Ramirez N, 2009. Mesure de la maturité des projets: une approche pour améliorer le pilotage des projets automobiles. Ecole Centrale Paris Gonzalez Ramirez N, 2009. Mesure de la maturité des projets: une approche pour améliorer le pilotage des projets automobiles. Ecole Centrale Paris
go back to reference Guimera R, Amaral L (2004) Modeling the world-wide airport network. The European Physical Journal B-Condensed Matter and Complex Systems 38 Guimera R, Amaral L (2004) Modeling the world-wide airport network. The European Physical Journal B-Condensed Matter and Complex Systems 38
go back to reference Gunawan I (2009) Application of numerical design structure matrix method in engineering projects management. Operations and supply chain. Management 2(1):1–10MathSciNet Gunawan I (2009) Application of numerical design structure matrix method in engineering projects management. Operations and supply chain. Management 2(1):1–10MathSciNet
go back to reference Hao X, Lin L, Gen M (2014) An effective multi-objective EDA for robust resource constrained project scheduling with uncertain durations. Procedia computer. Science 36:571–578 Hao X, Lin L, Gen M (2014) An effective multi-objective EDA for robust resource constrained project scheduling with uncertain durations. Procedia computer. Science 36:571–578
go back to reference Katz L (1953) A new status index derived from sociometric analysis. Psychometrika 18:39–43CrossRefMATH Katz L (1953) A new status index derived from sociometric analysis. Psychometrika 18:39–43CrossRefMATH
go back to reference Kreimeyer MF (2009) A structural measurement system for engineering design processes Kreimeyer MF (2009) A structural measurement system for engineering design processes
go back to reference Lamers M (2002) Do you manage a project, or what? A reply to “Do you manage work, deliverables or resources”. Int J Project Manag April 2000 Int J Project Manag 20:325–329 Lamers M (2002) Do you manage a project, or what? A reply to “Do you manage work, deliverables or resources”. Int J Project Manag April 2000 Int J Project Manag 20:325–329
go back to reference Lister G (2015) Mastering project, program, and portfolio management: models for structuring and executing the project hierarchy, FT Press project management series. Pearson Education LTD, Upper Saddle River Lister G (2015) Mastering project, program, and portfolio management: models for structuring and executing the project hierarchy, FT Press project management series. Pearson Education LTD, Upper Saddle River
go back to reference Maier JF, Wynn DC, Biedermann W, Lindemann U, Clarkson PJ (2014) Simulating progressive iteration, rework and change propagation to prioritise design tasks. Res Eng Design 25:283–307. doi:10.1007/s00163-014-0174-8 CrossRef Maier JF, Wynn DC, Biedermann W, Lindemann U, Clarkson PJ (2014) Simulating progressive iteration, rework and change propagation to prioritise design tasks. Res Eng Design 25:283–307. doi:10.​1007/​s00163-014-0174-8 CrossRef
go back to reference Marle F (2002) Modèles d’information et méthodes pour aider à la prise de décision en management de projets. Ecole Centrale Paris Marle F (2002) Modèles d’information et méthodes pour aider à la prise de décision en management de projets. Ecole Centrale Paris
go back to reference Marle F, Vidal L-A (2016) Managing complex, high risk projects. A Guide to Basic and Advanced Project Management. Springer-Verlag, ed. London Marle F, Vidal L-A (2016) Managing complex, high risk projects. A Guide to Basic and Advanced Project Management. Springer-Verlag, ed. London
go back to reference Marmier F, Cheikhrouhou N, Gourc D, 2014. Improvement of the planning reliability by the integration of human skills in project risk management, In: Logistics and Operations Management (GOL), 2014 International Conference on. IEEE, pp. 125–132 Marmier F, Cheikhrouhou N, Gourc D, 2014. Improvement of the planning reliability by the integration of human skills in project risk management, In: Logistics and Operations Management (GOL), 2014 International Conference on. IEEE, pp. 125–132
go back to reference Masmoudi M, Haït A (2013) Project scheduling under uncertainty using fuzzy modelling and solving techniques. Eng Appl Artif Intell 26:135–149CrossRef Masmoudi M, Haït A (2013) Project scheduling under uncertainty using fuzzy modelling and solving techniques. Eng Appl Artif Intell 26:135–149CrossRef
