Skip to main content
Top
Published in: Review of Managerial Science 1/2020

09-05-2018 | Original Paper

Effects of low carbon waste practices on job satisfaction of site managers through job stress

Authors: Reza Esmaeilifar, Mohammad Iranmanesh, Mohd Wira Mohd Shafiei, Sunghyup Sean Hyun

Published in: Review of Managerial Science | Issue 1/2020

Log in

Activate our intelligent search to find suitable subject content or patents.

search-config
loading …

Abstract

Low carbon construction has recently become an international issue as construction companies, governments, and communities have witnessed an increasing concern about the degradation of natural resources and pollution in the environment. Although literature abounds with studies investigating the positive impact of low carbon construction on decreasing the emission of carbon in the construction industry, following a low carbon practice might come into conflict with job satisfaction amongst construction site managers, which in turn can negatively affect companies’ performances. This study examines the mediating effect of job stress to investigate the indirect effects of low carbon waste practices on job satisfaction. Data from a survey of 110 site managers of construction companies in Malaysia were examined through the application of the partial least squares technique. The results of the study advocates that unlike the reduce waste management practices, the two other low carbon waste practices, recycle and reuse management practices, positively and directly affected job stress. It was also revealed that only recycle waste management practices negatively and indirectly affected construction site managers’ job satisfaction via job stress. The findings of the research presents an extent of caution for the managers of those construction companies which execute low carbon waste practices regarding the potential impact of low carbon practices on job stress and job satisfaction. From the job stress and job satisfaction points of view, the construction companies should give priority to waste reduction practices amongst low carbon waste practices.

Dont have a licence yet? Then find out more about our products and how to get one now:

Springer Professional "Wirtschaft+Technik"

Online-Abonnement

Mit Springer Professional "Wirtschaft+Technik" erhalten Sie Zugriff auf:

  • über 102.000 Bücher
  • über 537 Zeitschriften

aus folgenden Fachgebieten:

  • Automobil + Motoren
  • Bauwesen + Immobilien
  • Business IT + Informatik
  • Elektrotechnik + Elektronik
  • Energie + Nachhaltigkeit
  • Finance + Banking
  • Management + Führung
  • Marketing + Vertrieb
  • Maschinenbau + Werkstoffe
  • Versicherung + Risiko

Jetzt Wissensvorsprung sichern!

Springer Professional "Wirtschaft"

Online-Abonnement

Mit Springer Professional "Wirtschaft" erhalten Sie Zugriff auf:

  • über 67.000 Bücher
  • über 340 Zeitschriften

aus folgenden Fachgebieten:

  • Bauwesen + Immobilien
  • Business IT + Informatik
  • Finance + Banking
  • Management + Führung
  • Marketing + Vertrieb
  • Versicherung + Risiko




Jetzt Wissensvorsprung sichern!

