Quantifying Resource Inter-activity Utilization Efficiency Through Simulation-Based Scheduling

Activate our intelligent search to find suitable subject content or patents.

search-config
loading …

Abstract

This research investigates resource inter-activity utilization efficiency arising from resource shared use and transfer observed in planning projects at a structural steel fabrication shop. Aided with discrete event simulation-based resource-constrained scheduling analysis, the necessity of defining the resource inter-activity utilization efficiency factor is justified in project scheduling and budgeting in practice. The Simplified Scheduling Simulation (S3) platform based on the simplified discrete-event simulation approach (SDESA) is utilized to create a resource loaded schedule for a simple project case in order to facilitate analyzing resource inter-activity utilization efficiency. Further, the problem of how to optimize labor inter-activity utilization efficiency is formulated conceptually, which is vitally important to project cost budgeting and earned value management in applications resembling operating a major steel fabrication facility.

Dont have a licence yet? Then find out more about our products and how to get one now:

Springer Professional "Wirtschaft+Technik"

Online-Abonnement

Mit Springer Professional "Wirtschaft+Technik" erhalten Sie Zugriff auf:

  • über 102.000 Bücher
  • über 537 Zeitschriften

aus folgenden Fachgebieten:

  • Automobil + Motoren
  • Bauwesen + Immobilien
  • Business IT + Informatik
  • Elektrotechnik + Elektronik
  • Energie + Nachhaltigkeit
  • Finance + Banking
  • Management + Führung
  • Marketing + Vertrieb
  • Maschinenbau + Werkstoffe
  • Versicherung + Risiko

Jetzt Wissensvorsprung sichern!

Springer Professional "Technik"

Online-Abonnement

Mit Springer Professional "Technik" erhalten Sie Zugriff auf:

  • über 67.000 Bücher
  • über 390 Zeitschriften

aus folgenden Fachgebieten:

  • Automobil + Motoren
  • Bauwesen + Immobilien
  • Business IT + Informatik
  • Elektrotechnik + Elektronik
  • Energie + Nachhaltigkeit
  • Maschinenbau + Werkstoffe




 

Jetzt Wissensvorsprung sichern!

Springer Professional "Wirtschaft"

Online-Abonnement

Mit Springer Professional "Wirtschaft" erhalten Sie Zugriff auf:

  • über 67.000 Bücher
  • über 340 Zeitschriften

aus folgenden Fachgebieten:

  • Bauwesen + Immobilien
  • Business IT + Informatik
  • Finance + Banking
  • Management + Führung
  • Marketing + Vertrieb
  • Versicherung + Risiko




Jetzt Wissensvorsprung sichern!

Literature
1.
go back to reference Azimi, R., Lee, S.H., AbouRizk, S.M.: Resource performance indicators in controlling industrial steel projects. In: Construction Research Congress 2010: Innovation for Reshaping Construction Practice, pp. 21–30 (2010) Azimi, R., Lee, S.H., AbouRizk, S.M.: Resource performance indicators in controlling industrial steel projects. In: Construction Research Congress 2010: Innovation for Reshaping Construction Practice, pp. 21–30 (2010)
2.
go back to reference Project Management Institute: A Guide to the Project Management Body of Knowledge (PMBOK guide), 6th edn. Newtown Square, Pennsylvania (2017) Project Management Institute: A Guide to the Project Management Body of Knowledge (PMBOK guide), 6th edn. Newtown Square, Pennsylvania (2017)
3.
go back to reference Lu, M.: Productivity studies using advanced ANN models, Ph.D. dissertation. University of Alberta (2001) Lu, M.: Productivity studies using advanced ANN models, Ph.D. dissertation. University of Alberta (2001)
4.
go back to reference Hu, X., Lu, M., AbouRizk, S.: BIM-based data mining approach to estimating job man-hour requirements in structural steel fabrication. In: Proceedings of the Winter Simulation Conference 2014, Savanah, GA, 2014, pp. 3399–3410 (2014) Hu, X., Lu, M., AbouRizk, S.: BIM-based data mining approach to estimating job man-hour requirements in structural steel fabrication. In: Proceedings of the Winter Simulation Conference 2014, Savanah, GA, 2014, pp. 3399–3410 (2014)
5.
go back to reference Mohsenijam, A., Lu, M.: Achieving sustainable structural steel design by estimating fabrication labor cost based on BIM data. J. Procedia Eng. 145, 654–661 (2016)CrossRef Mohsenijam, A., Lu, M.: Achieving sustainable structural steel design by estimating fabrication labor cost based on BIM data. J. Procedia Eng. 145, 654–661 (2016)CrossRef
6.
go back to reference Siu, M.F., Lu, M., AbouRizk, S.: Optimizing job sequence and resource use in structural steel fabrication scheduling. In: 16th ICCCBE, Osaka, Japan (2016) Siu, M.F., Lu, M., AbouRizk, S.: Optimizing job sequence and resource use in structural steel fabrication scheduling. In: 16th ICCCBE, Osaka, Japan (2016)
7.
go back to reference Lu, M., Lam, H.C., Dai, F.: Resource-constrained critical path analysis based on discrete event simulation and particle swarm optimization. Autom. Const. 17(6), 670–681 (2008)CrossRef Lu, M., Lam, H.C., Dai, F.: Resource-constrained critical path analysis based on discrete event simulation and particle swarm optimization. Autom. Const. 17(6), 670–681 (2008)CrossRef
8.
go back to reference Clerc, M.: Practical Swarm Optimization, 1st edn. Wiley, Canada (2013) Clerc, M.: Practical Swarm Optimization, 1st edn. Wiley, Canada (2013)
9.
go back to reference Hegazy, T., Kassab, M.: Resource optimization using combined simulation and genetic algorithms. Const. Eng. Manag. 129(6), 698–705 (2003)CrossRef Hegazy, T., Kassab, M.: Resource optimization using combined simulation and genetic algorithms. Const. Eng. Manag. 129(6), 698–705 (2003)CrossRef
10.
go back to reference Liu, J., Lu, M.: Constraint programming approach to optimizing project schedules under material logistics and crew availability constraints. J. Const. Eng. Manag. 144(7), 04018049 (2018)CrossRef Liu, J., Lu, M.: Constraint programming approach to optimizing project schedules under material logistics and crew availability constraints. J. Const. Eng. Manag. 144(7), 04018049 (2018)CrossRef
Metadata
Title
Quantifying Resource Inter-activity Utilization Efficiency Through Simulation-Based Scheduling
Authors
Leila Zahedi
Ming Lu
Copyright Year
2021
DOI
https://doi.org/10.1007/978-3-030-51295-8_90