Skip to main content
Top
Published in: Fuzzy Optimization and Decision Making 3/2016

03-11-2015

Survey on fuzzy shop scheduling

Author: J. Behnamian

Published in: Fuzzy Optimization and Decision Making | Issue 3/2016

Log in

Activate our intelligent search to find suitable subject content or patents.

search-config
loading …

Abstract

The real life scheduling problems often have several uncertainties. The solutions of these problems can provide deeper insights to the decision maker than those of deterministic problems. Fuzzy set theory as most important tool to model uncertainty represents an attractive tool to aid research in the production management. Since to the best of our knowledge, there is not a comprehensive review on the fuzzy scheduling literature, the goal of this paper is to provide an extensive review for the fuzzy machine scheduling which it covers more than 140 papers. For this purpose, first, this paper classifies and reviews the literature according to shop environments, including single machine, parallel machines, flowshop, job shop and open shop. Then the reviewed literature is quantified and measured. At the end the paper concludes by presenting some problems receiving less attention than the others and proposing some research opportunities in the field.

Dont have a licence yet? Then find out more about our products and how to get one now:

Springer Professional "Wirtschaft+Technik"

Online-Abonnement

Mit Springer Professional "Wirtschaft+Technik" erhalten Sie Zugriff auf:

  • über 102.000 Bücher
  • über 537 Zeitschriften

aus folgenden Fachgebieten:

  • Automobil + Motoren
  • Bauwesen + Immobilien
  • Business IT + Informatik
  • Elektrotechnik + Elektronik
  • Energie + Nachhaltigkeit
  • Finance + Banking
  • Management + Führung
  • Marketing + Vertrieb
  • Maschinenbau + Werkstoffe
  • Versicherung + Risiko

Jetzt Wissensvorsprung sichern!

Springer Professional "Wirtschaft"

Online-Abonnement

Mit Springer Professional "Wirtschaft" erhalten Sie Zugriff auf:

  • über 67.000 Bücher
  • über 340 Zeitschriften

aus folgenden Fachgebieten:

  • Bauwesen + Immobilien
  • Business IT + Informatik
  • Finance + Banking
  • Management + Führung
  • Marketing + Vertrieb
  • Versicherung + Risiko




Jetzt Wissensvorsprung sichern!

Springer Professional "Technik"

Online-Abonnement

Mit Springer Professional "Technik" erhalten Sie Zugriff auf:

  • über 67.000 Bücher
  • über 390 Zeitschriften

aus folgenden Fachgebieten:

  • Automobil + Motoren
  • Bauwesen + Immobilien
  • Business IT + Informatik
  • Elektrotechnik + Elektronik
  • Energie + Nachhaltigkeit
  • Maschinenbau + Werkstoffe




 

Jetzt Wissensvorsprung sichern!