Literature
go back to reference Anderson-Connolly R, Grunberg L, Greenberg ES, Moore S (2002) Is lean mean? Workplace transformation and employee well-being. Work Employ Soc 16(3):389–413 Anderson-Connolly R, Grunberg L, Greenberg ES, Moore S (2002) Is lean mean? Workplace transformation and employee well-being. Work Employ Soc 16(3):389–413
go back to reference Applebaum D, Fowler S, Fiedler N, Osinubi O, Robson M (2010) The impact of environmental factors on nursing stress, job satisfaction, and turnover intention. J Nurs Adm 40:323–328 Applebaum D, Fowler S, Fiedler N, Osinubi O, Robson M (2010) The impact of environmental factors on nursing stress, job satisfaction, and turnover intention. J Nurs Adm 40:323–328
go back to reference Babin BJ, Hair JF, Boles JS (2008) Publishing research in marketing journals using structural equation modeling. J Mark Theory Pract 16(4):279–285 Babin BJ, Hair JF, Boles JS (2008) Publishing research in marketing journals using structural equation modeling. J Mark Theory Pract 16(4):279–285
go back to reference Bagozzi RP, Yi Y, Phillips LW (1991) Assessing construct validity in organizational research. Adm Sci Q 36(3):421–458 Bagozzi RP, Yi Y, Phillips LW (1991) Assessing construct validity in organizational research. Adm Sci Q 36(3):421–458
go back to reference Baldwin AN, Austin SA, Poon CS, Shen LY, Wong I (2007) Reducing waste in high rise residential building by information modelling at the design stage. Loughb Univ Inst Repos 18:51–62 Baldwin AN, Austin SA, Poon CS, Shen LY, Wong I (2007) Reducing waste in high rise residential building by information modelling at the design stage. Loughb Univ Inst Repos 18:51–62
go back to reference Bakker AB, Schaufeli WB, van Dierendonck D (2000) Burnout: prevalence, risk groups and risk factors. In: Houtman ILD, Schaufeli WB, Taris T (eds) Mental fatigue and work. Samsom, The Netherlands, pp 66–82 Bakker AB, Schaufeli WB, van Dierendonck D (2000) Burnout: prevalence, risk groups and risk factors. In: Houtman ILD, Schaufeli WB, Taris T (eds) Mental fatigue and work. Samsom, The Netherlands, pp 66–82
go back to reference Begum RA, Siwar C, Pereira JJ, Jaafar AH (2006) A benefit-cost analysis on the economic feasibility of construction waste minimisation: the case of Malaysia. Resour Conserv Recycl 48(1):86–98 Begum RA, Siwar C, Pereira JJ, Jaafar AH (2006) A benefit-cost analysis on the economic feasibility of construction waste minimisation: the case of Malaysia. Resour Conserv Recycl 48(1):86–98
go back to reference Begum RA, Siwar C, Pereira JJ, Jaafar AH (2007) Implementation of waste management and minimisation in the construction industry of Malaysia. Resour Conserv Recycl 51:190–202 Begum RA, Siwar C, Pereira JJ, Jaafar AH (2007) Implementation of waste management and minimisation in the construction industry of Malaysia. Resour Conserv Recycl 51:190–202
go back to reference Bergerman L, Corabian P, Harstall C (2009) Effectiveness of organizational interventions for the prevention of workplace stress. Institute of Health Economics, Edmonton, Alberta, Canada Bergerman L, Corabian P, Harstall C (2009) Effectiveness of organizational interventions for the prevention of workplace stress. Institute of Health Economics, Edmonton, Alberta, Canada
go back to reference Bohle P, Willaby H, Quinlan M, McNamara M (2011) Flexible work in call centres: working hours, work-life conflict & health. Appl Ergon 42:219–224 Bohle P, Willaby H, Quinlan M, McNamara M (2011) Flexible work in call centres: working hours, work-life conflict & health. Appl Ergon 42:219–224
go back to reference Chin WW (2010) How to write up and report PLS analyses. In: Esposito Vinzi V, Chin WW, Henseler J, Wang H (eds) Handbook of partial least squares (pp 655-690). Springer, Berlin Chin WW (2010) How to write up and report PLS analyses. In: Esposito Vinzi V, Chin WW, Henseler J, Wang H (eds) Handbook of partial least squares (pp 655-690). Springer, Berlin
go back to reference CIDB (2009) Industrialised Building System (IBS): implementation Strategy from R&D Perspective. Construction Industry Development Board Malaysia (CIDB), Kuala Lumpur CIDB (2009) Industrialised Building System (IBS): implementation Strategy from R&D Perspective. Construction Industry Development Board Malaysia (CIDB), Kuala Lumpur
go back to reference Cohen A (1997) Facing pressure. Sales and marketing management 149:30–38 Cohen A (1997) Facing pressure. Sales and marketing management 149:30–38
go back to reference Council National Economic Advisory (2010) New economic model for malaysia part 1: strategic policy directions. Natl Econ Advis Counc, Putrajaya Council National Economic Advisory (2010) New economic model for malaysia part 1: strategic policy directions. Natl Econ Advis Counc, Putrajaya
go back to reference Cummins RC (1990) Job stress and the buffering effect of supervisory support. Group Org Manag 15(1):92–104 Cummins RC (1990) Job stress and the buffering effect of supervisory support. Group Org Manag 15(1):92–104
go back to reference Dainty AR, Brooke RJ (2004) Towards improved construction waste minimisation: a need for improved supply chain integration? Struct Surv 22:20–29 Dainty AR, Brooke RJ (2004) Towards improved construction waste minimisation: a need for improved supply chain integration? Struct Surv 22:20–29
go back to reference Davies AR (2008) The geographies of garbage governance: interventions, interactions, and outcomes. Ashgate Publishing Ltd., Farnham Davies AR (2008) The geographies of garbage governance: interventions, interactions, and outcomes. Ashgate Publishing Ltd., Farnham
go back to reference Demerouti E, Bakker AB, Halbesleben JR (2015) Productive and counterproductive job crafting: a daily diary study. J Occup Health Psychol 20(4):457–469 Demerouti E, Bakker AB, Halbesleben JR (2015) Productive and counterproductive job crafting: a daily diary study. J Occup Health Psychol 20(4):457–469
go back to reference Diaz I, Chiaburu DS, Zimmerman RD, Boswell WR (2012) Communication technology: pros and cons of constant connection to work. J Vocat Behav 80(2):500–508 Diaz I, Chiaburu DS, Zimmerman RD, Boswell WR (2012) Communication technology: pros and cons of constant connection to work. J Vocat Behav 80(2):500–508
go back to reference Ding Z, Yi G, Tam VW, Huang T (2016) A system dynamics-based environmental performance simulation of construction waste reduction management in China. Waste Manag 51:130–141 Ding Z, Yi G, Tam VW, Huang T (2016) A system dynamics-based environmental performance simulation of construction waste reduction management in China. Waste Manag 51:130–141
go back to reference Dowden C, Tellier C (2004) Predicting work-related stress in correctional officers: a meta-analysis. J Crim Justice 32(1):31–47 Dowden C, Tellier C (2004) Predicting work-related stress in correctional officers: a meta-analysis. J Crim Justice 32(1):31–47
