Skip to main content
Top

2017 | OriginalPaper | Chapter

Multisensor Landslide Monitoring as a Challenge for Early Warning: From Process Based to Statistic Based Approaches

Authors : Francesca Bozzano, Carlo Esposito, Andrea Fantini, Matteo Fiorucci, Salvatore Martino, Paolo Mazzanti, Alberto Prestininzi, Stefano Rivellino, Alfredo Rocca, Gabriele Scarascia Mugnozza

Published in: Advancing Culture of Living with Landslides

Publisher: Springer International Publishing

Activate our intelligent search to find suitable subject content or patents.

search-config
loading …

Abstract

https://static-content.springer.com/image/chp%3A10.1007%2F978-3-319-53487-9_3/MediaObjects/440489_1_En_3_Figa_HTML.gif
In the last decades, several approaches were proposed accounting for early warning systems to manage in real time the risks due to fast slope failures where important elements, such as structures, infrastructures and cultural heritage are exposed. The challenge of these approaches is to forecast the slope evolution, thus providing alert levels suitable for managing infrastructures in order to mitigate the landslide risk and reduce the “response” time for interventions. Two different strategies can be defined in this regard: an observation-based approach (OBA) and a process-based approach (PBA), this last one comprehensive of semi-empirical approaches (SEA) and a statistical-based one (SBA). At this aim, some experiments are being performed at different scales in the framework of technical applications, consulting activities and research projects managed by the Research Centre for the Geological Risk (CERI) of the University of Rome “Sapienza”. These experiments are testing different kind of sensors including interferometers, optical cams connected to Artificial Intelligence (AI) systems, extensometers, distantiometers, rock-thermometers, for detecting changes in rock properties and detecting stress-strain changes, as well as pluviometers, anemometers, hygrometers, air-thermometers, micro- or nano- accelerometers and piezometers for detecting possible triggers. The results obtained up to now encourage improving the SBA, based on data clouding, and testing them more extensively, at a national scale, by selecting test sites for experiencing their suitability for intervention strategies/procedures. These test sites will be selected along railways or roadways (in co-operation with the responsible National Agencies) where man-cut trenches could predispose to rock slides or falls that involve the infrastructures, in order to experience the suitability of SBA versus OBA approaches for early warning in the framework of lifelines management.

Dont have a licence yet? Then find out more about our products and how to get one now:

Springer Professional "Wirtschaft+Technik"

Online-Abonnement

Mit Springer Professional "Wirtschaft+Technik" erhalten Sie Zugriff auf:

  • über 102.000 Bücher
  • über 537 Zeitschriften

aus folgenden Fachgebieten:

  • Automobil + Motoren
  • Bauwesen + Immobilien
  • Business IT + Informatik
  • Elektrotechnik + Elektronik
  • Energie + Nachhaltigkeit
  • Finance + Banking
  • Management + Führung
  • Marketing + Vertrieb
  • Maschinenbau + Werkstoffe
  • Versicherung + Risiko

Jetzt Wissensvorsprung sichern!

Springer Professional "Technik"

Online-Abonnement

Mit Springer Professional "Technik" erhalten Sie Zugriff auf:

  • über 67.000 Bücher
  • über 390 Zeitschriften

aus folgenden Fachgebieten:

  • Automobil + Motoren
  • Bauwesen + Immobilien
  • Business IT + Informatik
  • Elektrotechnik + Elektronik
  • Energie + Nachhaltigkeit
  • Maschinenbau + Werkstoffe




 

Jetzt Wissensvorsprung sichern!

Springer Professional "Wirtschaft"

Online-Abonnement

Mit Springer Professional "Wirtschaft" erhalten Sie Zugriff auf:

  • über 67.000 Bücher
  • über 340 Zeitschriften

aus folgenden Fachgebieten:

  • Bauwesen + Immobilien
  • Business IT + Informatik
  • Finance + Banking
  • Management + Führung
  • Marketing + Vertrieb
  • Versicherung + Risiko




Jetzt Wissensvorsprung sichern!