Literature
go back to reference Adamopoulos, G. I., & Pappis, C. P. (1996). A fuzzy-linguistic approach to a multi-criteria sequencing problem. European Journal of Operational Research, 92(3), 628–636.MATHCrossRef Adamopoulos, G. I., & Pappis, C. P. (1996). A fuzzy-linguistic approach to a multi-criteria sequencing problem. European Journal of Operational Research, 92(3), 628–636.MATHCrossRef
go back to reference Adamopoulos, G. I., & Pappis, C. P. (1998). A neighbourhood-based hybrid method for scheduling with fuzzy due-dates. International Transactions in Operational Research, 5(2), 147–153.CrossRef Adamopoulos, G. I., & Pappis, C. P. (1998). A neighbourhood-based hybrid method for scheduling with fuzzy due-dates. International Transactions in Operational Research, 5(2), 147–153.CrossRef
go back to reference Ahmadizar, F., & Hosseini, L. (2013). Minimizing makespan in a single-machine scheduling problem with a learning effect and fuzzy processing times. The International Journal of Advanced Manufacturing Technology, 65(1–4), 581–587.CrossRef Ahmadizar, F., & Hosseini, L. (2013). Minimizing makespan in a single-machine scheduling problem with a learning effect and fuzzy processing times. The International Journal of Advanced Manufacturing Technology, 65(1–4), 581–587.CrossRef
go back to reference Alcan, P., & Başlıgil, H. (2012). A genetic algorithm application using fuzzy processing times in non-identical parallel machine scheduling problem. Advances in Engineering Software, 45(1), 272–280.CrossRef Alcan, P., & Başlıgil, H. (2012). A genetic algorithm application using fuzzy processing times in non-identical parallel machine scheduling problem. Advances in Engineering Software, 45(1), 272–280.CrossRef
go back to reference Allet, S. (2003). Handling flexibility in a “generalised job shop” with a fuzzy approach. European Journal of Operational Research, 147, 312–333.MathSciNetMATHCrossRef Allet, S. (2003). Handling flexibility in a “generalised job shop” with a fuzzy approach. European Journal of Operational Research, 147, 312–333.MathSciNetMATHCrossRef
go back to reference Anglani, A., Grieco, A., Guerriero, E., & Musmanno, R. (2005). Robust scheduling of parallel machines with sequence-dependent set-up costs. European Journal of Operational Research, 161, 704–720.MathSciNetMATHCrossRef Anglani, A., Grieco, A., Guerriero, E., & Musmanno, R. (2005). Robust scheduling of parallel machines with sequence-dependent set-up costs. European Journal of Operational Research, 161, 704–720.MathSciNetMATHCrossRef
go back to reference Baker, K. R., & Trietsch, D. (2009). Principles of sequencing and scheduling (1st ed.). New Jersey: Wiley.MATHCrossRef Baker, K. R., & Trietsch, D. (2009). Principles of sequencing and scheduling (1st ed.). New Jersey: Wiley.MATHCrossRef
go back to reference Balasubramanian, J., & Grossmann, I. E. (2003). Scheduling optimization under uncertainty—an alternative approach. Computers & Chemical Engineering, 27, 469–490.CrossRef Balasubramanian, J., & Grossmann, I. E. (2003). Scheduling optimization under uncertainty—an alternative approach. Computers & Chemical Engineering, 27, 469–490.CrossRef
go back to reference Balin, S. (2011). Parallel machine scheduling with fuzzy processing times using a robust genetic algorithm and simulation. Information Sciences, 181(17), 3551–3569.CrossRef Balin, S. (2011). Parallel machine scheduling with fuzzy processing times using a robust genetic algorithm and simulation. Information Sciences, 181(17), 3551–3569.CrossRef
go back to reference Balin, S. (2012). Non-identical parallel machine scheduling with fuzzy processing times using genetic algorithm and simulation. The International Journal of Advanced Manufacturing Technology, 61(9–12), 1115–1127.CrossRef Balin, S. (2012). Non-identical parallel machine scheduling with fuzzy processing times using genetic algorithm and simulation. The International Journal of Advanced Manufacturing Technology, 61(9–12), 1115–1127.CrossRef