go back to reference Duran X, Lenihan H, O’Regan B (2006) A model for assessing the economic viability of construction and demolition waste recycling—the case of Ireland. Resour Conserv Recycl 46(3):302–320 Duran X, Lenihan H, O’Regan B (2006) A model for assessing the economic viability of construction and demolition waste recycling—the case of Ireland. Resour Conserv Recycl 46(3):302–320
go back to reference Elloy DF, Smith CR (2003) Patterns of stress, work-family conflict, role conflict, role ambiguity and overload among dual-career and single-career couples: an Australian study. Cross Cult Manag Int J 10(1):55–66 Elloy DF, Smith CR (2003) Patterns of stress, work-family conflict, role conflict, role ambiguity and overload among dual-career and single-career couples: an Australian study. Cross Cult Manag Int J 10(1):55–66
go back to reference Esin T, Cosgun N (2007) A study conducted to reduce construction waste generation in Turkey. Build Environ 42(4):1667–1674 Esin T, Cosgun N (2007) A study conducted to reduce construction waste generation in Turkey. Build Environ 42(4):1667–1674
go back to reference Esmaeilifar R, Samari M, Mirzaei NF, MohdShafiei MW (2015) How is electricity consumption on construction sites in Malaysia related to sources of CO2? Adv Environ Biol 9(5):160–163 Esmaeilifar R, Samari M, Mirzaei NF, MohdShafiei MW (2015) How is electricity consumption on construction sites in Malaysia related to sources of CO2? Adv Environ Biol 9(5):160–163
go back to reference European Environmental Agency (2007) Europe’s environment—the fourth assessment/state of the environment, report no 1/2007 European Environmental Agency (2007) Europe’s environment—the fourth assessment/state of the environment, report no 1/2007
go back to reference Faniran OO, Caban G (1998) Minimizing waste on construction project sites. Eng Constr Archit Manag 5(2):182–188 Faniran OO, Caban G (1998) Minimizing waste on construction project sites. Eng Constr Archit Manag 5(2):182–188
go back to reference Farrell P, Gale A (2000) The site manager: role, education and training in the UK. J Constr Res 1:43–52 Farrell P, Gale A (2000) The site manager: role, education and training in the UK. J Constr Res 1:43–52
go back to reference Finn P (1998) Correctional officer stress-a cause for concern and additional help. Fed. Probat 62:65 Finn P (1998) Correctional officer stress-a cause for concern and additional help. Fed. Probat 62:65
go back to reference Finney C, Stergiopoulos E, Hensel J, Bonato S, Dewa CS (2013) Organizational stressors associated with job stress and burnout in correctional officers: a systematic review. BMC Public Health 13(1):82 Finney C, Stergiopoulos E, Hensel J, Bonato S, Dewa CS (2013) Organizational stressors associated with job stress and burnout in correctional officers: a systematic review. BMC Public Health 13(1):82
go back to reference Fornell C, Larcker DF (1981) Evaluating structural equation models with unobservable variables and measurements error. J Mark Res 18(1):39–50 Fornell C, Larcker DF (1981) Evaluating structural equation models with unobservable variables and measurements error. J Mark Res 18(1):39–50
go back to reference Foroughi B, Nikbin D, Hyun SS, Iranmanesh M (2016) Impact of core product quality on sport fans’ emotions and behavioral intentions. Int J Sports Mark Spons 17(2):110–129 Foroughi B, Nikbin D, Hyun SS, Iranmanesh M (2016) Impact of core product quality on sport fans’ emotions and behavioral intentions. Int J Sports Mark Spons 17(2):110–129
go back to reference Fredman N, Doughney J (2012) Academic dissatisfaction, managerial change and neo-liberalism. High Educ 64(1):41–58 Fredman N, Doughney J (2012) Academic dissatisfaction, managerial change and neo-liberalism. High Educ 64(1):41–58
go back to reference Galbreath J (2006) Corporate social responsibility strategy: strategic options, global considerations. Corp Gov Int J Bus Soc 6(2):175–187 Galbreath J (2006) Corporate social responsibility strategy: strategic options, global considerations. Corp Gov Int J Bus Soc 6(2):175–187
go back to reference Gatti UC, Migliaccio GC, Schneider S, Fierro R (2010) Assessing physical strain in construction workforce: a first step for improving safety and productivity management. In: Proceedings, 27th international symposium on automation and robotics in construction (ISARC), international association for automation and robotics in construction (IAARC), pp 255–264 Gatti UC, Migliaccio GC, Schneider S, Fierro R (2010) Assessing physical strain in construction workforce: a first step for improving safety and productivity management. In: Proceedings, 27th international symposium on automation and robotics in construction (ISARC), international association for automation and robotics in construction (IAARC), pp 255–264
go back to reference Geisser S (1975) The redictive sample reuse method with applications. J Am Stat Assoc 70:320–328 Geisser S (1975) The redictive sample reuse method with applications. J Am Stat Assoc 70:320–328
go back to reference Gemmill GR, Heisler WJ (1972) Machiavellianism as a factor in managerial job strain, job satisfaction, and upward mobility. Acad Manag J 15(1):51–62 Gemmill GR, Heisler WJ (1972) Machiavellianism as a factor in managerial job strain, job satisfaction, and upward mobility. Acad Manag J 15(1):51–62
go back to reference Gilani M, Iranmanesh M, Nikbin D, Zailani S (2017) EMR continuance usage intention of healthcare professionals. Inf Health Soc Care 42(2):153–165 Gilani M, Iranmanesh M, Nikbin D, Zailani S (2017) EMR continuance usage intention of healthcare professionals. Inf Health Soc Care 42(2):153–165
go back to reference Green DH, Zenisek TJ (1983) Dual career couples: individual and organizational implications. J Bus Ethics 2(3):171–184 Green DH, Zenisek TJ (1983) Dual career couples: individual and organizational implications. J Bus Ethics 2(3):171–184
go back to reference Grossi E, Keil T, Vito G (1996) Surviving ‘the joint’: mitigating factors of correctional officer stress. J Crime Justice 19:103–120 Grossi E, Keil T, Vito G (1996) Surviving ‘the joint’: mitigating factors of correctional officer stress. J Crime Justice 19:103–120
go back to reference Hagen T, Bogaerts S (2014) Work pressure and sickness absenteeism among judges. Psychiatry Psychol Law 21(1):92–111 Hagen T, Bogaerts S (2014) Work pressure and sickness absenteeism among judges. Psychiatry Psychol Law 21(1):92–111
go back to reference Hair JF, Black WC, Babin BJ, Anderson RE (2010) Multivariate data analysis, 7th edn. Prentice Hall, Upper Saddle River Hair JF, Black WC, Babin BJ, Anderson RE (2010) Multivariate data analysis, 7th edn. Prentice Hall, Upper Saddle River
