Skip to main content
Top

2019 | OriginalPaper | Chapter

Integrated Production Scheduling and Distribution Planning with Time Windows

Authors : Saadettin Erhan Kesen, Tolga Bektaş

Published in: Lean and Green Supply Chain Management

Publisher: Springer International Publishing

Activate our intelligent search to find suitable subject content or patents.

search-config
loading …

Abstract

Ensuring timely product deliveries in supply chains depends on the decisions made at various stages of the supply chain, including the production stage where commodities are made available, and the distribution stage where shipments are made to customers within requested time windows. Delivery times depend on the distribution plans, which are inherently linked to the production schedules, as a commodity must first be produced or procured before being sent onwards in the supply chain. One way to ensure that the delivery times are respected is to perform direct shipments, but this is often costly. In contrast, products can be consolidated whereby several customers are visited on a given vehicle route, but this may result in either early or late deliveries. The challenge is then to devise lean production and distribution schedules that eliminate any redundancy in delivery times. In this chapter, we present an integrated production and outbound distribution scheduling problem with time windows arising in a supply chain. The problem involves jointly deciding on production and distribution operations where a manufacturer is committed first to processing a given set of orders and then to distributing them to the respective customers in different locations. The orders first undergo single processing through a set of identical parallel machines. Once completed, they are delivered by a fleet of vehicles in such a way so as to meet the customer time windows. The objective is to improve the timeliness of the deliveries, which is achieved by minimizing the earliness or tardiness of each order in reaching the customer. The chapter formally introduces the problem, describes integer linear programming formulations for two variants of the problem, and presents computational results on solving randomly generated instances with the proposed formulations.

Dont have a licence yet? Then find out more about our products and how to get one now:

Springer Professional "Wirtschaft+Technik"

Online-Abonnement

Mit Springer Professional "Wirtschaft+Technik" erhalten Sie Zugriff auf:

  • über 102.000 Bücher
  • über 537 Zeitschriften

aus folgenden Fachgebieten:

  • Automobil + Motoren
  • Bauwesen + Immobilien
  • Business IT + Informatik
  • Elektrotechnik + Elektronik
  • Energie + Nachhaltigkeit
  • Finance + Banking
  • Management + Führung
  • Marketing + Vertrieb
  • Maschinenbau + Werkstoffe
  • Versicherung + Risiko

Jetzt Wissensvorsprung sichern!

Springer Professional "Technik"

Online-Abonnement

Mit Springer Professional "Technik" erhalten Sie Zugriff auf:

  • über 67.000 Bücher
  • über 390 Zeitschriften

aus folgenden Fachgebieten:

  • Automobil + Motoren
  • Bauwesen + Immobilien
  • Business IT + Informatik
  • Elektrotechnik + Elektronik
  • Energie + Nachhaltigkeit
  • Maschinenbau + Werkstoffe




 

Jetzt Wissensvorsprung sichern!

Springer Professional "Wirtschaft"

Online-Abonnement

Mit Springer Professional "Wirtschaft" erhalten Sie Zugriff auf:

  • über 67.000 Bücher
  • über 340 Zeitschriften

aus folgenden Fachgebieten:

  • Bauwesen + Immobilien
  • Business IT + Informatik
  • Finance + Banking
  • Management + Führung
  • Marketing + Vertrieb
  • Versicherung + Risiko




Jetzt Wissensvorsprung sichern!