go back to reference Behnamian, J., & Ghomi, S. M. T. F. (2011). A heuristic algorithm for fuzzy single machine scheduling with specific due date. In 21th international conference on flexible automation and intelligent manufacturing (FAIM2011), Feng Chia University, Taiwan, June 2011. Behnamian, J., & Ghomi, S. M. T. F. (2011). A heuristic algorithm for fuzzy single machine scheduling with specific due date. In 21th international conference on flexible automation and intelligent manufacturing (FAIM2011), Feng Chia University, Taiwan, June 2011.
go back to reference Behnamian, J., & Ghomi, S. M. T. F. (2014). Multi-objective fuzzy multiprocessor flowshop scheduling. Applied Soft Computing, 21, 139–148.CrossRef Behnamian, J., & Ghomi, S. M. T. F. (2014). Multi-objective fuzzy multiprocessor flowshop scheduling. Applied Soft Computing, 21, 139–148.CrossRef
go back to reference Ben-Arieh, D., & Lee, E. S. (1995). Fuzzy logic controller for part routing. In H. R. Parsaei & M. Jamshidi (Eds.), Design and implementation of intelligent manufacturing systems: From expert systems, neural network, to fuzzy logic, Chapter 5, pp. 81–106. Englewood Cli9s, NJ: Prentice-Hall PTR. Ben-Arieh, D., & Lee, E. S. (1995). Fuzzy logic controller for part routing. In H. R. Parsaei & M. Jamshidi (Eds.), Design and implementation of intelligent manufacturing systems: From expert systems, neural network, to fuzzy logic, Chapter 5, pp. 81–106. Englewood Cli9s, NJ: Prentice-Hall PTR.
go back to reference Bilkay, O., Anlagan, O., & Kilic, S. E. (2004). Job shop scheduling using fuzzy logic. International Journal Advanced Manufacturing Technology, 23, 606–619.CrossRef Bilkay, O., Anlagan, O., & Kilic, S. E. (2004). Job shop scheduling using fuzzy logic. International Journal Advanced Manufacturing Technology, 23, 606–619.CrossRef
go back to reference Bozejko, W., Hejducki, Z., & Wodecki, M. (2008). Fuzzy blocks in genetic algorithm for the flowshop problem, HSI, May 2008. Poland: Krakow. Bozejko, W., Hejducki, Z., & Wodecki, M. (2008). Fuzzy blocks in genetic algorithm for the flowshop problem, HSI, May 2008. Poland: Krakow.
go back to reference Campbell, H., Dudek, R., & Smith, M. (1970). A heuristic algorithm for the n-job m-machine sequencing problem. Management Science B, 16, 630–637.MATHCrossRef Campbell, H., Dudek, R., & Smith, M. (1970). A heuristic algorithm for the n-job m-machine sequencing problem. Management Science B, 16, 630–637.MATHCrossRef
go back to reference Caprihan, R., Kumar, S., & Wadhwa, S. (1997). Fuzzy systems for control of flexible machines operation under information delays. International Journal of Production Research, 35(5), 1331–1348.MATHCrossRef Caprihan, R., Kumar, S., & Wadhwa, S. (1997). Fuzzy systems for control of flexible machines operation under information delays. International Journal of Production Research, 35(5), 1331–1348.MATHCrossRef
go back to reference Celano, G., Costa, A., & Fichera, S. (2003). An evolutionary algorithm for pure fuzzy flowshop scheduling problems. International Journal of Uncertainty, Fuzziness and Knowledge-Based Systems, 11, 655–669.MathSciNetMATHCrossRef Celano, G., Costa, A., & Fichera, S. (2003). An evolutionary algorithm for pure fuzzy flowshop scheduling problems. International Journal of Uncertainty, Fuzziness and Knowledge-Based Systems, 11, 655–669.MathSciNetMATHCrossRef
go back to reference Chanas, S., & Kasperski, A. (2001). Minimizing maximum lateness in a single machine scheduling problem with fuzzy processing times and fuzzy due dates. Engineering Applications of Artificial Intelligence, 14, 377–386.CrossRef Chanas, S., & Kasperski, A. (2001). Minimizing maximum lateness in a single machine scheduling problem with fuzzy processing times and fuzzy due dates. Engineering Applications of Artificial Intelligence, 14, 377–386.CrossRef