go back to reference Hair JF, Ringle CM, Sarstedt M (2011) PLS-SEM: indeed a silver bullet. J Market Theory Pract 19(2):139–152 Hair JF, Ringle CM, Sarstedt M (2011) PLS-SEM: indeed a silver bullet. J Market Theory Pract 19(2):139–152
go back to reference Hair JF, Sarstedt M, Ringle CM, Mena JA (2012) An assessment of the use of partial least squares structural equation modeling in marketing research. J Acad Mark Sci 40(3):414–433 Hair JF, Sarstedt M, Ringle CM, Mena JA (2012) An assessment of the use of partial least squares structural equation modeling in marketing research. J Acad Mark Sci 40(3):414–433
go back to reference Hair JF, Ringle CM, Sarstedt M (2013) Editorial-partial least squares structural equation modeling: rigorous applications, better results and higher acceptance. Long Range Plan 46(1–2):1–12 Hair JF, Ringle CM, Sarstedt M (2013) Editorial-partial least squares structural equation modeling: rigorous applications, better results and higher acceptance. Long Range Plan 46(1–2):1–12
go back to reference Hair JF, Hult TM, Ringle CM, Sarstedt M (2014) A primer on partial least squares structural equations modeling (PLS-SEM). SAGE, Los Angeles Hair JF, Hult TM, Ringle CM, Sarstedt M (2014) A primer on partial least squares structural equations modeling (PLS-SEM). SAGE, Los Angeles
go back to reference Hajibabai L, Aziz Z, Peña-Mora F (2011) Visualizing greenhouse gas emissions from construction activities. Constr Innov Inf Process Manag 11(3):356–370 Hajibabai L, Aziz Z, Peña-Mora F (2011) Visualizing greenhouse gas emissions from construction activities. Constr Innov Inf Process Manag 11(3):356–370
go back to reference Hao JL, Hills MJ, Tam VW (2008) The effectiveness of Hong Kong’s construction waste disposal charging scheme. Waste Manag Res 26(6):553–558 Hao JL, Hills MJ, Tam VW (2008) The effectiveness of Hong Kong’s construction waste disposal charging scheme. Waste Manag Res 26(6):553–558
go back to reference Hayes AF (2009) Beyond Baron and Kenny: statistical mediation analysis in the new millennium. Commun Monogr 76(4):408–420 Hayes AF (2009) Beyond Baron and Kenny: statistical mediation analysis in the new millennium. Commun Monogr 76(4):408–420
go back to reference Haynes NS, Love PE (2004) Psychological adjustment and coping among construction project managers. Constr Manag Econ 22(2):129–140 Haynes NS, Love PE (2004) Psychological adjustment and coping among construction project managers. Constr Manag Econ 22(2):129–140
go back to reference Hendriks CF, Pietersen HS (2000) Report 22: SUSTAINABLE raw materials: construction and demolition waste-state-of-the-art report of RILEM technical committee 165-SRM, vol 22. RILEM Publications Hendriks CF, Pietersen HS (2000) Report 22: SUSTAINABLE raw materials: construction and demolition waste-state-of-the-art report of RILEM technical committee 165-SRM, vol 22. RILEM Publications
go back to reference Henseler J, Ringle CM, Sinkovics RR (2009) The use of partial least squares path modeling in international marketing. Adv Int Mark 20:277–320 Henseler J, Ringle CM, Sinkovics RR (2009) The use of partial least squares path modeling in international marketing. Adv Int Mark 20:277–320
go back to reference Hettiaratchi JPA, Prado Verduga BF, Rajbhandari BK, Ruwanpura JY, Wimalasena BADS (2010) A statistical approach to predict waste generation rates to support recycling programmes. Int J Environ Waste Manag 6(1–2):82–95 Hettiaratchi JPA, Prado Verduga BF, Rajbhandari BK, Ruwanpura JY, Wimalasena BADS (2010) A statistical approach to predict waste generation rates to support recycling programmes. Int J Environ Waste Manag 6(1–2):82–95
go back to reference Higgins CA, Duxbury LE, Lyons ST (2010) Coping with overload and stress: men and women in dual-earner families. J Marriage Fam 72(4):847–859 Higgins CA, Duxbury LE, Lyons ST (2010) Coping with overload and stress: men and women in dual-earner families. J Marriage Fam 72(4):847–859
go back to reference Ilies R, Judge TA (2004) An experience-sampling measure of job satisfaction and its relationships with affectivity, mood at work, job beliefs, and general job satisfaction. Eur J Work Organ Psychol 13(3):367–389 Ilies R, Judge TA (2004) An experience-sampling measure of job satisfaction and its relationships with affectivity, mood at work, job beliefs, and general job satisfaction. Eur J Work Organ Psychol 13(3):367–389
go back to reference Iranmanesh M, Siti-Nabiha AK, Sabbah M (2012) The retention of trained production workers in a small manufacturing company in Malaysia. Int J Entrep Small Bus 16(1):71–82 Iranmanesh M, Siti-Nabiha AK, Sabbah M (2012) The retention of trained production workers in a small manufacturing company in Malaysia. Int J Entrep Small Bus 16(1):71–82
go back to reference Iranmanesh M, Jayaraman K, Imrie BC, Zailani S (2016) Promoting products through volume discount: evidence from Malaysia. J Promot Manag 22(1):71–88 Iranmanesh M, Jayaraman K, Imrie BC, Zailani S (2016) Promoting products through volume discount: evidence from Malaysia. J Promot Manag 22(1):71–88
go back to reference Iranmanesh M, Zailani S, Nikbin D (2017) RFID continuance usage intention in health care industry. Qual Manag Healthc 26(2):116–123 Iranmanesh M, Zailani S, Nikbin D (2017) RFID continuance usage intention in health care industry. Qual Manag Healthc 26(2):116–123
go back to reference Ismail Z, Doostdar S, Harun Z (2012) Factors influencing the implementation of a safety management system for construction sites. Saf Sci 50(3):418–423 Ismail Z, Doostdar S, Harun Z (2012) Factors influencing the implementation of a safety management system for construction sites. Saf Sci 50(3):418–423
go back to reference Janssen PP, Bakker AB, de Jong A (2001) A test and refinement of the demand–control–support model in the construction industry. Int J Stress Manag 8(4):315–332 Janssen PP, Bakker AB, de Jong A (2001) A test and refinement of the demand–control–support model in the construction industry. Int J Stress Manag 8(4):315–332
go back to reference Johnson S, Cooper C, Cartwright S, Donald I, Taylor P, Millet C (2005) The experience of work-related stress across occupations. J Manag Psychol 20(2):178–187 Johnson S, Cooper C, Cartwright S, Donald I, Taylor P, Millet C (2005) The experience of work-related stress across occupations. J Manag Psychol 20(2):178–187
go back to reference Judge TA, Piccolo RF, Podsakoff NP, Shaw JC, Rich BL (2010) The relationship between pay and job satisfaction: a meta-analysis of the literature. J Vocat Behav 77(2):157–167 Judge TA, Piccolo RF, Podsakoff NP, Shaw JC, Rich BL (2010) The relationship between pay and job satisfaction: a meta-analysis of the literature. J Vocat Behav 77(2):157–167