Literature
go back to reference Armstrong, R. S., Gao, S., & Lei, L. (2008). A zero-inventory production and distribution problem with a fixed customer sequence. Annals of Operations Research, 159, 395–414.CrossRef Armstrong, R. S., Gao, S., & Lei, L. (2008). A zero-inventory production and distribution problem with a fixed customer sequence. Annals of Operations Research, 159, 395–414.CrossRef
go back to reference Averbakh, I., & Baysan, M. (2012). Semi-online two-level supply chain scheduling problems. Journal of Scheduling, 15, 381–390.CrossRef Averbakh, I., & Baysan, M. (2012). Semi-online two-level supply chain scheduling problems. Journal of Scheduling, 15, 381–390.CrossRef
go back to reference Averbakh, I., & Xue, Z. (2007). On-line supply chain scheduling problems with preemptions. European Journal of Operational Research, 181, 500–504.CrossRef Averbakh, I., & Xue, Z. (2007). On-line supply chain scheduling problems with preemptions. European Journal of Operational Research, 181, 500–504.CrossRef
go back to reference Baker, K. R., & Scudder, G. D. (1990). Sequencing with earliness and tardiness penalties: A review. Operations Research, 38, 22–36.CrossRef Baker, K. R., & Scudder, G. D. (1990). Sequencing with earliness and tardiness penalties: A review. Operations Research, 38, 22–36.CrossRef
go back to reference Biskup, D., Herrman, J., & Gupta, J. N. D. (2008). Scheduling identical parallel machines to minimize total tardiness. International Journal of Production Economics, 115, 134–142.CrossRef Biskup, D., Herrman, J., & Gupta, J. N. D. (2008). Scheduling identical parallel machines to minimize total tardiness. International Journal of Production Economics, 115, 134–142.CrossRef
go back to reference Chang, Y.-C., & Lee, C.-Y. (2004). Machine scheduling with job delivery coordination. European Journal of Operational Research, 158, 470–487.CrossRef Chang, Y.-C., & Lee, C.-Y. (2004). Machine scheduling with job delivery coordination. European Journal of Operational Research, 158, 470–487.CrossRef
go back to reference Chen, Z.-L. (2004). Integrated production and distribution operations – Taxonomy, models, and review. In D. Simchi-Levi, S. D. Wu, & Z.-J. Shen (Eds.), Handbook of quantitative supply chain analysis (pp. 711–740). Boston: Kluwer Academic.CrossRef Chen, Z.-L. (2004). Integrated production and distribution operations – Taxonomy, models, and review. In D. Simchi-Levi, S. D. Wu, & Z.-J. Shen (Eds.), Handbook of quantitative supply chain analysis (pp. 711–740). Boston: Kluwer Academic.CrossRef
go back to reference Chen, Z.-L. (2010). Integrated production and outbound distribution scheduling: Review and extensions. Operations Research, 58, 130–148.CrossRef Chen, Z.-L. (2010). Integrated production and outbound distribution scheduling: Review and extensions. Operations Research, 58, 130–148.CrossRef
go back to reference Chen, B., & Lee, C.-Y. (2008). Logistics scheduling with batching and transportation. European Journal of Operational Research, 189, 871–876.CrossRef Chen, B., & Lee, C.-Y. (2008). Logistics scheduling with batching and transportation. European Journal of Operational Research, 189, 871–876.CrossRef
go back to reference Chen, Z.-L., & Pundoor, G. (2006). Order assignment and scheduling in a supply chain. Operations Research, 54, 555–572.CrossRef Chen, Z.-L., & Pundoor, G. (2006). Order assignment and scheduling in a supply chain. Operations Research, 54, 555–572.CrossRef
go back to reference Chen, Z.-L., & Vairaktarakis, G. L. (2005). Integrated scheduling of production and distribution operations. Management Science, 51, 614–628.CrossRef Chen, Z.-L., & Vairaktarakis, G. L. (2005). Integrated scheduling of production and distribution operations. Management Science, 51, 614–628.CrossRef
go back to reference Condotta, A., Knust, S., Meier, D., & Shakhlevich, N. V. (2013). Tabu search and lower bounds for a combined production-transportation problem. Computers and Operations Research, 40, 886–900.CrossRef Condotta, A., Knust, S., Meier, D., & Shakhlevich, N. V. (2013). Tabu search and lower bounds for a combined production-transportation problem. Computers and Operations Research, 40, 886–900.CrossRef
go back to reference Farahani, P., Grunow, M., & Günther, H.-O. (2012). Integrated production and distribution planning for perishable food products. Flexible Services and Manufacturing Journal, 24, 28–51.CrossRef Farahani, P., Grunow, M., & Günther, H.-O. (2012). Integrated production and distribution planning for perishable food products. Flexible Services and Manufacturing Journal, 24, 28–51.CrossRef