go back to reference Chanas, S., & Kasperski, A. (2003). On two single machine scheduling problems with fuzzy processing times and fuzzy due dates. European Journal of Operational Research, 147, 281–296.MathSciNetMATHCrossRef Chanas, S., & Kasperski, A. (2003). On two single machine scheduling problems with fuzzy processing times and fuzzy due dates. European Journal of Operational Research, 147, 281–296.MathSciNetMATHCrossRef
go back to reference Chanas, S., & Kasperski, A. (2004). Possible and necessary optimality of solutions in the single machine scheduling problem with fuzzy parameters. Fuzzy Sets and Systems, 142, 359–371.MathSciNetMATHCrossRef Chanas, S., & Kasperski, A. (2004). Possible and necessary optimality of solutions in the single machine scheduling problem with fuzzy parameters. Fuzzy Sets and Systems, 142, 359–371.MathSciNetMATHCrossRef
go back to reference Chang, P.-T., & Lo, Y.-T. (2001). Modelling of job-shop scheduling with multiple quantitative and qualitative objectives and a GA/TS mixture approach. International Journal of Computer Integrated Manufacturing, 14(4), 367–384.CrossRef Chang, P.-T., & Lo, Y.-T. (2001). Modelling of job-shop scheduling with multiple quantitative and qualitative objectives and a GA/TS mixture approach. International Journal of Computer Integrated Manufacturing, 14(4), 367–384.CrossRef
go back to reference Chaudhuri, A., & De, K. (2010). Job scheduling problem using rough fuzzy multilayer perception neural networks. Journal of Artificial Intelligence: Theory and Application, 1(1), 4–19. Chaudhuri, A., & De, K. (2010). Job scheduling problem using rough fuzzy multilayer perception neural networks. Journal of Artificial Intelligence: Theory and Application, 1(1), 4–19.
go back to reference Cheng, B., Li, K., & Chen, B. (2010). Scheduling a single batch-processing machine with non-identical job sizes in fuzzy environment using an improved ant colony optimization. Journal of Manufacturing Systems, 29(1), 29–34.MathSciNetCrossRef Cheng, B., Li, K., & Chen, B. (2010). Scheduling a single batch-processing machine with non-identical job sizes in fuzzy environment using an improved ant colony optimization. Journal of Manufacturing Systems, 29(1), 29–34.MathSciNetCrossRef
go back to reference Cheng, J., Kise, H., & Matsumoto, H. (1997). A branch-and-bound algorithm with fuzzy inference for a permutation flowshop scheduling problem. European Journal of Operational Research, 96(3), 578–590.MATHCrossRef Cheng, J., Kise, H., & Matsumoto, H. (1997). A branch-and-bound algorithm with fuzzy inference for a permutation flowshop scheduling problem. European Journal of Operational Research, 96(3), 578–590.MATHCrossRef
go back to reference Cheng, S. X. (1999). Fuzzy clustering with and application to scheduling, Master’s thesis, Concordia University, March 1999, Montreal, Canada. Cheng, S. X. (1999). Fuzzy clustering with and application to scheduling, Master’s thesis, Concordia University, March 1999, Montreal, Canada.
go back to reference Chyu, C.-C., & Chang, W.-S. (2011). Optimizing fuzzy makespan and tardiness for unrelated parallel machine scheduling with archived metaheuristics. The International Journal of Advanced Manufacturing Technology, 57(5–8), 763–776.CrossRef Chyu, C.-C., & Chang, W.-S. (2011). Optimizing fuzzy makespan and tardiness for unrelated parallel machine scheduling with archived metaheuristics. The International Journal of Advanced Manufacturing Technology, 57(5–8), 763–776.CrossRef
go back to reference Demirli, K., Cheng, S. X., & Muthukumaran, P. (2003). Subtractive clustering based modeling of job sequencing with parametric search. Fuzzy Sets and Systems, 137, 235–270.MathSciNetMATHCrossRef Demirli, K., Cheng, S. X., & Muthukumaran, P. (2003). Subtractive clustering based modeling of job sequencing with parametric search. Fuzzy Sets and Systems, 137, 235–270.MathSciNetMATHCrossRef
