Skip to main content
Top

2018 | OriginalPaper | Chapter

99. Prioritizing Best Value Contributing Factors for Contractor Selection: An AHP Approach

Authors : Muhammad Hasnain, Fahim Ullah, Muhammad Jamaluddin Thaheem, Samad M. E. Sepasgozar

Published in: Proceedings of the 21st International Symposium on Advancement of Construction Management and Real Estate

Publisher: Springer Singapore

Activate our intelligent search to find suitable subject content or patents.

search-config
loading …

Abstract

Construction procurement has evolved from low-bid system to Best Value (BV). This paper presents BV based contractor selection mechanism using Analytical Hierarchy Process (AHP). BV process postulates the selection of contractor who can deliver the project in best possible way in terms of budget, quality, customer satisfaction and other success criteria. AHP is used to prioritize BV contributing factors (CFs) critical to contractor selection. This paper examines the CFs identified from literature published from 2000 to 2015 and provides the project owners a methodology of quantifying their relative effects in selecting BV contractor. The results indicate that past performance is the most significant among the 15 factors considered in contractor selection followed by cost. This is mainly due to resistance to change which encourages reputation-based procurement in construction industry blocking way for new entrants. This study helps value based contractor selection rather than the traditional low bid system. Further, it can be used by all stakeholders in a contract: client for BV contractor selection, contractor for BV supplier and consultant for BV team selection. The study can be enhanced in future to include all parties to a contract and ensure a win-win-win contracting model.

Dont have a licence yet? Then find out more about our products and how to get one now:

Springer Professional "Wirtschaft+Technik"

Online-Abonnement

Mit Springer Professional "Wirtschaft+Technik" erhalten Sie Zugriff auf:

  • über 102.000 Bücher
  • über 537 Zeitschriften

aus folgenden Fachgebieten:

  • Automobil + Motoren
  • Bauwesen + Immobilien
  • Business IT + Informatik
  • Elektrotechnik + Elektronik
  • Energie + Nachhaltigkeit
  • Finance + Banking
  • Management + Führung
  • Marketing + Vertrieb
  • Maschinenbau + Werkstoffe
  • Versicherung + Risiko

Jetzt Wissensvorsprung sichern!

Springer Professional "Technik"

Online-Abonnement

Mit Springer Professional "Technik" erhalten Sie Zugriff auf:

  • über 67.000 Bücher
  • über 390 Zeitschriften

aus folgenden Fachgebieten:

  • Automobil + Motoren
  • Bauwesen + Immobilien
  • Business IT + Informatik
  • Elektrotechnik + Elektronik
  • Energie + Nachhaltigkeit
  • Maschinenbau + Werkstoffe




 

Jetzt Wissensvorsprung sichern!

Springer Professional "Wirtschaft"

Online-Abonnement

Mit Springer Professional "Wirtschaft" erhalten Sie Zugriff auf:

  • über 67.000 Bücher
  • über 340 Zeitschriften

aus folgenden Fachgebieten:

  • Bauwesen + Immobilien
  • Business IT + Informatik
  • Finance + Banking
  • Management + Führung
  • Marketing + Vertrieb
  • Versicherung + Risiko




Jetzt Wissensvorsprung sichern!