go back to reference Gao, S., Qi, L., & Lei, L. (2015). Integrated batch production and distribution scheduling with limited vehicle capacity. International Journal of Production Economics, 160, 13–25.CrossRef Gao, S., Qi, L., & Lei, L. (2015). Integrated batch production and distribution scheduling with limited vehicle capacity. International Journal of Production Economics, 160, 13–25.CrossRef
go back to reference Garcia, J. M., & Lozano, S. (2005). Production and delivery scheduling problem with time windows. Computers and Industrial Engineering, 48, 733–742.CrossRef Garcia, J. M., & Lozano, S. (2005). Production and delivery scheduling problem with time windows. Computers and Industrial Engineering, 48, 733–742.CrossRef
go back to reference Garcia, J. M., Lozano, S., & Canca, D. (2004). Coordinated scheduling of production and delivery from multiple plants. Robotics and Computer-Integrated Manufacturing, 20, 191–198.CrossRef Garcia, J. M., Lozano, S., & Canca, D. (2004). Coordinated scheduling of production and delivery from multiple plants. Robotics and Computer-Integrated Manufacturing, 20, 191–198.CrossRef
go back to reference Garcia, J. M., Lozano, S., Smith, K., Kwok, T., & Villa, G. (2002). Coordinated scheduling of production and delivery from multiple plants and with time windows using genetic algorithms. In Proceedings of the 9th international conference on neuronal information processing (ICONP’02) (vol. 3, pp. 1153–1158). Garcia, J. M., Lozano, S., Smith, K., Kwok, T., & Villa, G. (2002). Coordinated scheduling of production and delivery from multiple plants and with time windows using genetic algorithms. In Proceedings of the 9th international conference on neuronal information processing (ICONP’02) (vol. 3, pp. 1153–1158).
go back to reference Gavish, B., & Graves, S. C. (1978). The travelling salesman problem and related problems (Working paper OR-078-78). Cambridge, MA: Operations Research Center, Massachusetts Institute of Technology. Gavish, B., & Graves, S. C. (1978). The travelling salesman problem and related problems (Working paper OR-078-78). Cambridge, MA: Operations Research Center, Massachusetts Institute of Technology.
go back to reference Geismar, H. N., Dawande, M., & Sriskandarajah, C. (2011). Pool-point distribution of zero-inventory products. Production and Operations Management, 20, 737–753.CrossRef Geismar, H. N., Dawande, M., & Sriskandarajah, C. (2011). Pool-point distribution of zero-inventory products. Production and Operations Management, 20, 737–753.CrossRef
go back to reference Geismar, H. N., Laporte, G., Lei, L., & Srinkandarajah, C. (2008). The integrated production and transportation scheduling problem for a product with a short lifespan. INFORMS Journal on Computing, 20, 21–33.CrossRef Geismar, H. N., Laporte, G., Lei, L., & Srinkandarajah, C. (2008). The integrated production and transportation scheduling problem for a product with a short lifespan. INFORMS Journal on Computing, 20, 21–33.CrossRef
go back to reference Graham, R. L., Lawler, E. L., Lenstra, J. K., & Rinnooy Kan, A. H. G. (1979). Optimization and approximation in deterministic sequencing and scheduling: A survey. Annals of Discrete Mathematics, 4, 287–326.CrossRef Graham, R. L., Lawler, E. L., Lenstra, J. K., & Rinnooy Kan, A. H. G. (1979). Optimization and approximation in deterministic sequencing and scheduling: A survey. Annals of Discrete Mathematics, 4, 287–326.CrossRef
go back to reference Hajiaghaei-Keshteli, M., Aminnayeri, M., & Fatemi Ghomi, S. M. T. (2014). Integrated scheduling of production and rail transportation. Computers and Industrial Engineering, 74, 240–256.CrossRef Hajiaghaei-Keshteli, M., Aminnayeri, M., & Fatemi Ghomi, S. M. T. (2014). Integrated scheduling of production and rail transportation. Computers and Industrial Engineering, 74, 240–256.CrossRef
go back to reference Hall, N. G., & Potts, C. N. (2003). Supply chain scheduling: Batching and delivery. Operations Research, 51, 566–584.CrossRef Hall, N. G., & Potts, C. N. (2003). Supply chain scheduling: Batching and delivery. Operations Research, 51, 566–584.CrossRef
go back to reference Hall, N. G., & Potts, C. N. (2005). The coordination of scheduling and batch deliveries. Annals of Operations Research, 135, 41–64.CrossRef Hall, N. G., & Potts, C. N. (2005). The coordination of scheduling and batch deliveries. Annals of Operations Research, 135, 41–64.CrossRef