go back to reference Dubois, D., Fargier, H., & Prade, H. (1995). Fuzzy constraints in job-shop scheduling. Journal of Intelligent Manufacturing, 6, 215–234.CrossRef Dubois, D., Fargier, H., & Prade, H. (1995). Fuzzy constraints in job-shop scheduling. Journal of Intelligent Manufacturing, 6, 215–234.CrossRef
go back to reference Duenas, A., & Petrovic, D. (2008). Multi-objective genetic algorithm for single machine scheduling problem under fuzziness. Fuzzy Optimization and Decision Making, 7, 87–104.MathSciNetMATHCrossRef Duenas, A., & Petrovic, D. (2008). Multi-objective genetic algorithm for single machine scheduling problem under fuzziness. Fuzzy Optimization and Decision Making, 7, 87–104.MathSciNetMATHCrossRef
go back to reference Dumitru, V., & Luban, F. (1982). Membership functions, some mathematical programming models and production scheduling. Fuzzy Sets and Systems, 8, 19–33.MathSciNetMATHCrossRef Dumitru, V., & Luban, F. (1982). Membership functions, some mathematical programming models and production scheduling. Fuzzy Sets and Systems, 8, 19–33.MathSciNetMATHCrossRef
go back to reference Fahmy, M. M. M. (2010). A fuzzy algorithm for scheduling non-periodic jobs on soft real-time single processor system. Ain Shams Engineering Journal, 1(1), 31–38.MathSciNetCrossRef Fahmy, M. M. M. (2010). A fuzzy algorithm for scheduling non-periodic jobs on soft real-time single processor system. Ain Shams Engineering Journal, 1(1), 31–38.MathSciNetCrossRef
go back to reference Fayad, C., & Petrovic, S. (2005). A genetic algorithm for the real world fuzzy job-shop scheduling. In Proceedings of the international conference on industrial and engineering applications of artificial intelligence and expert systems IEA/AIE-2005. Berlin: Springer. Fayad, C., & Petrovic, S. (2005). A genetic algorithm for the real world fuzzy job-shop scheduling. In Proceedings of the international conference on industrial and engineering applications of artificial intelligence and expert systems IEA/AIE-2005. Berlin: Springer.
go back to reference Fortemps, P. (1997). Jobshop scheduling with imprecise durations: A fuzzy approach. IEEE Transactions on Fuzzy Systems, 5, 557–569.CrossRef Fortemps, P. (1997). Jobshop scheduling with imprecise durations: A fuzzy approach. IEEE Transactions on Fuzzy Systems, 5, 557–569.CrossRef
go back to reference Franke, C., Hoffmann, F., Lepping, J., & Schwiegelshohn, U. (2008). Development of scheduling strategies with genetic fuzzy systems. Applied Soft Computing, 8, 706–721.CrossRef Franke, C., Hoffmann, F., Lepping, J., & Schwiegelshohn, U. (2008). Development of scheduling strategies with genetic fuzzy systems. Applied Soft Computing, 8, 706–721.CrossRef
go back to reference Geng, Z.-Q., & Zou, Y.-R. (2001). Using HGA to solve E/T scheduling problems with fuzzy processing time and fuzzy due date. Systems, Man, and Cybernetics, 2, 1161–1166. Geng, Z.-Q., & Zou, Y.-R. (2001). Using HGA to solve E/T scheduling problems with fuzzy processing time and fuzzy due date. Systems, Man, and Cybernetics, 2, 1161–1166.
go back to reference Gharehgozli, A. H., Tavakkoli-Moghaddam, R., & Zaerpour, N. (2009). A fuzzy-mixed-integer goal programming model for a parallel-machine scheduling problem with sequence-dependent setup times and release dates. Robotics and Computer-Integrated Manufacturing, 25, 853–859.CrossRef Gharehgozli, A. H., Tavakkoli-Moghaddam, R., & Zaerpour, N. (2009). A fuzzy-mixed-integer goal programming model for a parallel-machine scheduling problem with sequence-dependent setup times and release dates. Robotics and Computer-Integrated Manufacturing, 25, 853–859.CrossRef
go back to reference Ghrayeb, O. (2000). An efficient genetic algorithm for JSSP with fuzzy durations. In Proceedings of industrial engineering research conference, Cleveland, OH. Ghrayeb, O. (2000). An efficient genetic algorithm for JSSP with fuzzy durations. In Proceedings of industrial engineering research conference, Cleveland, OH.
