Skip to main content
Top

2018 | Supplement | Chapter

Fuzzy Bi-objective Chance-Constrained Programming Model for Timetable Optimization of a Bus Route

Authors : Hejia Du, Hongguang Ma, Xiang Li

Published in: Advances in Computational Intelligence Systems

Publisher: Springer International Publishing

Activate our intelligent search to find suitable subject content or patents.

search-config
loading …

Abstract

Timetable optimization is essential to the improvement of a bus operating company’s economic profits, quality of service and competitiveness in the market. The most previous researches studied the bus timetabling with assuming the passenger demand is certain but it varies in practice. In this study, we consider a timetable optimization problem of a single bus line under fuzzy environment. Assuming the passenger quantity in per time segment is a fuzzy value, a fuzzy bi-objective programming model that maximizes the total passenger volume and minimizes the total bus travel time under a capacity rate constraint is established. This chance constrained programming model is formulated with the passenger volume and capacity rate under certain chance constraints. Furthermore, a genetic algorithm of variable length is designed to solve the proposed model. Finally, we present a case study that utilizing real data obtained from a major Beijing bus operating company to illustrate the proposed model and algorithm.

Dont have a licence yet? Then find out more about our products and how to get one now:

Springer Professional "Wirtschaft+Technik"

Online-Abonnement

Mit Springer Professional "Wirtschaft+Technik" erhalten Sie Zugriff auf:

  • über 102.000 Bücher
  • über 537 Zeitschriften

aus folgenden Fachgebieten:

  • Automobil + Motoren
  • Bauwesen + Immobilien
  • Business IT + Informatik
  • Elektrotechnik + Elektronik
  • Energie + Nachhaltigkeit
  • Finance + Banking
  • Management + Führung
  • Marketing + Vertrieb
  • Maschinenbau + Werkstoffe
  • Versicherung + Risiko

Jetzt Wissensvorsprung sichern!

Springer Professional "Technik"

Online-Abonnement

Mit Springer Professional "Technik" erhalten Sie Zugriff auf:

  • über 67.000 Bücher
  • über 390 Zeitschriften

aus folgenden Fachgebieten:

  • Automobil + Motoren
  • Bauwesen + Immobilien
  • Business IT + Informatik
  • Elektrotechnik + Elektronik
  • Energie + Nachhaltigkeit
  • Maschinenbau + Werkstoffe




 

Jetzt Wissensvorsprung sichern!

Springer Professional "Wirtschaft"

Online-Abonnement

Mit Springer Professional "Wirtschaft" erhalten Sie Zugriff auf:

  • über 67.000 Bücher
  • über 340 Zeitschriften

aus folgenden Fachgebieten:

  • Bauwesen + Immobilien
  • Business IT + Informatik
  • Finance + Banking
  • Management + Führung
  • Marketing + Vertrieb
  • Versicherung + Risiko




Jetzt Wissensvorsprung sichern!

Literature
go back to reference Wu, Y.H., Yang, H., Tang, J.F., Yu, Y.: Multi-objective re-synchronizing of bus timetable: model, complexity and solution. Transp. Res. Part C 67, 149–168 (2016)CrossRef Wu, Y.H., Yang, H., Tang, J.F., Yu, Y.: Multi-objective re-synchronizing of bus timetable: model, complexity and solution. Transp. Res. Part C 67, 149–168 (2016)CrossRef
go back to reference Salicrú, M., Fleurent, C., Armengol, J.M.: Timetable-based operation in urban transport: run-time optimisation and improvements in the operating process. Transp. Res. Part A 45, 721–740 (2011). doi:10.1016/j.tra.2011.04.013 Salicrú, M., Fleurent, C., Armengol, J.M.: Timetable-based operation in urban transport: run-time optimisation and improvements in the operating process. Transp. Res. Part A 45, 721–740 (2011). doi:10.​1016/​j.​tra.​2011.​04.​013
go back to reference Cepeda, M., Cominetti, R., Florian, M.: A frequency-based assignment model for congested transit networks with strict capacity constraints: Characterization and computation of equilibria. Transp. Res. Part B: Methodol. 40(6), 437–459 (2006). doi:10.1016/j.trb.2005.05.006 CrossRef Cepeda, M., Cominetti, R., Florian, M.: A frequency-based assignment model for congested transit networks with strict capacity constraints: Characterization and computation of equilibria. Transp. Res. Part B: Methodol. 40(6), 437–459 (2006). doi:10.​1016/​j.​trb.​2005.​05.​006 CrossRef
go back to reference Holland, J.H.: Adaptation in Natural and Artificial Systems: An Introductory Analysis with Applications to Biology, Control, and Artificial Intelligence. University of Michigan Press, Oxford (1975)MATH Holland, J.H.: Adaptation in Natural and Artificial Systems: An Introductory Analysis with Applications to Biology, Control, and Artificial Intelligence. University of Michigan Press, Oxford (1975)MATH
go back to reference Zhou, J.D., Li, X., Kar, S.: Time consistent fuzzy multi-period rolling portfolio optimization with adaptive risk aversion factor. J. Ambient Intell. Hum. Comput, 1–16 (2017). doi:10.1007/s12652-017-0478-4 Zhou, J.D., Li, X., Kar, S.: Time consistent fuzzy multi-period rolling portfolio optimization with adaptive risk aversion factor. J. Ambient Intell. Hum. Comput, 1–16 (2017). doi:10.​1007/​s12652-017-0478-4
go back to reference Zhu, G.Y., Yang, C.G., Huang, D., Zhang, P.: A combined forecasting model of urban rail transit peak-hour cross-section passenger volume. In: Cota International Conference of Transportation Professionals, pp. 1040–1052 (2015) Zhu, G.Y., Yang, C.G., Huang, D., Zhang, P.: A combined forecasting model of urban rail transit peak-hour cross-section passenger volume. In: Cota International Conference of Transportation Professionals, pp. 1040–1052 (2015)
Metadata
Title
Fuzzy Bi-objective Chance-Constrained Programming Model for Timetable Optimization of a Bus Route
Authors
Hejia Du
Hongguang Ma
Xiang Li
Copyright Year
2018
DOI
https://doi.org/10.1007/978-3-319-66939-7_27

Premium Partner