Literature
go back to reference Adams WJ, Saaty R (2003) Super decisions software guide. Super Decisions 9 Adams WJ, Saaty R (2003) Super decisions software guide. Super Decisions 9
go back to reference Akintoye A, Hardcastle C, Beck M, Chinyio E, Asenova D (2003) Achieving best value in private finance initiative project procurement. Constr Manage Econ 21:461–470 Akintoye A, Hardcastle C, Beck M, Chinyio E, Asenova D (2003) Achieving best value in private finance initiative project procurement. Constr Manage Econ 21:461–470
go back to reference Cheng EW, Li H, Yu L (2005) The analytic network process (ANP) approach to location selection: a shopping mall illustration. Constr Innovation 5:83–97CrossRef Cheng EW, Li H, Yu L (2005) The analytic network process (ANP) approach to location selection: a shopping mall illustration. Constr Innovation 5:83–97CrossRef
go back to reference Chin K-S, Pun K-F (2002) A proposed framework for implementing TQM in Chinese organizations. Int J Qual Reliab Manage 19:272–294CrossRef Chin K-S, Pun K-F (2002) A proposed framework for implementing TQM in Chinese organizations. Int J Qual Reliab Manage 19:272–294CrossRef
go back to reference Dainty AR, Cheng M-I, Moore DR (2005) Competency-based model for predicting construction project managers’ performance. J Manage Eng 21(1):2–9CrossRef Dainty AR, Cheng M-I, Moore DR (2005) Competency-based model for predicting construction project managers’ performance. J Manage Eng 21(1):2–9CrossRef
go back to reference El Wardani MA, Messner JI, Horman MJ (2006) Comparing procurement methods for design-build projects. J Constr Eng Manage 132(3):230–238CrossRef El Wardani MA, Messner JI, Horman MJ (2006) Comparing procurement methods for design-build projects. J Constr Eng Manage 132(3):230–238CrossRef
go back to reference Flyvbjerg B (2013) Quality control and due diligence in project management: getting decisions right by taking the outside view. Int J Project Manage 31:760–774CrossRef Flyvbjerg B (2013) Quality control and due diligence in project management: getting decisions right by taking the outside view. Int J Project Manage 31:760–774CrossRef
go back to reference Gajjar D, Kashiwagi D, Kashiwagi J, Sullivan K (2014) Best value case study: cold storage facility in Miami, Florida. J Adv Perform Inf Value 6(1) Gajjar D, Kashiwagi D, Kashiwagi J, Sullivan K (2014) Best value case study: cold storage facility in Miami, Florida. J Adv Perform Inf Value 6(1)
go back to reference Kashiwagi D (2011) Case study: Best value procurement/performance information procurement system development. J Adv Perform Inf Value 3(1) Kashiwagi D (2011) Case study: Best value procurement/performance information procurement system development. J Adv Perform Inf Value 3(1)
go back to reference Kashiwagi J, Sullivan K, Kashiwagi D (2010) New contract model for project management. PM-05 Advancing Project Management for the 21st Century, pp 228–335 Kashiwagi J, Sullivan K, Kashiwagi D (2010) New contract model for project management. PM-05 Advancing Project Management for the 21st Century, pp 228–335
go back to reference Kashiwagi D, Kashiwagi J, Child G (2014) Price based environment of design and engineering services. J Adv Perform Inf Value 6(1) Kashiwagi D, Kashiwagi J, Child G (2014) Price based environment of design and engineering services. J Adv Perform Inf Value 6(1)
go back to reference Kim S-Y, Huynh T-A (2008) Improving project management performance of large contractors using benchmarking approach. Int J Project Manage 26:758–769CrossRef Kim S-Y, Huynh T-A (2008) Improving project management performance of large contractors using benchmarking approach. Int J Project Manage 26:758–769CrossRef
go back to reference Little M, Kashiwagi D (2012) State of Idaho procurement of it services. In: 5th international public procurement conference (IPPC5), proposed paper, Seattle, WA, US Little M, Kashiwagi D (2012) State of Idaho procurement of it services. In: 5th international public procurement conference (IPPC5), proposed paper, Seattle, WA, US
go back to reference Odeh AM, Battaineh HT (2002) Causes of construction delay: traditional contracts. Int J Project Manage 20:67–73CrossRef Odeh AM, Battaineh HT (2002) Causes of construction delay: traditional contracts. Int J Project Manage 20:67–73CrossRef
go back to reference Pan W, Dainty AR, Gibb AG (2012) Establishing and weighting decision criteria for building system selection in housing construction. J Constr Eng Manage 138:1239–1250CrossRef Pan W, Dainty AR, Gibb AG (2012) Establishing and weighting decision criteria for building system selection in housing construction. J Constr Eng Manage 138:1239–1250CrossRef
go back to reference Saaty TL (1994) How to make a decision: the analytic hierarchy process. Interfaces 24:19–43CrossRef Saaty TL (1994) How to make a decision: the analytic hierarchy process. Interfaces 24:19–43CrossRef
go back to reference Saaty TL (2008) Decision making with the analytic hierarchy process. Int J Serv Sci 1:83–98 Saaty TL (2008) Decision making with the analytic hierarchy process. Int J Serv Sci 1:83–98
go back to reference Saaty TL, Vargas LG (2012) Models, methods, concepts & applications of the analytic hierarchy process, vol 175. Springer Science & Business Media, US Saaty TL, Vargas LG (2012) Models, methods, concepts & applications of the analytic hierarchy process, vol 175. Springer Science & Business Media, US
go back to reference Scott S (2006) Best-value procurement methods for highway construction projects. Transportation Research Board, vol 561, US Scott S (2006) Best-value procurement methods for highway construction projects. Transportation Research Board, vol 561, US
go back to reference Shen J (2004) Population growth, ecological degradation and construction in the western region of China. J Contemp China 13(41):637–661CrossRef Shen J (2004) Population growth, ecological degradation and construction in the western region of China. J Contemp China 13(41):637–661CrossRef
go back to reference Van de Rijt J, Witteveen W, Vis C, Santema S (2011) Best value at the directorate-general for public works and water management in The Netherlands: a case study of the procurement of infrastructure projects worth $1,200 M. J Adv Perform Inf Value 3(1) Van de Rijt J, Witteveen W, Vis C, Santema S (2011) Best value at the directorate-general for public works and water management in The Netherlands: a case study of the procurement of infrastructure projects worth $1,200 M. J Adv Perform Inf Value 3(1)
go back to reference Vanhoucke M (2012) Measuring the efficiency of project control using fictitious and empirical project data. Int J Project Manage 30:252–263CrossRef Vanhoucke M (2012) Measuring the efficiency of project control using fictitious and empirical project data. Int J Project Manage 30:252–263CrossRef
go back to reference Walker DH, Hampson K, Peters R (2002) Project alliancing vs project partnering: a case study of the Australian National Museum Project. Supply Chain Manage Int J 7(2):83–91CrossRef Walker DH, Hampson K, Peters R (2002) Project alliancing vs project partnering: a case study of the Australian National Museum Project. Supply Chain Manage Int J 7(2):83–91CrossRef
go back to reference Xia B, Chen Q, Xu Y, Li M, Jin X (2014) Design-build contractor selection for public sustainable buildings. J Manage Eng 31(5):04014070CrossRef Xia B, Chen Q, Xu Y, Li M, Jin X (2014) Design-build contractor selection for public sustainable buildings. J Manage Eng 31(5):04014070CrossRef
go back to reference Zahedi F (1986) The analytic hierarchy process—a survey of the method and its applications. Interfaces 16:96–108CrossRef Zahedi F (1986) The analytic hierarchy process—a survey of the method and its applications. Interfaces 16:96–108CrossRef
Metadata
Title
Prioritizing Best Value Contributing Factors for Contractor Selection: An AHP Approach
Authors
Muhammad Hasnain
Fahim Ullah
Muhammad Jamaluddin Thaheem
Samad M. E. Sepasgozar
Copyright Year
2018
Publisher
Springer Singapore
DOI
https://doi.org/10.1007/978-981-10-6190-5_99