go back to reference Ghrayeb, O. A. (2003). A bi-criteria optimization: Minimizing the integral value and spread of the fuzzy makespan of job shop scheduling problems. Applied Soft Computing, 2(3), 197–210.CrossRef Ghrayeb, O. A. (2003). A bi-criteria optimization: Minimizing the integral value and spread of the fuzzy makespan of job shop scheduling problems. Applied Soft Computing, 2(3), 197–210.CrossRef
go back to reference Guiffrida, A. L., & Nagi, R. (1998). Fuzzy set theory applications in production management research: A literature survey. Journal of Intelligent Manufacturing, 9, 39–56.CrossRef Guiffrida, A. L., & Nagi, R. (1998). Fuzzy set theory applications in production management research: A literature survey. Journal of Intelligent Manufacturing, 9, 39–56.CrossRef
go back to reference Gupta, D., Sharma, S., & Aggarwal, S. (2013). Flow shop scheduling on 2-machines with setup time and single transport facility under fuzzy environment. OPSEARCH, 50(1), 14–24.MathSciNetCrossRef Gupta, D., Sharma, S., & Aggarwal, S. (2013). Flow shop scheduling on 2-machines with setup time and single transport facility under fuzzy environment. OPSEARCH, 50(1), 14–24.MathSciNetCrossRef
go back to reference Han, S., Ishii, H., & Fujii, S. (1994). One machine scheduling problem with fuzzy duedates. European Journal of Operational Research, 79, 1–12.MATHCrossRef Han, S., Ishii, H., & Fujii, S. (1994). One machine scheduling problem with fuzzy duedates. European Journal of Operational Research, 79, 1–12.MATHCrossRef
go back to reference Harikrishnan, K. K., & Ishii, H. (2005). Single machine batch scheduling problem with resource dependent setup and processing time in the presence of fuzzy due date. Fuzzy Optimization and Decision Making, 4(2), 141–147.MathSciNetMATHCrossRef Harikrishnan, K. K., & Ishii, H. (2005). Single machine batch scheduling problem with resource dependent setup and processing time in the presence of fuzzy due date. Fuzzy Optimization and Decision Making, 4(2), 141–147.MathSciNetMATHCrossRef
go back to reference Hong, T. P., & Chen, W. C. (1998). Fuzzy flexible-flowshops at two machine centers. Journal of Advanced Computational Intelligence, 2(4), 142–149.MathSciNetCrossRef Hong, T. P., & Chen, W. C. (1998). Fuzzy flexible-flowshops at two machine centers. Journal of Advanced Computational Intelligence, 2(4), 142–149.MathSciNetCrossRef
go back to reference Hong, T. P., Yu, K. M., & Huang, C. M. (1998). LPT scheduling on fuzzy tasks with triangular membership function. In L. C. Jain & R. K. Jab (Eds.), Second international conference on knowledge-based intelligent elecwonic systems, April 1998. Adelaide. Hong, T. P., Yu, K. M., & Huang, C. M. (1998). LPT scheduling on fuzzy tasks with triangular membership function. In L. C. Jain & R. K. Jab (Eds.), Second international conference on knowledge-based intelligent elecwonic systems, April 1998. Adelaide.
go back to reference Hong, T.-P., & Wang, T.-T. (1999). A heuristic palmer-based fuzzy flexible flowshop scheduling algorithm. In IEEE international fuzzy systems conference proceedings, August 1999. Seoul, Korea. Hong, T.-P., & Wang, T.-T. (1999). A heuristic palmer-based fuzzy flexible flowshop scheduling algorithm. In IEEE international fuzzy systems conference proceedings, August 1999. Seoul, Korea.
go back to reference Hong, T.-P., & Wang, T.-T. (2000). Fuzzy flexible flowshops at two machine centers for continuous fuzzy domains. Information Sciences, 129, 227–237.MathSciNetMATHCrossRef Hong, T.-P., & Wang, T.-T. (2000). Fuzzy flexible flowshops at two machine centers for continuous fuzzy domains. Information Sciences, 129, 227–237.MathSciNetMATHCrossRef
go back to reference Hu, Y., Yin, M., & Li, X. (2011). A novel objective function for jobshop scheduling problem with fuzzy processing time and fuzzy due date using differential evolution algorithm. The International Journal of Advanced Manufacturing Technology, 56(9–12), 1125–1138.CrossRef Hu, Y., Yin, M., & Li, X. (2011). A novel objective function for jobshop scheduling problem with fuzzy processing time and fuzzy due date using differential evolution algorithm. The International Journal of Advanced Manufacturing Technology, 56(9–12), 1125–1138.CrossRef