go back to reference Karasek RA (1979) Job demands, job decision latitude, and mental strain: implications for job redesign. Adm Sci Q 24(2):285–308 Karasek RA (1979) Job demands, job decision latitude, and mental strain: implications for job redesign. Adm Sci Q 24(2):285–308
go back to reference Kartam N, Al-Mutairi N, Al-Ghusain I, Al-Humoud J (2004) Environmental management of construction and demolition waste in Kuwait. Waste Manag 24(10):1049–1059 Kartam N, Al-Mutairi N, Al-Ghusain I, Al-Humoud J (2004) Environmental management of construction and demolition waste in Kuwait. Waste Manag 24(10):1049–1059
go back to reference Khosh M, Kerzner H (1984) Stress and burnout in project management. annual symposium on project management, Project Management Institute, 8–10 October, Philadelphia, USA. Cited in Kerzner H (1995) Project management, 5th edn. Van Nostrand Reinhold, New York Khosh M, Kerzner H (1984) Stress and burnout in project management. annual symposium on project management, Project Management Institute, 8–10 October, Philadelphia, USA. Cited in Kerzner H (1995) Project management, 5th edn. Van Nostrand Reinhold, New York
go back to reference Kirmeyer SL, Dougherty TW (1988) Work load, tension, and coping: moderating effects of supervisor support. Pers Psychol 41(1):125–139 Kirmeyer SL, Dougherty TW (1988) Work load, tension, and coping: moderating effects of supervisor support. Pers Psychol 41(1):125–139
go back to reference Kock N (2013) WarpPLS 4.0 user manual. ScriptWarp Systems, Laredo Kock N (2013) WarpPLS 4.0 user manual. ScriptWarp Systems, Laredo
go back to reference Kock N, Lynn GS (2012) Lateral collinearity and misleading results in variance-based SEM: an illustration and recommendations. J Assoc Inf Syst 13(7):546–580 Kock N, Lynn GS (2012) Lateral collinearity and misleading results in variance-based SEM: an illustration and recommendations. J Assoc Inf Syst 13(7):546–580
go back to reference Kurniawan R, Zailani SH, Iranmanesh M, Rajagopal P (2017) The effects of vulnerability mitigation strategies on supply chain effectiveness: risk culture as moderator. Supply Chain Manag Int J 22(1):1–15 Kurniawan R, Zailani SH, Iranmanesh M, Rajagopal P (2017) The effects of vulnerability mitigation strategies on supply chain effectiveness: risk culture as moderator. Supply Chain Manag Int J 22(1):1–15
go back to reference Lambert E (2004) The impact of job characteristics on correctional staff. Prison J 84:208–227 Lambert E (2004) The impact of job characteristics on correctional staff. Prison J 84:208–227
go back to reference Lambert E, Paoline EA (2010) Take this job and shove it: an exploratory study of turnover intent among jail staff. J Crim Justice 38(2):139–148 Lambert E, Paoline EA (2010) Take this job and shove it: an exploratory study of turnover intent among jail staff. J Crim Justice 38(2):139–148
go back to reference Lambert E, Hogan N, Paoline E, Baker D (2005) The good life: the impact of job satisfaction and occupational stressors on correctional staff life satisfaction—an exploratory study. J Crim Justice 18:1–26 Lambert E, Hogan N, Paoline E, Baker D (2005) The good life: the impact of job satisfaction and occupational stressors on correctional staff life satisfaction—an exploratory study. J Crim Justice 18:1–26
go back to reference Lambert EG, Hogan NL, Griffin ML (2007) The impact of distributive and procedural justice on correctional staff job stress, job satisfaction, and organizational commitment. J Crim Justice 35(6):644–656 Lambert EG, Hogan NL, Griffin ML (2007) The impact of distributive and procedural justice on correctional staff job stress, job satisfaction, and organizational commitment. J Crim Justice 35(6):644–656
go back to reference Lambert EG, Hogan NL, Altheimer I (2010) An exploratory examination of the consequences of burnout in terms of life satisfaction, turnover intent, and absenteeism among private correctional staff. Prison J 90(1):94–114 Lambert EG, Hogan NL, Altheimer I (2010) An exploratory examination of the consequences of burnout in terms of life satisfaction, turnover intent, and absenteeism among private correctional staff. Prison J 90(1):94–114
go back to reference Lee SM (1995) The effect of job characteristics and personal factors on work stress, job satisfaction and turnover intention. J Nurses Acad Soc 25(4):790–806 Lee SM (1995) The effect of job characteristics and personal factors on work stress, job satisfaction and turnover intention. J Nurses Acad Soc 25(4):790–806
go back to reference Leka S, Griffiths A, Cox T (2003) Work organisation and stress: systematic problem approaches for employers, managers and trade union representatives. World Health Organisation, Geneva Leka S, Griffiths A, Cox T (2003) Work organisation and stress: systematic problem approaches for employers, managers and trade union representatives. World Health Organisation, Geneva
go back to reference Leung MY, Ng ST, Skitmore M, Cheung SO (2005a) Critical stressors influencing construction estimators in Hong Kong. Constr Manag Econ 23(1):33–44 Leung MY, Ng ST, Skitmore M, Cheung SO (2005a) Critical stressors influencing construction estimators in Hong Kong. Constr Manag Econ 23(1):33–44
go back to reference Leung MY, Olomolaiye P, Chong A, Lam CC (2005b) Impacts of stress on estimation performance in Hong Kong. Constr Manag Econ 23(9):891–903 Leung MY, Olomolaiye P, Chong A, Lam CC (2005b) Impacts of stress on estimation performance in Hong Kong. Constr Manag Econ 23(9):891–903
go back to reference Leung MY, Chan YS, Olomolaiye P (2008) Impact of stress on the performance of construction project managers. J Constr Eng Manag 134(8):644–652 Leung MY, Chan YS, Olomolaiye P (2008) Impact of stress on the performance of construction project managers. J Constr Eng Manag 134(8):644–652
go back to reference Leung MY, Chan YS, Yu J (2009) Integrated model for the stressors and stresses of construction project managers in Hong Kong. J Constr Eng Manag 135(2):126–134 Leung MY, Chan YS, Yu J (2009) Integrated model for the stressors and stresses of construction project managers in Hong Kong. J Constr Eng Manag 135(2):126–134
go back to reference Leung MY, Shan Isabelle Chan Y, Dongyu C (2011) Structural linear relationships between job stress, burnout, physiological stress, and performance of construction project managers. Eng Constr Archit Manag 18(3):312–328 Leung MY, Shan Isabelle Chan Y, Dongyu C (2011) Structural linear relationships between job stress, burnout, physiological stress, and performance of construction project managers. Eng Constr Archit Manag 18(3):312–328
