Skip to main content
Top

2022 | OriginalPaper | Chapter

Implementation of Priority Rules in Flexible Manufacturing System Scheduling with Mean Tardiness

Authors : M. Nageswara Rao, T. Vijaya Kumar, K. Prakash Babu, G. R. Sanjay Krishna, Sanjay Kumar Singh

Published in: Technology Innovation in Mechanical Engineering

Publisher: Springer Nature Singapore

Activate our intelligent search to find suitable subject content or patents.

search-config
loading …

Abstract

The Adaptable Manufacturing System (FMS) is an amalgam framework containing of basics similar to work environments, mechanized putting away and recuperation frameworks, and material control gadgets like machines and AGVs. An endeavor is made to concentrate simultaneously the machine and AGVs arranging highlights in a FMS for decrease of the tardiness priority rules is used to solve FMS simultaneous scheduling problems. 120 issues and their current arrangements with various methodologies are analyzed.

Dont have a licence yet? Then find out more about our products and how to get one now:

Springer Professional "Wirtschaft+Technik"

Online-Abonnement

Mit Springer Professional "Wirtschaft+Technik" erhalten Sie Zugriff auf:

  • über 102.000 Bücher
  • über 537 Zeitschriften

aus folgenden Fachgebieten:

  • Automobil + Motoren
  • Bauwesen + Immobilien
  • Business IT + Informatik
  • Elektrotechnik + Elektronik
  • Energie + Nachhaltigkeit
  • Finance + Banking
  • Management + Führung
  • Marketing + Vertrieb
  • Maschinenbau + Werkstoffe
  • Versicherung + Risiko

Jetzt Wissensvorsprung sichern!

Springer Professional "Technik"

Online-Abonnement

Mit Springer Professional "Technik" erhalten Sie Zugriff auf:

  • über 67.000 Bücher
  • über 390 Zeitschriften

aus folgenden Fachgebieten:

  • Automobil + Motoren
  • Bauwesen + Immobilien
  • Business IT + Informatik
  • Elektrotechnik + Elektronik
  • Energie + Nachhaltigkeit
  • Maschinenbau + Werkstoffe




 

Jetzt Wissensvorsprung sichern!

