Abstract

In recent years, the demand has been increasing for ground improvement work for seismic reinforcement and as a countermeasure to liquefaction utilizing Information Construction Technology, Internet of Things, and Building Information Modeling. Therefore, it is expected that more and more attention will be paid to construction management related to the quality and work progress of the soil improvement body as the demand for ground improvement work increases. On the other hand, since the actual ground is assumed to be heterogeneous in geological composition and soil quality, the thickness of the layer that will be subjected to the ground improvement work and the depth to the bearing stratum may be different from those assumed at the design stage. In addition, since the number of ground surveys that have been conducted for ground improvement work is limited, it is not easy to promptly evaluate the validity of actual construction specifications against the design values of the improvement body in locations far from where the ground surveys were done. Therefore, in order to solve the above problems, this study addresses the current value measured and recorded during construction by the deep mixing method, which is one of the ground improvement methods. Approximation of N-value that is a strength index of the target ground is examined, considering the correlation between the current value and the N-value obtained from the standard penetration test (SPT) conducted in the preliminary ground survey. In addition, the applicability of the estimated N-value to an actual construction is examined by formulating an N-value approximation. Based on the obtained current value, this study clarified to possible to formulate an approximation for the N-value and to use this information as feedback at the time of construction.

Dont have a licence yet? Then find out more about our products and how to get one now:

Springer Professional "Wirtschaft+Technik"

Online-Abonnement

Mit Springer Professional "Wirtschaft+Technik" erhalten Sie Zugriff auf:

  • über 102.000 Bücher
  • über 537 Zeitschriften

aus folgenden Fachgebieten:

  • Automobil + Motoren
  • Bauwesen + Immobilien
  • Business IT + Informatik
  • Elektrotechnik + Elektronik
  • Energie + Nachhaltigkeit
  • Finance + Banking
  • Management + Führung
  • Marketing + Vertrieb
  • Maschinenbau + Werkstoffe
  • Versicherung + Risiko

Jetzt Wissensvorsprung sichern!

Springer Professional "Technik"

Online-Abonnement

Mit Springer Professional "Technik" erhalten Sie Zugriff auf:

  • über 67.000 Bücher
  • über 390 Zeitschriften

aus folgenden Fachgebieten:

  • Automobil + Motoren
  • Bauwesen + Immobilien
  • Business IT + Informatik
  • Elektrotechnik + Elektronik
  • Energie + Nachhaltigkeit
  • Maschinenbau + Werkstoffe




 

Jetzt Wissensvorsprung sichern!

Springer Professional "Wirtschaft"

Online-Abonnement

Mit Springer Professional "Wirtschaft" erhalten Sie Zugriff auf:

  • über 67.000 Bücher
  • über 340 Zeitschriften

aus folgenden Fachgebieten:

  • Bauwesen + Immobilien
  • Business IT + Informatik
  • Finance + Banking
  • Management + Führung
  • Marketing + Vertrieb
  • Versicherung + Risiko




Jetzt Wissensvorsprung sichern!