go back to reference Miller DP (2009) Building a project work breakdown structure visualizing objectives, deliverables, activities, and schedules, (ESI international project management series Miller DP (2009) Building a project work breakdown structure visualizing objectives, deliverables, activities, and schedules, (ESI international project management series
go back to reference Page L et al. (1999) The pagerank citation ranking: Bringing order to the web Page L et al. (1999) The pagerank citation ranking: Bringing order to the web
go back to reference PMI (2013) A guide to the project management body of knowledge: PMBOK Guide. Project Management Institute PMI (2013) A guide to the project management body of knowledge: PMBOK Guide. Project Management Institute
go back to reference Samikoglu et al (1998) Sensitivity analysis for project planning and scheduling under uncertain completions. Computers &amp. Chem Eng 22:871–874 Samikoglu et al (1998) Sensitivity analysis for project planning and scheduling under uncertain completions. Computers &amp. Chem Eng 22:871–874
go back to reference Shi Q, Blomquist T (2012) A new approach for project scheduling using fuzzy dependency structure matrix. Int J Project Manage 34:503–510CrossRef Shi Q, Blomquist T (2012) A new approach for project scheduling using fuzzy dependency structure matrix. Int J Project Manage 34:503–510CrossRef
go back to reference Soroush HM (1994) The most critical path in a PERT network: a heuristic approach. Eur J Oper Res 78:93–105CrossRefMATH Soroush HM (1994) The most critical path in a PERT network: a heuristic approach. Eur J Oper Res 78:93–105CrossRefMATH
go back to reference Spizzirri L (2011) Justification and application of eigenvector centrality. Algebra in Geography: Eigenvectors of Network Spizzirri L (2011) Justification and application of eigenvector centrality. Algebra in Geography: Eigenvectors of Network
go back to reference Steward DV (1981) The design structure system: a method for managing the design of complex systems. IEEE Trans Eng Manag (3):71–74CrossRef Steward DV (1981) The design structure system: a method for managing the design of complex systems. IEEE Trans Eng Manag (3):71–74CrossRef
go back to reference Tumer IY, Stone RB (2003) Mapping function to failure mode during component development. Res Eng Design 14:25–33CrossRef Tumer IY, Stone RB (2003) Mapping function to failure mode during component development. Res Eng Design 14:25–33CrossRef
go back to reference Warfield J (1973) Binary matrices in system modeling. IEEE Trans Syst Man Cybern 3:441–449CrossRefMATH Warfield J (1973) Binary matrices in system modeling. IEEE Trans Syst Man Cybern 3:441–449CrossRefMATH
go back to reference West D (2001) Introduction to graph theory., Upper Saddle River. Prentice Hall, ed. NJ West D (2001) Introduction to graph theory., Upper Saddle River. Prentice Hall, ed. NJ
go back to reference Yang LR (2009) Impacts of automation technology on quality of project deliverables in the Taiwanese construction industry. Can J Civ Eng 36:402–414CrossRef Yang LR (2009) Impacts of automation technology on quality of project deliverables in the Taiwanese construction industry. Can J Civ Eng 36:402–414CrossRef
go back to reference Yannou B, 1998. Analyse fonctionnelle et analyse de la valeur. In: Conception de produits mécaniques, méthodes, modèles et outils., Tollenaere M, Hermes, eds. (ed) Yannou B, 1998. Analyse fonctionnelle et analyse de la valeur. In: Conception de produits mécaniques, méthodes, modèles et outils., Tollenaere M, Hermes, eds. (ed)
go back to reference Yassine A (2004) An introduction to modeling and analyzing complex product development processes using the design structure matrix (DSM) method. Urbana 51(9):1–17 Yassine A (2004) An introduction to modeling and analyzing complex product development processes using the design structure matrix (DSM) method. Urbana 51(9):1–17
Metadata
Title
Criticality and propagation analysis of impacts between project deliverables
Authors
Hadi Jaber
Franck Marle
Ludovic-Alexandre Vidal
Lionel Didiez
Publication date
31-03-2017
Publisher
Springer London
Published in
Research in Engineering Design / Issue 1/2018
Print ISSN: 0934-9839
Electronic ISSN: 1435-6066
DOI
https://doi.org/10.1007/s00163-017-0254-7

Other articles of this Issue 1/2018

Research in Engineering Design 1/2018 Go to the issue

Premium Partners