go back to reference Li Z, Shen GQ, Alshawi M (2014) Measuring the impact of prefabrication on construction waste reduction: an empirical study in China. Resour Conserv Recycl 91:27–39 Li Z, Shen GQ, Alshawi M (2014) Measuring the impact of prefabrication on construction waste reduction: an empirical study in China. Resour Conserv Recycl 91:27–39
go back to reference Ling YY, Leo KC (2000) Reusing timber formwork: importance of workmen’s efficiency and attitude. Build Environ 35(2):135–143 Ling YY, Leo KC (2000) Reusing timber formwork: importance of workmen’s efficiency and attitude. Build Environ 35(2):135–143
go back to reference Liu JY, Low SP (2011) Work–family conflicts experienced by project managers in the Chinese construction industry. Int J Project Manag 29(2):117–128 Liu JY, Low SP (2011) Work–family conflicts experienced by project managers in the Chinese construction industry. Int J Project Manag 29(2):117–128
go back to reference Liyin S, Hong Y, Griffith A (2006) Improving environmental performance by means of empowerment of contractors. Manag Environ Qual Int J 17(3):242–257 Liyin S, Hong Y, Griffith A (2006) Improving environmental performance by means of empowerment of contractors. Manag Environ Qual Int J 17(3):242–257
go back to reference Loch C (1998) Operations management and reengineering. Eur Manag J 16(3):306–317 Loch C (1998) Operations management and reengineering. Eur Manag J 16(3):306–317
go back to reference Loosemore M, Waters T (2004) Gender differences in occupational stress among professionals in the construction industry. J Manag Eng 20(3):126–132 Loosemore M, Waters T (2004) Gender differences in occupational stress among professionals in the construction industry. J Manag Eng 20(3):126–132
go back to reference Lopes H, Lagoa S, Calapez T (2014) Work autonomy, work pressure, and job satisfaction: AN analysis of European Union countries. Econ Labour Relat Rev 25(2):306–326 Lopes H, Lagoa S, Calapez T (2014) Work autonomy, work pressure, and job satisfaction: AN analysis of European Union countries. Econ Labour Relat Rev 25(2):306–326
go back to reference Love PED, Haynes NS, Irani Z (2001) Construction managers’ expectations and observations of graduates. J Manag Psychol 16:579–593 Love PED, Haynes NS, Irani Z (2001) Construction managers’ expectations and observations of graduates. J Manag Psychol 16:579–593
go back to reference Lu W, Yuan H (2011) A framework for understanding waste management studies in construction. Waste Manag 31(6):1252–1260 Lu W, Yuan H (2011) A framework for understanding waste management studies in construction. Waste Manag 31(6):1252–1260
go back to reference Macklin DS, Smith LA, Dollard MF (2006) Public and private sector work stress: workers compensation, levels of distress and job satisfaction, and the demand-control-support model. Austral J Psychol 58(3):130–143 Macklin DS, Smith LA, Dollard MF (2006) Public and private sector work stress: workers compensation, levels of distress and job satisfaction, and the demand-control-support model. Austral J Psychol 58(3):130–143
go back to reference Manrodt KB, Abott J, Visatek K (2005) Understanding the lean supply chain: beginning the journey 2005 report on lean practices in the supply chain. APICS, Georgia Southern University, Oracle and Supply Chain Visions Manrodt KB, Abott J, Visatek K (2005) Understanding the lean supply chain: beginning the journey 2005 report on lean practices in the supply chain. APICS, Georgia Southern University, Oracle and Supply Chain Visions
go back to reference McGrath C, Anderson M (2000) Waste minimizing on a construction site. Build Res Establ Dig 447(2000):441–454 McGrath C, Anderson M (2000) Waste minimizing on a construction site. Build Res Establ Dig 447(2000):441–454
go back to reference Mosteller J, Donthu N, Eroglu S (2014) The fluent online shopping experience. J Bus Res 67(11):2486–2493 Mosteller J, Donthu N, Eroglu S (2014) The fluent online shopping experience. J Bus Res 67(11):2486–2493
go back to reference Nikbin D, Hyun SS, Iranmanesh M, Foroughi B (2014) Effects of perceived justice for coaches on athletes’ trust, commitment, and perceived performance: a study of futsal and volleyball players. Int J Sports Sci Coach 9(4):561–578 Nikbin D, Hyun SS, Iranmanesh M, Foroughi B (2014) Effects of perceived justice for coaches on athletes’ trust, commitment, and perceived performance: a study of futsal and volleyball players. Int J Sports Sci Coach 9(4):561–578
go back to reference Nikbin D, Hyun SS, Iranmanesh M, Maghsoudi A, Jeong C (2016) Airline travelers’ causal attribution of service failure and its impact on trust and loyalty formation: the moderating role of corporate social responsibility. Asia Pac J Tour Res 21(4):355–374 Nikbin D, Hyun SS, Iranmanesh M, Maghsoudi A, Jeong C (2016) Airline travelers’ causal attribution of service failure and its impact on trust and loyalty formation: the moderating role of corporate social responsibility. Asia Pac J Tour Res 21(4):355–374
go back to reference Noblet A, Rodwell J, McWilliams J (2001) The job-strain model is enough for managers: no augmentation needed. J Manag Psychol 16:635–649 Noblet A, Rodwell J, McWilliams J (2001) The job-strain model is enough for managers: no augmentation needed. J Manag Psychol 16:635–649
go back to reference Oduro-Owusu KN (2013) Factors influencing construction worker job satisfaction in the Ghanaian construction industry. Doctoral dissertation) Oduro-Owusu KN (2013) Factors influencing construction worker job satisfaction in the Ghanaian construction industry. Doctoral dissertation)
go back to reference Peng CL, Scorpio DE, Kibert CJ (1997) Strategies for successful construction and demolition waste recycling operations. Constr Manag Econ 15(1):49–58 Peng CL, Scorpio DE, Kibert CJ (1997) Strategies for successful construction and demolition waste recycling operations. Constr Manag Econ 15(1):49–58
go back to reference Podsakoff PM, Organ DW (1986) Self-reports in organizational research: problems and prospects. J Manag 12(4):531–544 Podsakoff PM, Organ DW (1986) Self-reports in organizational research: problems and prospects. J Manag 12(4):531–544
go back to reference Poon CS (2007) Reducing construction waste. Waste Manag 27(12):1715–1716 Poon CS (2007) Reducing construction waste. Waste Manag 27(12):1715–1716
go back to reference Poon CS, Ann TW, Ng LH (2001) On-site sorting of construction and demolition waste in Hong Kong. Resour Conserv Recycl 32(2):157–172 Poon CS, Ann TW, Ng LH (2001) On-site sorting of construction and demolition waste in Hong Kong. Resour Conserv Recycl 32(2):157–172
go back to reference Poon CS, Yu AT, Jaillon L (2004) Reducing building waste at construction sites in Hong Kong. Constr Manag Econ 22(5):461–470 Poon CS, Yu AT, Jaillon L (2004) Reducing building waste at construction sites in Hong Kong. Constr Manag Econ 22(5):461–470