Literature
1.
go back to reference Adachi Y, Kizuki T, Tsuchiya J, Inazumi S (2018) Visualization of construction works by ICT on pile foundation and ground improvement. J Jpn Geotech Soc 66(1):24–25 Adachi Y, Kizuki T, Tsuchiya J, Inazumi S (2018) Visualization of construction works by ICT on pile foundation and ground improvement. J Jpn Geotech Soc 66(1):24–25
3.
go back to reference Hioki K, Iwanaga S, Hashimoto A, Murakami S (2014) Permeability test and hydraulic conductivity of improved soils by deep mixing method. J Soc Mater Sci Jpn 63(1):28–31CrossRef Hioki K, Iwanaga S, Hashimoto A, Murakami S (2014) Permeability test and hydraulic conductivity of improved soils by deep mixing method. J Soc Mater Sci Jpn 63(1):28–31CrossRef
5.
go back to reference Japanese Industrial Standards Committee (JISC) (2005) Method for standard penetration test (JIS A 1219). Japanese Industrial Standards Committee Japanese Industrial Standards Committee (JISC) (2005) Method for standard penetration test (JIS A 1219). Japanese Industrial Standards Committee
6.
go back to reference Japanese Industrial Standards Committee (JISC) (2013) Method for Swedish weight sounding test (JIS A 1221). Japanese Industrial Standards Committee Japanese Industrial Standards Committee (JISC) (2013) Method for Swedish weight sounding test (JIS A 1221). Japanese Industrial Standards Committee
7.
go back to reference Kizuki T, Sawaguchi H, Imai T, Takaue T, Tsuchiya J, Inazumi S (2018) An introduction of real-time management system for applying deep-mixing method with large diameter and improvement depth (DCS method). J Soc Mater Sci Jpn 67(1):93–98CrossRef Kizuki T, Sawaguchi H, Imai T, Takaue T, Tsuchiya J, Inazumi S (2018) An introduction of real-time management system for applying deep-mixing method with large diameter and improvement depth (DCS method). J Soc Mater Sci Jpn 67(1):93–98CrossRef
8.
go back to reference Kizuki T, Sawaguchi H, Imai T, Takaue T, Tsuchiya J and Inazumi S (2016) An introduction of real-time management system for applying deep-mixing method with large diameter and improvement depth (DCS method). In: Proceedings of the 12th National Symposium on Ground Improvement, pp 451–454 Kizuki T, Sawaguchi H, Imai T, Takaue T, Tsuchiya J and Inazumi S (2016) An introduction of real-time management system for applying deep-mixing method with large diameter and improvement depth (DCS method). In: Proceedings of the 12th National Symposium on Ground Improvement, pp 451–454
9.
go back to reference Mitachi T, Kudo Y (1996) Method for predicting in-situ undrained strength of clays based on the suction value and unconfined compressive strength. J Jpn Soc Civ Eng 541:147–157 Mitachi T, Kudo Y (1996) Method for predicting in-situ undrained strength of clays based on the suction value and unconfined compressive strength. J Jpn Soc Civ Eng 541:147–157
10.
go back to reference Mochida Y and Hardi I (2016) Promotion of ICT utilization by electric resistivity management in fluidization treatment process for ground improvement. In: Proceedings of the 6th International Conference on Geotechnique, Construction Materials and Environment, pp.14–16 Mochida Y and Hardi I (2016) Promotion of ICT utilization by electric resistivity management in fluidization treatment process for ground improvement. In: Proceedings of the 6th International Conference on Geotechnique, Construction Materials and Environment, pp.14–16
11.
go back to reference Mochida Y, Tsukamoto M (2013) Development of ground improvement method using soil fluidization process due to local material and cement solidification (Part 1. construction and management method). AIJ J Technol Des Archit Inst Jpn 19(42):485–490CrossRef Mochida Y, Tsukamoto M (2013) Development of ground improvement method using soil fluidization process due to local material and cement solidification (Part 1. construction and management method). AIJ J Technol Des Archit Inst Jpn 19(42):485–490CrossRef
12.
go back to reference Mohamed AW, Bernard V (2011) Trends of productivity growth in the construction industry across Europe, US and Japan. Constr Manag Econ 29(6):635–644CrossRef Mohamed AW, Bernard V (2011) Trends of productivity growth in the construction industry across Europe, US and Japan. Constr Manag Econ 29(6):635–644CrossRef
13.
go back to reference Sanwa Kizai Co. Ltd. (2017) Sanwa rock auger series & rock doughnut auger series to apply for lager diameter & tough soil condition. Sanwa Kizai Co. Ltd., pp.1–2 Sanwa Kizai Co. Ltd. (2017) Sanwa rock auger series & rock doughnut auger series to apply for lager diameter & tough soil condition. Sanwa Kizai Co. Ltd., pp.1–2
14.
go back to reference Takechi K, Fujii M, Gao Y, Arai MJ (2014) Quality control on the compressive strength of the deep mixing soil using the electric resistivity method. AIJ J Technol Des Archit Inst Jpn 20(44):89–94CrossRef Takechi K, Fujii M, Gao Y, Arai MJ (2014) Quality control on the compressive strength of the deep mixing soil using the electric resistivity method. AIJ J Technol Des Archit Inst Jpn 20(44):89–94CrossRef
15.
go back to reference Tamura M, Sato H, Mizutani Y, Kawamura M, Koda M, Osakabe T (2004) Development of 3-dimensional quality control system in foundation works, soil mechanics and foundation engineering. Jpn Geotech Soc 53(4):18–20 Tamura M, Sato H, Mizutani Y, Kawamura M, Koda M, Osakabe T (2004) Development of 3-dimensional quality control system in foundation works, soil mechanics and foundation engineering. Jpn Geotech Soc 53(4):18–20
16.
go back to reference The Building Center of Japan (BCJ) (2008) Guidelines on design and quality control of improved ground for buildings (Revised Edition). The Building Center of Japan The Building Center of Japan (BCJ) (2008) Guidelines on design and quality control of improved ground for buildings (Revised Edition). The Building Center of Japan
17.
go back to reference The Japanese Geotechnical Society (JGS) (2015) Japanese geotechnical society standards: laboratory testing standards of geomaterial. The Japanese Geotechnical Society, Vol. 1 The Japanese Geotechnical Society (JGS) (2015) Japanese geotechnical society standards: laboratory testing standards of geomaterial. The Japanese Geotechnical Society, Vol. 1
18.
go back to reference Utsuki S, Nakaya M, Sasaki T (2016) Construction of a geological information management system and application to construction sites. J Jpn Soc Civ Eng (F3) 72(1):24–31 Utsuki S, Nakaya M, Sasaki T (2016) Construction of a geological information management system and application to construction sites. J Jpn Soc Civ Eng (F3) 72(1):24–31
Metadata
Title
Ground improvement work with N-value estimation by measurement of current value
Authors
Shinya Inazumi
Yuji Adachi
Hong Son Nguyen
Toshiaki Takaue
Publication date
01-09-2021
Publisher
Springer International Publishing
Published in
Innovative Infrastructure Solutions / Issue 3/2021
Print ISSN: 2364-4176
Electronic ISSN: 2364-4184
DOI
https://doi.org/10.1007/s41062-021-00522-z

Other articles of this Issue 3/2021

Innovative Infrastructure Solutions 3/2021 Go to the issue