Literature
go back to reference Antonello G, Casagli N, Farina P, Leva D, Nico G, Siebar AJ, Tarchi D (2004) Ground-based SAR interferometry for monitoring mass movements. Landslides 1:21–28CrossRef Antonello G, Casagli N, Farina P, Leva D, Nico G, Siebar AJ, Tarchi D (2004) Ground-based SAR interferometry for monitoring mass movements. Landslides 1:21–28CrossRef
go back to reference Bigarré P, Klein E, Gueniffey Y, Verdel T (2011) Cloud monitoring: an innovative approach for the prevention of landslide hazards. In: Proceedings of the second world landslide forum, 2011 Rome, Abstracts Book WLF2, L16, p 475 Bigarré P, Klein E, Gueniffey Y, Verdel T (2011) Cloud monitoring: an innovative approach for the prevention of landslide hazards. In: Proceedings of the second world landslide forum, 2011 Rome, Abstracts Book WLF2, L16, p 475
go back to reference Bozzano F, Mazzanti P, Esposito C, Moretto S, Rocca A (2016) Potential of satellite InSAR monitoring for landslide failure forecasting. In: Aversa S et al (eds) Landslides and engineered slopes. Experience, theory and practice, pp 523–530 Bozzano F, Mazzanti P, Esposito C, Moretto S, Rocca A (2016) Potential of satellite InSAR monitoring for landslide failure forecasting. In: Aversa S et al (eds) Landslides and engineered slopes. Experience, theory and practice, pp 523–530
go back to reference Cornelius RR, Voight B (1994) Graphical and PC-software analysis of volcano eruption precursors according to the materials failure forecast method (FFMS). J Volcanol Geoth Res 64:295–320CrossRef Cornelius RR, Voight B (1994) Graphical and PC-software analysis of volcano eruption precursors according to the materials failure forecast method (FFMS). J Volcanol Geoth Res 64:295–320CrossRef
go back to reference Cruden DM, Varnes DJ (1996) Landslides types and processes. Landslides investigation and mitigation. Transportation research board. In: Turner AK, Shuster RL (eds) National Research Council. Special Report 247. National Research Council: Washington, DC, pp 36–75 Cruden DM, Varnes DJ (1996) Landslides types and processes. Landslides investigation and mitigation. Transportation research board. In: Turner AK, Shuster RL (eds) National Research Council. Special Report 247. National Research Council: Washington, DC, pp 36–75
go back to reference Fiorucci M, Iannucci R, Lenti L, Martino S, Paciello A, Prestininzi A, Rivellino S (2016) Nanoseismic monitoring of gravity-induced slope instabilities for the risk management of an aqueduct infrastructure in Central Apennines (Italy). Nat Hazard. doi:10.1007/s11069-016-2516-5 Fiorucci M, Iannucci R, Lenti L, Martino S, Paciello A, Prestininzi A, Rivellino S (2016) Nanoseismic monitoring of gravity-induced slope instabilities for the risk management of an aqueduct infrastructure in Central Apennines (Italy). Nat Hazard. doi:10.​1007/​s11069-016-2516-5
go back to reference Fukuzono T (1985) A new method for predicting the failure time of a slope. In: Proceeding of 4th international conference and field workshop on landslides, Tokyo, pp 145–150 Fukuzono T (1985) A new method for predicting the failure time of a slope. In: Proceeding of 4th international conference and field workshop on landslides, Tokyo, pp 145–150
go back to reference Gaffet S, Guglielmi Y, Cappa F, Pambrun C, Monfret T, Amitrano D (2010) Use of the simultaneous seismic, GPS and meteorological monitoring for the characterization of a large unstable mountain slope in the southern French Alps. Geophys J Int 182:1395–1410CrossRef Gaffet S, Guglielmi Y, Cappa F, Pambrun C, Monfret T, Amitrano D (2010) Use of the simultaneous seismic, GPS and meteorological monitoring for the characterization of a large unstable mountain slope in the southern French Alps. Geophys J Int 182:1395–1410CrossRef
go back to reference Lai XP, Cai MF, Xie MW (2006) In situ monitoring and analysis of rock mass behavior prior to collapse of the main transport roadway in Linglong Gold Mine, China. Int J Rock Mech Min Sci 43:640–646CrossRef Lai XP, Cai MF, Xie MW (2006) In situ monitoring and analysis of rock mass behavior prior to collapse of the main transport roadway in Linglong Gold Mine, China. Int J Rock Mech Min Sci 43:640–646CrossRef
go back to reference Lenti L, Martino S, Paciello A, Prestininzi A, Rivellino S (2012) Microseismicity within a karstified rock mass due to cracks and collapses triggered by earthquakes and gravitational deformations. Nat Hazards 64:359–379CrossRef Lenti L, Martino S, Paciello A, Prestininzi A, Rivellino S (2012) Microseismicity within a karstified rock mass due to cracks and collapses triggered by earthquakes and gravitational deformations. Nat Hazards 64:359–379CrossRef
go back to reference Martino S, Mazzanti P (2014) Integrating geomechanical surveys and remote sensing for sea cliff slope stability analysis: the Mt. Pucci case study (Italy). Nat Hazards Earth Syst Sci 14:831–848CrossRef Martino S, Mazzanti P (2014) Integrating geomechanical surveys and remote sensing for sea cliff slope stability analysis: the Mt. Pucci case study (Italy). Nat Hazards Earth Syst Sci 14:831–848CrossRef
go back to reference Mazzanti P, Bozzano F, Cipriani I, Prestininzi A (2014) New insights into the temporal prediction of landslides by a terrestrial SAR interferometry monitoring case study. Landslides 12:55–68CrossRef Mazzanti P, Bozzano F, Cipriani I, Prestininzi A (2014) New insights into the temporal prediction of landslides by a terrestrial SAR interferometry monitoring case study. Landslides 12:55–68CrossRef
go back to reference Prestininzi A, Milli S (2015) The hydrogeological instability. In: Treccani (ed) Italy and its regions, the republican age, 2° vol, pp 367–381 (in Italian) Prestininzi A, Milli S (2015) The hydrogeological instability. In: Treccani (ed) Italy and its regions, the republican age, 2° vol, pp 367–381 (in Italian)
go back to reference Szwedzicki T (2003) Rock mass behaviour prior to failure. Int J Rock Mech Min Sci 40:573–584CrossRef Szwedzicki T (2003) Rock mass behaviour prior to failure. Int J Rock Mech Min Sci 40:573–584CrossRef
go back to reference Voight B (1989) A relation to describe rate-dependent material failure. Science 243(4888):200–203CrossRef Voight B (1989) A relation to describe rate-dependent material failure. Science 243(4888):200–203CrossRef
Metadata
Title
Multisensor Landslide Monitoring as a Challenge for Early Warning: From Process Based to Statistic Based Approaches
Authors
Francesca Bozzano
Carlo Esposito
Andrea Fantini
Matteo Fiorucci
Salvatore Martino
Paolo Mazzanti
Alberto Prestininzi
Stefano Rivellino
Alfredo Rocca
Gabriele Scarascia Mugnozza
Copyright Year
2017
DOI
https://doi.org/10.1007/978-3-319-53487-9_3