go back to reference Rigdon EE (1998) Structural equation modeling. In: Marcoulides GA (ed) Modern methods for business research. Erlbaum, Mahwah, pp 251–294 Rigdon EE (1998) Structural equation modeling. In: Marcoulides GA (ed) Modern methods for business research. Erlbaum, Mahwah, pp 251–294
go back to reference Rössler W (2012) Stress, burnout, and job dissatisfaction in mental health workers. Eur Arch Psychiatry Clin Neurosci 262(2):65–69 Rössler W (2012) Stress, burnout, and job dissatisfaction in mental health workers. Eur Arch Psychiatry Clin Neurosci 262(2):65–69
go back to reference Schneider B, Snyder RA (1975) Some relationships between job satisfaction and organization climate. J Appl Psychol 60(3):318 Schneider B, Snyder RA (1975) Some relationships between job satisfaction and organization climate. J Appl Psychol 60(3):318
go back to reference Serpell A, Alarcon LF (1998) Construction process improvement methodology for construction projects. Int J Project Manag 16(4):215–221 Serpell A, Alarcon LF (1998) Construction process improvement methodology for construction projects. Int J Project Manag 16(4):215–221
go back to reference Seydel A, Wilson OD, Skitmore RM (2002) Financial evaluation of waste management methods: a case study. J Constr Res 3(01):167–179 Seydel A, Wilson OD, Skitmore RM (2002) Financial evaluation of waste management methods: a case study. J Constr Res 3(01):167–179
go back to reference Sharrard AL, Matthews HS, Roth M (2007) Environmental implications of construction site energy use and electricity generation 1. J Constr Eng Manag 133(11):846–854 Sharrard AL, Matthews HS, Roth M (2007) Environmental implications of construction site energy use and electricity generation 1. J Constr Eng Manag 133(11):846–854
go back to reference Shen LY, Tam VW (2002) Implementation of environmental management in the Hong Kong construction industry. Int J Project Manag 20(7):535–543 Shen LY, Tam VW (2002) Implementation of environmental management in the Hong Kong construction industry. Int J Project Manag 20(7):535–543
go back to reference Shen LY, Zhang ZH (2002) China’s urbanization challenging sustainable development. Int J Hous Appl 26(3):181–193 Shen LY, Zhang ZH (2002) China’s urbanization challenging sustainable development. Int J Hous Appl 26(3):181–193
go back to reference Shen LY, Tam VW, Tam CM, Drew D (2004) Mapping approach for examining waste management on construction sites. J Constr Eng Manag 130(4):472–481 Shen LY, Tam VW, Tam CM, Drew D (2004) Mapping approach for examining waste management on construction sites. J Constr Eng Manag 130(4):472–481
go back to reference Shen LY, Wu YZ, Chan EHW, Hao JL (2005) Application of system dynamics for assessment of sustainable performance of construction projects. J Zhejiang Univ Sci A 6(4):339–349 Shen LY, Wu YZ, Chan EHW, Hao JL (2005) Application of system dynamics for assessment of sustainable performance of construction projects. J Zhejiang Univ Sci A 6(4):339–349
go back to reference Siegrist J (1996) Adverse health effects of high-effort/low-reward conditions. J Occup Health Psychol 1(1):27–41 Siegrist J (1996) Adverse health effects of high-effort/low-reward conditions. J Occup Health Psychol 1(1):27–41
go back to reference Skoyles ER, Skoyles JR (1987) Waste prevention on site. Mitchell, London Skoyles ER, Skoyles JR (1987) Waste prevention on site. Mitchell, London
go back to reference Smoktunowicz E, Baka L, Cieslak R, Nichols CF, Benight CC, Luszczynska A (2015) Explaining counterproductive work behaviors among police officers: the indirect effects of job demands are mediated by job burnout and moderated by job control and social support. Hum Perform 28(4):332–350 Smoktunowicz E, Baka L, Cieslak R, Nichols CF, Benight CC, Luszczynska A (2015) Explaining counterproductive work behaviors among police officers: the indirect effects of job demands are mediated by job burnout and moderated by job control and social support. Hum Perform 28(4):332–350
go back to reference Soltanian M, Zailani S, Iranmanesh M, Aziz AA (2016) Motivations of SME entrepreneurs to become halalpreneurs. J Sci Technol Policy Manag 7(2):173–189 Soltanian M, Zailani S, Iranmanesh M, Aziz AA (2016) Motivations of SME entrepreneurs to become halalpreneurs. J Sci Technol Policy Manag 7(2):173–189
go back to reference Sommerville J, Langford V (1994) Multivariate influences on the people side of projects: stress and conflict. Int J Project Manag 12:234–243 Sommerville J, Langford V (1994) Multivariate influences on the people side of projects: stress and conflict. Int J Project Manag 12:234–243
go back to reference Stone M (1974) Cross-validatory choice and assessment of statistical predictions. J R Stat Soc 36(2):111–133 Stone M (1974) Cross-validatory choice and assessment of statistical predictions. J R Stat Soc 36(2):111–133
go back to reference Sutherland V, Davidson MJ (1993) Using a stress audit: the construction site manager experience in the UK. Work Stress 7(3):273–286 Sutherland V, Davidson MJ (1993) Using a stress audit: the construction site manager experience in the UK. Work Stress 7(3):273–286
go back to reference Tam VW (2008) On the effectiveness in implementing a waste-management-plan method in construction. Waste Manag 28(6):1072–1080 Tam VW (2008) On the effectiveness in implementing a waste-management-plan method in construction. Waste Manag 28(6):1072–1080
go back to reference Tam VW, Tam CM, Shen LY, Zeng SX, Ho CM (2006) Environmental performance assessment: perceptions of project managers on the relationship between operational and environmental performance indicators. Constr Manag Econ 24(3):287–299 Tam VW, Tam CM, Shen LY, Zeng SX, Ho CM (2006) Environmental performance assessment: perceptions of project managers on the relationship between operational and environmental performance indicators. Constr Manag Econ 24(3):287–299
go back to reference Tam VW, Shen LY, Fung IW, Wang JY (2007) Controlling construction waste by implementing governmental ordinances in Hong Kong. Constr Innov 7(2):149–166 Tam VW, Shen LY, Fung IW, Wang JY (2007) Controlling construction waste by implementing governmental ordinances in Hong Kong. Constr Innov 7(2):149–166
go back to reference Thatcher JB, Stepina LP, Boyle RJ (2002) Turnover of information technology workers: examining empirically the influence of attitudes, job characteristics, and external markets. J Manag Inf Syst 19(3):231–261 Thatcher JB, Stepina LP, Boyle RJ (2002) Turnover of information technology workers: examining empirically the influence of attitudes, job characteristics, and external markets. J Manag Inf Syst 19(3):231–261