go back to reference Hurter, A. P., & Van Buer, M. G. (1996). The newspaper production/distribution problem. Journal of Business Logistics, 17, 85–107. Hurter, A. P., & Van Buer, M. G. (1996). The newspaper production/distribution problem. Journal of Business Logistics, 17, 85–107.
go back to reference Kang, H.-Y., Pearn, W. L., Chung, I.-P., & Lee, A. H. I. (2015). An enhanced model for the integrated production and transportation problem in a multiple vehicles environment. Soft Computing, 20(4), 1415–1435.CrossRef Kang, H.-Y., Pearn, W. L., Chung, I.-P., & Lee, A. H. I. (2015). An enhanced model for the integrated production and transportation problem in a multiple vehicles environment. Soft Computing, 20(4), 1415–1435.CrossRef
go back to reference Karaoğlan, İ., & Kesen, S. E. (2017). The coordinated production and transportation scheduling problem with a time-sensitive product: A branch-and-cut algorithm. International Journal of Production Research, 55, 536–557.CrossRef Karaoğlan, İ., & Kesen, S. E. (2017). The coordinated production and transportation scheduling problem with a time-sensitive product: A branch-and-cut algorithm. International Journal of Production Research, 55, 536–557.CrossRef
go back to reference Lee, J., Kim, B.-I., Johnson, A. L., & Lee, K. (2014). The nuclear medicine production and delivery problem. European Journal of Operational Research, 236, 461–472.CrossRef Lee, J., Kim, B.-I., Johnson, A. L., & Lee, K. (2014). The nuclear medicine production and delivery problem. European Journal of Operational Research, 236, 461–472.CrossRef
go back to reference Li, K. P., Ganesan, V. K., & Sivakumar, A. I. (2005). Synchronized scheduling of assembly and multi-destination air-transportation in a consumer electronics supply chain. International Journal of Production Research, 43, 2671–2685.CrossRef Li, K. P., Ganesan, V. K., & Sivakumar, A. I. (2005). Synchronized scheduling of assembly and multi-destination air-transportation in a consumer electronics supply chain. International Journal of Production Research, 43, 2671–2685.CrossRef
go back to reference Li, C.-L., & Vairaktarakis, G. (2007). Coordinating production and distribution of jobs with bundling operations. IIE Transactions, 39, 203–215.CrossRef Li, C.-L., & Vairaktarakis, G. (2007). Coordinating production and distribution of jobs with bundling operations. IIE Transactions, 39, 203–215.CrossRef
go back to reference Li, C.-L., Vairaktarakis, G., & Lee, C.-Y. (2005). Machine scheduling with deliveries to multiple customer locations. European Journal of Operational Research, 164, 39–51.CrossRef Li, C.-L., Vairaktarakis, G., & Lee, C.-Y. (2005). Machine scheduling with deliveries to multiple customer locations. European Journal of Operational Research, 164, 39–51.CrossRef
go back to reference Low, C., Chang, C.-M., Li, R.-K., & Huang, C.-L. (2014). Coordination of production scheduling and delivery problems with heterogeneous fleet. International Journal of Production Economics, 153, 139–148.CrossRef Low, C., Chang, C.-M., Li, R.-K., & Huang, C.-L. (2014). Coordination of production scheduling and delivery problems with heterogeneous fleet. International Journal of Production Economics, 153, 139–148.CrossRef
go back to reference Miller, C. E., Tucker, A. W., & Zemlin, R. A. (1960). Integer programming formulations and travelling salesman problems. Journal of the Association for Computing Machinery, 7, 326–329.CrossRef Miller, C. E., Tucker, A. W., & Zemlin, R. A. (1960). Integer programming formulations and travelling salesman problems. Journal of the Association for Computing Machinery, 7, 326–329.CrossRef
go back to reference Ng, C. T., & Lu, L. (2012). On-line integrated production and outbound distribution scheduling to minimize the maximum delivery completion time. Journal of Scheduling, 15, 391–398.CrossRef Ng, C. T., & Lu, L. (2012). On-line integrated production and outbound distribution scheduling to minimize the maximum delivery completion time. Journal of Scheduling, 15, 391–398.CrossRef
go back to reference Potts, C. N. (1980). Analysis of a heuristic for one machine sequencing with release dates and delivery times. Operations Research, 28, 1436–1441.CrossRef Potts, C. N. (1980). Analysis of a heuristic for one machine sequencing with release dates and delivery times. Operations Research, 28, 1436–1441.CrossRef
