Published in: Water Resources Management 10/2021

01-07-2021

Risks Ranking in a Desalination Plant Construction Project with a Hybrid AHP, Risk Matrix, and Simulation-Based Approach

Authors: Georgios K. Koulinas, Alexandros S. Xanthopoulos, Konstantinos A. Sidas, Dimitrios E. Koulouriotis

Published in: Water Resources Management | Issue 10/2021

Log in

Activate our intelligent search to find suitable subject content or patents.

search-config
loading …

Abstract

This paper proposes a hybrid process based on the Analytical Hierarchy Process (AHP), risk matrix, and Monte Carlo Simulation for prioritizing delay risks in construction projects and estimating the probability of timely project completion. The main contribution of this study is the development of a novel framework for risk assessment that quantifies the impact of more critical risks to each activity according to its nature and benefits from the advantages of the AHP for constructing an enhanced risk matrix. In addition to the above, the proposed framework exploits the computational potential of Monte Carlo Simulation to obtain more accurate predictions of a project’s completion time. The proposed approach was used for analyzing the duration, expected delay, and the probability of completion within the deadline, of a vital seawater desalination plant construction project, on the island of Alonissos, Greece. The proposed framework predicted the project duration more accurately than the classic PERT method did, and the results of the analysis documented that it could be a simple tool providing risk managers with helpful information while making decisions under uncertainty.

Dont have a licence yet? Then find out more about our products and how to get one now:

Springer Professional "Technik"

Online-Abonnement

Mit Springer Professional "Technik" erhalten Sie Zugriff auf:

  • über 67.000 Bücher
  • über 390 Zeitschriften

aus folgenden Fachgebieten:

  • Automobil + Motoren
  • Bauwesen + Immobilien
  • Business IT + Informatik
  • Elektrotechnik + Elektronik
  • Energie + Nachhaltigkeit
  • Maschinenbau + Werkstoffe




 

Jetzt Wissensvorsprung sichern!

Springer Professional "Wirtschaft+Technik"

Online-Abonnement

Mit Springer Professional "Wirtschaft+Technik" erhalten Sie Zugriff auf:

  • über 102.000 Bücher
  • über 537 Zeitschriften

aus folgenden Fachgebieten:

  • Automobil + Motoren
  • Bauwesen + Immobilien
  • Business IT + Informatik
  • Elektrotechnik + Elektronik
  • Energie + Nachhaltigkeit
  • Finance + Banking
  • Management + Führung
  • Marketing + Vertrieb
  • Maschinenbau + Werkstoffe
  • Versicherung + Risiko

Jetzt Wissensvorsprung sichern!

Literature
go back to reference Attarzadeh M, Kim Huat Chua D, Beer M (2011) Risk Management of Asalouye Desalination Project. In: First International Symposium on Uncertainty Modeling and Analysis and Management (ICVRAM 2011); and Fifth International Symposium on Uncertainty Modeling and Analysis (ISUMA). Hyattsville, Maryland, United States, pp 805–812 Attarzadeh M, Kim Huat Chua D, Beer M (2011) Risk Management of Asalouye Desalination Project. In: First International Symposium on Uncertainty Modeling and Analysis and Management (ICVRAM 2011); and Fifth International Symposium on Uncertainty Modeling and Analysis (ISUMA). Hyattsville, Maryland, United States, pp 805–812
go back to reference Luthra S, Mangla SK, Venkatesh VG, Jakhar SK (2018) Management of risks in sustainable supply chain using AHP and monte carlo simulation. Global Business Expansion: Concepts, Methodologies, Tools, and Appl. Government Engineering College Nilokheri, India, pp 1633–1652CrossRef Luthra S, Mangla SK, Venkatesh VG, Jakhar SK (2018) Management of risks in sustainable supply chain using AHP and monte carlo simulation. Global Business Expansion: Concepts, Methodologies, Tools, and Appl. Government Engineering College Nilokheri, India, pp 1633–1652CrossRef
go back to reference Organization WH (2011) Safe Drinking-water from Desalination. 1–34 Organization WH (2011) Safe Drinking-water from Desalination. 1–34
go back to reference Rees M (2015) Business Risk and Simulation Modelling in Practice Using Excel, VBA and @RISK. John Wiley & Sons Ltd Rees M (2015) Business Risk and Simulation Modelling in Practice Using Excel, VBA and @RISK. John Wiley & Sons Ltd
go back to reference Yi D, Lee EB, Ahn J (2019) Onshore Oil and Gas Design Schedule Management Process Through Time-Impact Simulations Analyses. Sustain. 11 Yi D, Lee EB, Ahn J (2019) Onshore Oil and Gas Design Schedule Management Process Through Time-Impact Simulations Analyses. Sustain. 11
Metadata
Title
Risks Ranking in a Desalination Plant Construction Project with a Hybrid AHP, Risk Matrix, and Simulation-Based Approach
Authors
Georgios K. Koulinas
Alexandros S. Xanthopoulos
Konstantinos A. Sidas
Dimitrios E. Koulouriotis
Publication date
01-07-2021
Publisher
Springer Netherlands
Published in
Water Resources Management / Issue 10/2021
Print ISSN: 0920-4741
Electronic ISSN: 1573-1650
DOI
https://doi.org/10.1007/s11269-021-02886-4

Other articles of this Issue 10/2021

Water Resources Management 10/2021 Go to the issue