Literature
1.
go back to reference Nageswara Rao, M., Narayana Rao, K., Ranga Janardhana, G.: Machines and AGVs scheduling in flexible manufacturing system with mean tardiness criterion. Int. J. Adv. Mater. Manuf. Charact. 4, 100–105 (2014) Nageswara Rao, M., Narayana Rao, K., Ranga Janardhana, G.: Machines and AGVs scheduling in flexible manufacturing system with mean tardiness criterion. Int. J. Adv. Mater. Manuf. Charact. 4, 100–105 (2014)
2.
go back to reference Subbaiah, K, V., Nageswara Rao, M., & Narayanarao, K., Scheduling of AGVs and Machines in FMS with Make Span Criteria Using Sheep Flock Heredity Algorithm. International Journal of Physical Sciences, 4(2), 139–148, 2010. Subbaiah, K, V., Nageswara Rao, M., & Narayanarao, K., Scheduling of AGVs and Machines in FMS with Make Span Criteria Using Sheep Flock Heredity Algorithm. International Journal of Physical Sciences, 4(2), 139–148, 2010.
3.
go back to reference Medikondu Nageswararao, Dr.K.Narayanarao, Dr.G.Ranagajanardhana “Simultaneous Scheduling of Machines and AGVs in Flexible Manufacturing System with Minimization of Tardiness Criterion” International Conference on Advances in Manufacturing and Materials Engineering (ICAMME-2014),2014. Medikondu Nageswararao, Dr.K.Narayanarao, Dr.G.Ranagajanardhana “Simultaneous Scheduling of Machines and AGVs in Flexible Manufacturing System with Minimization of Tardiness Criterion” International Conference on Advances in Manufacturing and Materials Engineering (ICAMME-2014),2014.
4.
go back to reference Nageswara Rao, M., Narayana Rao, K., Ranga Janardhana, G.: Scheduling of Machines and Automated Guided Vehicle in FMS using Gravitational search algorithm. Appl. Mech. Mater. 867, 307–313 (2017)CrossRef Nageswara Rao, M., Narayana Rao, K., Ranga Janardhana, G.: Scheduling of Machines and Automated Guided Vehicle in FMS using Gravitational search algorithm. Appl. Mech. Mater. 867, 307–313 (2017)CrossRef
5.
go back to reference M. Nageswara Rao, K. Lokesh, V. Harish, Ch. Sai Bharath, Y. Venkatesh, Vara Kumari. S, Simultaneous Scheduling through Heuristic Algorithm, International Journal of Engineering & Technology, 7 (2.32), 125–130, 2018. M. Nageswara Rao, K. Lokesh, V. Harish, Ch. Sai Bharath, Y. Venkatesh, Vara Kumari. S, Simultaneous Scheduling through Heuristic Algorithm, International Journal of Engineering & Technology, 7 (2.32), 125–130, 2018.
6.
go back to reference Nageswara Rao, M., Narayana Rao, K., Ranga Janardhana, G.: Integrated Scheduling of Machines and AGVs in FMS by Using Dispatching Rules. Journal of Production Engineering 20(1), 75–84 (2017)CrossRef Nageswara Rao, M., Narayana Rao, K., Ranga Janardhana, G.: Integrated Scheduling of Machines and AGVs in FMS by Using Dispatching Rules. Journal of Production Engineering 20(1), 75–84 (2017)CrossRef
7.
go back to reference M. Nageswara Rao, S.Vara Kumari,P. Manohar, B. Madesh, P. Naveen Krishna, R. Suraj Krishna, Simultaneous Scheduling of Machines and AGVs in FMS Through Ant Colony Optimization Algorithm. International Journal of Engineering and Advanced Technology (IJEAT), 9(3), 1392–1397, 202 M. Nageswara Rao, S.Vara Kumari,P. Manohar, B. Madesh, P. Naveen Krishna, R. Suraj Krishna, Simultaneous Scheduling of Machines and AGVs in FMS Through Ant Colony Optimization Algorithm. International Journal of Engineering and Advanced Technology (IJEAT), 9(3), 1392–1397, 202
8.
go back to reference M. Nageswara Rao, Vara Kumari S., Praneeth I., Gaya Prasad K., D.Venkata Reddy E.Vineeth, D. Maheshwar Reddy. Simultaneous Scheduling of Machines and AGVs in FMS through Simulated Annealing Algorithm. International Journal of Innovative Technology and Exploring Engineering, 9(4), 2235–2240, 2020. M. Nageswara Rao, Vara Kumari S., Praneeth I., Gaya Prasad K., D.Venkata Reddy E.Vineeth, D. Maheshwar Reddy. Simultaneous Scheduling of Machines and AGVs in FMS through Simulated Annealing Algorithm. International Journal of Innovative Technology and Exploring Engineering, 9(4), 2235–2240, 2020.
9.
go back to reference Kanakavalli Prakash Babu, Vommi Vijaya Babu, Medikondu Nageswara Rao . Scheduling of Machines and AGVs Simultaneously in FMS through Hybrid Teaching Learning Based Optimization Algorithm. International Journal of Engineering and Advanced Technology, 9(2), 2048–2055, 2019. Kanakavalli Prakash Babu, Vommi Vijaya Babu, Medikondu Nageswara Rao . Scheduling of Machines and AGVs Simultaneously in FMS through Hybrid Teaching Learning Based Optimization Algorithm. International Journal of Engineering and Advanced Technology, 9(2), 2048–2055, 2019.