go back to reference Pundoor, G., & Chen, Z.-L. (2005). Scheduling a production-distribution system to optimize the tradeoff between delivery tardiness and total distribution cost. Naval Research Logistics, 52, 571–589.CrossRef Pundoor, G., & Chen, Z.-L. (2005). Scheduling a production-distribution system to optimize the tradeoff between delivery tardiness and total distribution cost. Naval Research Logistics, 52, 571–589.CrossRef
go back to reference Rasti-Barzoki, M., & Hejazi, S. R. (2013). Minimizing the weighted number of tardy jobs with due date assignment and capacity-constrained deliveries for multiple customers in supply chain. European Journal of Operational Research, 228, 345–357.CrossRef Rasti-Barzoki, M., & Hejazi, S. R. (2013). Minimizing the weighted number of tardy jobs with due date assignment and capacity-constrained deliveries for multiple customers in supply chain. European Journal of Operational Research, 228, 345–357.CrossRef
go back to reference Roberti, R., & Toth, P. (2012). Models and algorithms for the asymmetric traveling salesman problem: An experimental comparison. EURO Journal on Transportation and Logistics, 1, 113–133.CrossRef Roberti, R., & Toth, P. (2012). Models and algorithms for the asymmetric traveling salesman problem: An experimental comparison. EURO Journal on Transportation and Logistics, 1, 113–133.CrossRef
go back to reference Stecke, K. E., & Zhao, X. (2007). Production and transportation integration for a make-to-order manufacturing company with a commit-to-delivery business mode. Manufacturing and Service Operations Management, 9, 206–224.CrossRef Stecke, K. E., & Zhao, X. (2007). Production and transportation integration for a make-to-order manufacturing company with a commit-to-delivery business mode. Manufacturing and Service Operations Management, 9, 206–224.CrossRef
go back to reference Steiner, G., & Zhang, R. (2011). Minimizing the weighted number of tardy jobs with due date assignment and capacity-constrained deliveries. Annals of Operations Research, 191, 171–181.CrossRef Steiner, G., & Zhang, R. (2011). Minimizing the weighted number of tardy jobs with due date assignment and capacity-constrained deliveries. Annals of Operations Research, 191, 171–181.CrossRef
go back to reference Thomas, D. J., & Griffin, P. M. (1996). Coordinated supply chain management. European Journal of Operational Research, 94, 1–15.CrossRef Thomas, D. J., & Griffin, P. M. (1996). Coordinated supply chain management. European Journal of Operational Research, 94, 1–15.CrossRef
go back to reference Ullrich, C. A. (2012). Supply chain scheduling: Makespan reduction potential. International Journal of Logistics: Research and Applications, 15, 323–336.CrossRef Ullrich, C. A. (2012). Supply chain scheduling: Makespan reduction potential. International Journal of Logistics: Research and Applications, 15, 323–336.CrossRef
go back to reference Ullrich, C. A. (2013). Integrated machine scheduling and vehicle routing with time windows. European Journal of Operational Research, 227, 152–165.CrossRef Ullrich, C. A. (2013). Integrated machine scheduling and vehicle routing with time windows. European Journal of Operational Research, 227, 152–165.CrossRef
go back to reference Van Buer, M. G., Woodruff, D. L., & Olson, R. T. (1999). Solving the medium newspaper production/distribution problem. European Journal of Operational Research, 115, 237–253.CrossRef Van Buer, M. G., Woodruff, D. L., & Olson, R. T. (1999). Solving the medium newspaper production/distribution problem. European Journal of Operational Research, 115, 237–253.CrossRef
go back to reference Viergutz, C., & Knust, S. (2014). Integrated production and distribution scheduling with lifespan constraints. Annals of Operations Research, 213, 293–318.CrossRef Viergutz, C., & Knust, S. (2014). Integrated production and distribution scheduling with lifespan constraints. Annals of Operations Research, 213, 293–318.CrossRef
go back to reference Wang, H., & Lee, C.-Y. (2005). Production and transport logistics scheduling with two transport mode choices. Naval Research Logistics, 52, 796–809.CrossRef Wang, H., & Lee, C.-Y. (2005). Production and transport logistics scheduling with two transport mode choices. Naval Research Logistics, 52, 796–809.CrossRef
Metadata
Title
Integrated Production Scheduling and Distribution Planning with Time Windows
Authors
Saadettin Erhan Kesen
Tolga Bektaş
Copyright Year
2019
DOI
https://doi.org/10.1007/978-3-319-97511-5_8