Optimization on Earned Value Method Combined with Critical Path

Authors : Qi-bin Zheng, Xing Bi

Published in: Proceedings of 2013 4th International Asia Conference on Industrial Engineering and Management Innovation (IEMI2013)

Publisher: Springer Berlin Heidelberg

Activate our intelligent search to find suitable subject content or patents.

search-config
loading …

Abstract

When calculating the schedule performance using the traditional earned value method, the earned value in the critical path and in the noncritical path is not differentiated. It cannot evaluate the progress of project objectively. In this paper, the schedule performance indicators are optimized through introducing the weight value, and schedule performance on the critical path is analyzed. The critical path issues in the evaluation of the progress of the project are solved, which will provide a basic point of reference for schedule measurement of project.

Dont have a licence yet? Then find out more about our products and how to get one now:

Springer Professional "Wirtschaft+Technik"

Online-Abonnement

Mit Springer Professional "Wirtschaft+Technik" erhalten Sie Zugriff auf:

  • über 102.000 Bücher
  • über 537 Zeitschriften

aus folgenden Fachgebieten:

  • Automobil + Motoren
  • Bauwesen + Immobilien
  • Business IT + Informatik
  • Elektrotechnik + Elektronik
  • Energie + Nachhaltigkeit
  • Finance + Banking
  • Management + Führung
  • Marketing + Vertrieb
  • Maschinenbau + Werkstoffe
  • Versicherung + Risiko

Jetzt Wissensvorsprung sichern!

Springer Professional "Technik"

Online-Abonnement

Mit Springer Professional "Technik" erhalten Sie Zugriff auf:

  • über 67.000 Bücher
  • über 390 Zeitschriften

aus folgenden Fachgebieten:

  • Automobil + Motoren
  • Bauwesen + Immobilien
  • Business IT + Informatik
  • Elektrotechnik + Elektronik
  • Energie + Nachhaltigkeit
  • Maschinenbau + Werkstoffe




 

Jetzt Wissensvorsprung sichern!

Springer Professional "Wirtschaft"

Online-Abonnement

Mit Springer Professional "Wirtschaft" erhalten Sie Zugriff auf:

  • über 67.000 Bücher
  • über 340 Zeitschriften

aus folgenden Fachgebieten:

  • Bauwesen + Immobilien
  • Business IT + Informatik
  • Finance + Banking
  • Management + Führung
  • Marketing + Vertrieb
  • Versicherung + Risiko




Jetzt Wissensvorsprung sichern!

Literature
1.
go back to reference Fleming QW, Koppelman JM (2010) Earned value project management [M]. Project Management Institute, Newton Square, pp 123–125 Fleming QW, Koppelman JM (2010) Earned value project management [M]. Project Management Institute, Newton Square, pp 123–125
2.
go back to reference Fang Xiyuan, Zhou Yirong (2010) Project management [M]. China Machine Press, Beijing, pp320–330 Fang Xiyuan, Zhou Yirong (2010) Project management [M]. China Machine Press, Beijing, pp320–330
3.
go back to reference Lipke W, Zwikael O, Henderson K (2009) Prediction of project outcome: the application of statistical methods to earned value management and earned schedule performance indexes. Int J Proj Manage 27(4):400–407CrossRef Lipke W, Zwikael O, Henderson K (2009) Prediction of project outcome: the application of statistical methods to earned value management and earned schedule performance indexes. Int J Proj Manage 27(4):400–407CrossRef
4.
go back to reference Kerzner H (2010) Project management: a systems approach to planning, scheduling, and controlling [M], New York, pp 655–670 Kerzner H (2010) Project management: a systems approach to planning, scheduling, and controlling [M], New York, pp 655–670
5.
go back to reference Project Management Institute (2000) A guide to project management body of knowledge [M]. PMI, Delaware, pp 87–95 Project Management Institute (2000) A guide to project management body of knowledge [M]. PMI, Delaware, pp 87–95
6.
go back to reference Ding Shizhao (2004) Construction project management [M]. China Building Industry Press, Beijing, pp 39–41 Ding Shizhao (2004) Construction project management [M]. China Building Industry Press, Beijing, pp 39–41
7.
go back to reference de Vandevoor S, Vanhoucke M (2006) A comparison of different project duration forecasting methods using earned value metrics. Int J Proj Manage 24(4):289–302CrossRef de Vandevoor S, Vanhoucke M (2006) A comparison of different project duration forecasting methods using earned value metrics. Int J Proj Manage 24(4):289–302CrossRef
8.
go back to reference Zhao Feng (2007) Optimization of earned value analysis based on the critical path (in Chinese). Ind Technol Econ 26(6):59–63 Zhao Feng (2007) Optimization of earned value analysis based on the critical path (in Chinese). Ind Technol Econ 26(6):59–63
9.
go back to reference Christensen DS (1998) The costs and benefits of the earned value management process. Acquis Rev Q 28(5):79–85 Christensen DS (1998) The costs and benefits of the earned value management process. Acquis Rev Q 28(5):79–85
10.
go back to reference Ding Baofeng, Zhang Hongguo (2006) The improvement of earned value analysis in schedule measurement method (in Chinese). Info Technol 30(2):14–16 Ding Baofeng, Zhang Hongguo (2006) The improvement of earned value analysis in schedule measurement method (in Chinese). Info Technol 30(2):14–16
11.
go back to reference Zhong Shuheng (2011) Earned value analysis improvements in project management (in Chinese). Coal Eng 58(10):136–137 Zhong Shuheng (2011) Earned value analysis improvements in project management (in Chinese). Coal Eng 58(10):136–137
12.
go back to reference Mu Guangyu, Li Li, Zhang Wenxiao, Gao Guodong (2011) Research on the progress management in shipbuilding project based on CPM and earned value method (in Chinese). Sci Technol Manage Res 31(7):206–208 Mu Guangyu, Li Li, Zhang Wenxiao, Gao Guodong (2011) Research on the progress management in shipbuilding project based on CPM and earned value method (in Chinese). Sci Technol Manage Res 31(7):206–208
13.
go back to reference Sheng Xinjiang (2006) Earned value method with the critical path (in Chinese). Technoecon Manage Res 27(1):49–51 Sheng Xinjiang (2006) Earned value method with the critical path (in Chinese). Technoecon Manage Res 27(1):49–51
14.
go back to reference Huang Huijun, Chang Lanxiao (2012) Project progress monitoring research based on improved earned value method (in Chinese). Manuf Info Eng China 41(19):12–19 Huang Huijun, Chang Lanxiao (2012) Project progress monitoring research based on improved earned value method (in Chinese). Manuf Info Eng China 41(19):12–19
15.
go back to reference Chang Qing, Ji Ge-di, Li Changqing (2006) The research to second-level earned value method for improve performance measurement of engineering project (in Chinese). Chinese J Manage Sci 14(2):65–70 Chang Qing, Ji Ge-di, Li Changqing (2006) The research to second-level earned value method for improve performance measurement of engineering project (in Chinese). Chinese J Manage Sci 14(2):65–70
16.
go back to reference Kolisch R, Padman R (2001) An integrated survey of deterministic project scheduling. Int J Manage Sci 29(3):249–272 Kolisch R, Padman R (2001) An integrated survey of deterministic project scheduling. Int J Manage Sci 29(3):249–272
Metadata
Title
Optimization on Earned Value Method Combined with Critical Path
Authors
Qi-bin Zheng
Xing Bi
Copyright Year
2014
Publisher
Springer Berlin Heidelberg
DOI
https://doi.org/10.1007/978-3-642-40060-5_68