go back to reference Ton Z, Huckman RS (2008) Managing the impact of employee turnover on performance: the role of process conformance. Organ Sci 19(1):56–68 Ton Z, Huckman RS (2008) Managing the impact of employee turnover on performance: the role of process conformance. Organ Sci 19(1):56–68
go back to reference Torres AC (2016) Is this work sustainable? Teacher turnover and perceptions of workload in charter management organizations. Urban Educ 51(8):891–914 Torres AC (2016) Is this work sustainable? Teacher turnover and perceptions of workload in charter management organizations. Urban Educ 51(8):891–914
go back to reference Treloar GJ, Gupta H, Love PE, Nguyen B (2003) An analysis of factors influencing waste minimisation and use of recycled materials for the construction of residential buildings. Manag Environ Qual Int J 14(1):134–145 Treloar GJ, Gupta H, Love PE, Nguyen B (2003) An analysis of factors influencing waste minimisation and use of recycled materials for the construction of residential buildings. Manag Environ Qual Int J 14(1):134–145
go back to reference Vieira CS, Pereira PM, de Lurdes Lopes M (2016) Recycled construction and demolition wastes as filling material for geosynthetic reinforced structures. interface properties. J Clean Prod 124:299–311 Vieira CS, Pereira PM, de Lurdes Lopes M (2016) Recycled construction and demolition wastes as filling material for geosynthetic reinforced structures. interface properties. J Clean Prod 124:299–311
go back to reference Wang H (2014) Sustainable construction process: using construction virtual prototyping technology for visualization and simulation of CO2 emissions. Doctoral dissertation. The Hong Kong Polytechnic University Wang H (2014) Sustainable construction process: using construction virtual prototyping technology for visualization and simulation of CO2 emissions. Doctoral dissertation. The Hong Kong Polytechnic University
go back to reference Wang J, Li Z, Tam VW (2015) Identifying best design strategies for construction waste minimization. J Clean Prod 92:237–247 Wang J, Li Z, Tam VW (2015) Identifying best design strategies for construction waste minimization. J Clean Prod 92:237–247
go back to reference Weng GS, Zailani S, Iranmanesh M, Hyun SS (2017) Mobile taxi booking application service’s continuance usage intention by users. Transp Res Part D Transp Environ 57:207–216 Weng GS, Zailani S, Iranmanesh M, Hyun SS (2017) Mobile taxi booking application service’s continuance usage intention by users. Transp Res Part D Transp Environ 57:207–216
go back to reference Wiezer N, Smulders P, Nelemans R (2005) De invloed van organisatiekenmerken op werkdruk in organisaties. Tijdschrift voor Arbeidsvraagstukken 21(3):228–244 Wiezer N, Smulders P, Nelemans R (2005) De invloed van organisatiekenmerken op werkdruk in organisaties. Tijdschrift voor Arbeidsvraagstukken 21(3):228–244
go back to reference Wong JK, Li H, Wang H, Huang T, Luo E, Li V (2013) Toward low-carbon construction processes: the visualisation of predicted emission via virtual prototyping technology. Autom Constr 33:72–78 Wong JK, Li H, Wang H, Huang T, Luo E, Li V (2013) Toward low-carbon construction processes: the visualisation of predicted emission via virtual prototyping technology. Autom Constr 33:72–78
go back to reference Yahya K, Halim Boussabaine A (2006) Eco-costing of construction waste. Manag Environ Qual Int J 17(1):6–19 Yahya K, Halim Boussabaine A (2006) Eco-costing of construction waste. Manag Environ Qual Int J 17(1):6–19
go back to reference Yuan H (2013) Key indicators for assessing the effectiveness of waste management in construction projects. Ecol Ind 24:476–484 Yuan H (2013) Key indicators for assessing the effectiveness of waste management in construction projects. Ecol Ind 24:476–484
go back to reference Yusof NA, Abidin NZ, Iranmanesh M (2016a) Environmental practices in construction firms. Procedia Eng 145:242–249 Yusof NA, Abidin NZ, Iranmanesh M (2016a) Environmental practices in construction firms. Procedia Eng 145:242–249
go back to reference Yusof NA, Abidin NZ, Zailani SHM, Govindan K, Iranmanesh M (2016b) Linking the environmental practice of construction firms and the environmental behaviour of practitioners in construction projects. J Clean Prod 121:64–71 Yusof NA, Abidin NZ, Zailani SHM, Govindan K, Iranmanesh M (2016b) Linking the environmental practice of construction firms and the environmental behaviour of practitioners in construction projects. J Clean Prod 121:64–71
go back to reference Yusof N, Awang H, Iranmanesh M (2017) Determinants and outcomes of environmental practices in Malaysian construction projects. J Clean Prod 156:345–354 Yusof N, Awang H, Iranmanesh M (2017) Determinants and outcomes of environmental practices in Malaysian construction projects. J Clean Prod 156:345–354
go back to reference Zailani S, Iranmanesh M, Nikbin D, Jumadi HB (2014) Determinants and environmental outcome of green technology innovation adoption in the transportation industry in Malaysia. Asian J Technol Innov 22(2):286–301 Zailani S, Iranmanesh M, Nikbin D, Jumadi HB (2014) Determinants and environmental outcome of green technology innovation adoption in the transportation industry in Malaysia. Asian J Technol Innov 22(2):286–301
go back to reference Zailani S, Iranmanesh M, Masron TA, Chan TH (2016) Is the intention to use public transport for different travel purposes determined by different factors? Transp Res Part D Transp Environ 49:18–24 Zailani S, Iranmanesh M, Masron TA, Chan TH (2016) Is the intention to use public transport for different travel purposes determined by different factors? Transp Res Part D Transp Environ 49:18–24
go back to reference Zainuddin ZB, Zailani S, Govindan K, Iranmanesh M, Amran A (2017) Determinants and outcome of a clean development mechanism in Malaysia. J Clean Prod 142:1979–1986 Zainuddin ZB, Zailani S, Govindan K, Iranmanesh M, Amran A (2017) Determinants and outcome of a clean development mechanism in Malaysia. J Clean Prod 142:1979–1986
go back to reference Zhang ZH, Shen LY, Scott D (2000) Promoting urbanization towards sustainable development in China. J Tsinghua Univ (Science and Technology) 40(1):1–6 Zhang ZH, Shen LY, Scott D (2000) Promoting urbanization towards sustainable development in China. J Tsinghua Univ (Science and Technology) 40(1):1–6
Metadata
Title
Effects of low carbon waste practices on job satisfaction of site managers through job stress
Authors
Reza Esmaeilifar
Mohammad Iranmanesh
Mohd Wira Mohd Shafiei
Sunghyup Sean Hyun
Publication date
09-05-2018
Publisher
Springer Berlin Heidelberg
Published in
Review of Managerial Science / Issue 1/2020
Print ISSN: 1863-6683
Electronic ISSN: 1863-6691
DOI
https://doi.org/10.1007/s11846-018-0288-x

Other articles of this Issue 1/2020

Review of Managerial Science 1/2020 Go to the issue