10.
go back to reference Durga Rajesh, K.V., Chalapathi, P.V., Nageswara Rao, M., Krishna, C.E., Anoop, K., Neeraj, Y.: An efficient sheep flock heredity algorithm for the cell formation problem. ARPN J. Eng. Appl. Sci. 12(21), 6074–6079 (2017) Durga Rajesh, K.V., Chalapathi, P.V., Nageswara Rao, M., Krishna, C.E., Anoop, K., Neeraj, Y.: An efficient sheep flock heredity algorithm for the cell formation problem. ARPN J. Eng. Appl. Sci. 12(21), 6074–6079 (2017)
11.
go back to reference Prakash Babu, K., Vijaya Babu, V., Nageswara Rao, M.: Implementation of heuristic algorithms to synchronized planning of machines and AGVs in FMS. Manag. Sci. Lett. 8(6), 543–554 (2018) Prakash Babu, K., Vijaya Babu, V., Nageswara Rao, M.: Implementation of heuristic algorithms to synchronized planning of machines and AGVs in FMS. Manag. Sci. Lett. 8(6), 543–554 (2018)
12.
go back to reference Dasore, A., Ramakrishna, K., Kiran, N.B.: Evaluation of heat and mass transfer coefficients at beetroot-air interface during convective drying. Interfacial Phenomena and Heat Transfer 8, 303–319 (2020)CrossRef Dasore, A., Ramakrishna, K., Kiran, N.B.: Evaluation of heat and mass transfer coefficients at beetroot-air interface during convective drying. Interfacial Phenomena and Heat Transfer 8, 303–319 (2020)CrossRef
13.
go back to reference Reddy, B.S.P., Rao, C.S.P.: A hybrid multi-objective GA for simultaneous scheduling of machines and AGVs in FMS. Int. J. Adv. Manuf. Technol. 31, 602–613 (2006)CrossRef Reddy, B.S.P., Rao, C.S.P.: A hybrid multi-objective GA for simultaneous scheduling of machines and AGVs in FMS. Int. J. Adv. Manuf. Technol. 31, 602–613 (2006)CrossRef
14.
go back to reference Metta, V.R., Ramakrishna, K., Dasore, A.: Thermal design of spiral plate heat exchanger through numerical modeling, Int. J. Mech. Eng. Tech. 9(7), 736–745 (2018) Metta, V.R., Ramakrishna, K., Dasore, A.: Thermal design of spiral plate heat exchanger through numerical modeling, Int. J. Mech. Eng. Tech. 9(7), 736–745 (2018)
15.
go back to reference Nageswara Rao, M. et al.: Application of BPSO in flexible manufacturing system scheduling. Int. J. Mech. Eng. Technol. 8(5), 186–195 (2017) Nageswara Rao, M. et al.: Application of BPSO in flexible manufacturing system scheduling. Int. J. Mech. Eng. Technol. 8(5), 186–195 (2017)
16.
go back to reference Sachin, G., Narasimha, K.K., Ramakrishna, K., Dasore, A.: Thermodynamic analysis and effects of replacing HFC by fourth generation refrigerants in VCR systems. Int. J. Air-cond. Ref. 26(1), 1850013–1–1850013–12 (2018) Sachin, G., Narasimha, K.K., Ramakrishna, K., Dasore, A.: Thermodynamic analysis and effects of replacing HFC by fourth generation refrigerants in VCR systems. Int. J. Air-cond. Ref. 26(1), 1850013–1–1850013–12 (2018)
17.
go back to reference Nageswara Rao, M., Dileep, K., Khadar, S.B., Vara Kumari, S.: Modrak algorithm to minimize completion time for n-jobs m-machines problem in flexible manufacturing system. Int. J. Emerg. Trends Eng. Res. 8(8), 4560–4566 (2020) Nageswara Rao, M., Dileep, K., Khadar, S.B., Vara Kumari, S.: Modrak algorithm to minimize completion time for n-jobs m-machines problem in flexible manufacturing system. Int. J. Emerg. Trends Eng. Res. 8(8), 4560–4566 (2020)
18.
go back to reference Sreekara Reddy, M.B.S., Ratnam, C., Rajyalakshmi, G., Manupati, V.K.: An effective hybrid multi objective evolutionary algorithm for solving real time event in flexible job shop scheduling problem. Measurement 114, 78–90 (2018) Sreekara Reddy, M.B.S., Ratnam, C., Rajyalakshmi, G., Manupati, V.K.: An effective hybrid multi objective evolutionary algorithm for solving real time event in flexible job shop scheduling problem. Measurement 114, 78–90 (2018)
19.
go back to reference Kanakavalli, P.B., Vommi, V.B., Nageswara Rao, M.: Fuzzy heuristic algorithm for simultaneous scheduling problems in flexible manufacturing system. Manage. Sci. Lett. 8(12), 1319–1330 (2018) Kanakavalli, P.B., Vommi, V.B., Nageswara Rao, M.: Fuzzy heuristic algorithm for simultaneous scheduling problems in flexible manufacturing system. Manage. Sci. Lett. 8(12), 1319–1330 (2018)
Metadata
Title
Implementation of Priority Rules in Flexible Manufacturing System Scheduling with Mean Tardiness
Authors
M. Nageswara Rao
T. Vijaya Kumar
K. Prakash Babu
G. R. Sanjay Krishna
Sanjay Kumar Singh
Copyright Year
2022
Publisher
Springer Nature Singapore
DOI
https://doi.org/10.1007/978-981-16-7909-4_91