Skip to main content
Top

2015 | OriginalPaper | Chapter

Integrated Mixed-Model Assembly Line Balancing with Unskilled Temporary Workers

Activate our intelligent search to find suitable subject content or patents.

search-config
loading …

Abstract

This study extends a single-model assembly line balancing problem to an integrated mixed-model assembly line balancing problem by incorporating unskilled temporary workers, who enhance productivity. An integer program that minimizes the sum of total workstation costs and salaries of skilled permanent and unskilled temporary workers within a specific cycle time is developed. The proposed models is based on particular features of a real-world problem including simultaneous assignments of skilled permanent and unskilled temporary workers as well as precedence restrictions for the tasks.

Dont have a licence yet? Then find out more about our products and how to get one now:

Springer Professional "Wirtschaft+Technik"

Online-Abonnement

Mit Springer Professional "Wirtschaft+Technik" erhalten Sie Zugriff auf:

  • über 102.000 Bücher
  • über 537 Zeitschriften

aus folgenden Fachgebieten:

  • Automobil + Motoren
  • Bauwesen + Immobilien
  • Business IT + Informatik
  • Elektrotechnik + Elektronik
  • Energie + Nachhaltigkeit
  • Finance + Banking
  • Management + Führung
  • Marketing + Vertrieb
  • Maschinenbau + Werkstoffe
  • Versicherung + Risiko

Jetzt Wissensvorsprung sichern!

Springer Professional "Technik"

Online-Abonnement

Mit Springer Professional "Technik" erhalten Sie Zugriff auf:

  • über 67.000 Bücher
  • über 390 Zeitschriften

aus folgenden Fachgebieten:

  • Automobil + Motoren
  • Bauwesen + Immobilien
  • Business IT + Informatik
  • Elektrotechnik + Elektronik
  • Energie + Nachhaltigkeit
  • Maschinenbau + Werkstoffe




 

Jetzt Wissensvorsprung sichern!

Springer Professional "Wirtschaft"

Online-Abonnement

Mit Springer Professional "Wirtschaft" erhalten Sie Zugriff auf:

  • über 67.000 Bücher
  • über 340 Zeitschriften

aus folgenden Fachgebieten:

  • Bauwesen + Immobilien
  • Business IT + Informatik
  • Finance + Banking
  • Management + Führung
  • Marketing + Vertrieb
  • Versicherung + Risiko




Jetzt Wissensvorsprung sichern!

Literature
go back to reference Bryton, B.: Balancing of a continuous production line. M.S. thesis, Northwestern University, Evanston, IL (1954) Bryton, B.: Balancing of a continuous production line. M.S. thesis, Northwestern University, Evanston, IL (1954)
go back to reference Corominas, A., Pastor, R., Plans, J.: Balancing assembly line with skilled and unskilled workers. Omega 36, 126–1132 (2008)CrossRef Corominas, A., Pastor, R., Plans, J.: Balancing assembly line with skilled and unskilled workers. Omega 36, 126–1132 (2008)CrossRef
go back to reference Moon, I.K., Logendran, R., Lee, J.H.: Integrated assembly line balancing with resource restrictions. Int. J. Prod. Res. 47, 5525–5541 (2009)MATHCrossRef Moon, I.K., Logendran, R., Lee, J.H.: Integrated assembly line balancing with resource restrictions. Int. J. Prod. Res. 47, 5525–5541 (2009)MATHCrossRef
go back to reference Moon, I.K., Shin, S.H., Kim, D.W.: Integrated assembly line balancing with skilled and unskilled workers. IFIP Adv. Inf. Commun. Technol. 438(1), 459–466 (2014)CrossRef Moon, I.K., Shin, S.H., Kim, D.W.: Integrated assembly line balancing with skilled and unskilled workers. IFIP Adv. Inf. Commun. Technol. 438(1), 459–466 (2014)CrossRef
go back to reference Scholl, A., Becker, C.: State-of-the-art exact and heuristic solution procedures for simple assembly line balancing. Eur. J. Oper. Res. 168, 666–693 (2006)MATHMathSciNetCrossRef Scholl, A., Becker, C.: State-of-the-art exact and heuristic solution procedures for simple assembly line balancing. Eur. J. Oper. Res. 168, 666–693 (2006)MATHMathSciNetCrossRef
Metadata
Title
Integrated Mixed-Model Assembly Line Balancing with Unskilled Temporary Workers
Authors
Dongwook Kim
Jinwoo Park
Ilkyeong Moon
Copyright Year
2015
DOI
https://doi.org/10.1007/978-3-319-22759-7_38

Premium Partner