go back to reference Huang, C.-S., Huang, Y.-C., & Lai, P.-J. (2012). Modified genetic algorithms for solving fuzzy flow shop scheduling problems and their implementation with CUDA. Expert Systems with Applications, 39(5), 4999–5005.CrossRef Huang, C.-S., Huang, Y.-C., & Lai, P.-J. (2012). Modified genetic algorithms for solving fuzzy flow shop scheduling problems and their implementation with CUDA. Expert Systems with Applications, 39(5), 4999–5005.CrossRef
go back to reference Ishibuchi, H., & Murata, T. (2000). Flowshop scheduling with fuzzy due date and fuzzy processing time. In R. Slowinski & M. Hapke (Eds.), Scheduling under fuzziness (pp. 113–143). Heidelberg: Physica. Ishibuchi, H., & Murata, T. (2000). Flowshop scheduling with fuzzy due date and fuzzy processing time. In R. Slowinski & M. Hapke (Eds.), Scheduling under fuzziness (pp. 113–143). Heidelberg: Physica.
go back to reference Ishibuchi, H., Murata T., & Lee, K. H. (1996a). Formulation of fuzzy flowshop scheduling problems with fuzzy processing time. In Proceedings of the 15th international conference on fuzzy systems, New Orleans. Ishibuchi, H., Murata T., & Lee, K. H. (1996a). Formulation of fuzzy flowshop scheduling problems with fuzzy processing time. In Proceedings of the 15th international conference on fuzzy systems, New Orleans.
go back to reference Ishibuchi, H., Murata, T., & Lee, K.-H. (1996b). Relations between conventional scheduling problems and fuzzy scheduling problems. In Proceedings of 35th IEEE conference on decision and control, pp. 106–107. Ishibuchi, H., Murata, T., & Lee, K.-H. (1996b). Relations between conventional scheduling problems and fuzzy scheduling problems. In Proceedings of 35th IEEE conference on decision and control, pp. 106–107.
go back to reference Ishibuchi, H., Yamamoto, N., Misaki, S., & Tanaka, H. (1994a). Local search algorithms for flowshop scheduling with fuzzy due-dates. International Journal of Production Economics, 33, 53–66.CrossRef Ishibuchi, H., Yamamoto, N., Misaki, S., & Tanaka, H. (1994a). Local search algorithms for flowshop scheduling with fuzzy due-dates. International Journal of Production Economics, 33, 53–66.CrossRef
go back to reference Ishibuchi, H., Yamamoto, N., Murata, T., & Tanaka, H. (1994b). Genetic algorithms and neighborhood search algorithms for fuzzy flowshop scheduling problems. Fuzzy Sets and Systems, 67, 81–100.MathSciNetCrossRef Ishibuchi, H., Yamamoto, N., Murata, T., & Tanaka, H. (1994b). Genetic algorithms and neighborhood search algorithms for fuzzy flowshop scheduling problems. Fuzzy Sets and Systems, 67, 81–100.MathSciNetCrossRef
go back to reference Ishii, H., & Tada, M. (1995). Single machine scheduling problem with fuzzy precedence relation. European Journal of Operational Research, 87(2), 284–288.MATHCrossRef Ishii, H., & Tada, M. (1995). Single machine scheduling problem with fuzzy precedence relation. European Journal of Operational Research, 87(2), 284–288.MATHCrossRef
go back to reference Itoh, T., & Ishii, H. (1999). Fuzzy due-date scheduling problem with fuzzy processing time. International Transactions in Operational Research, 6(6), 639–647.CrossRef Itoh, T., & Ishii, H. (1999). Fuzzy due-date scheduling problem with fuzzy processing time. International Transactions in Operational Research, 6(6), 639–647.CrossRef
go back to reference Itoh, T., & Ishiiv, H. (2005). One machine scheduling problem with fuzzy random due-dates. Fuzzy Optimization and Decision Making, 4(1), 71–78.MathSciNetMATHCrossRef Itoh, T., & Ishiiv, H. (2005). One machine scheduling problem with fuzzy random due-dates. Fuzzy Optimization and Decision Making, 4(1), 71–78.MathSciNetMATHCrossRef
go back to reference Javadi, B., Saidi-Mehrabad, M., Haji, A., Mahdavi, I., Jolai, F., & Mahdavi-Amiri, N. (2008). No-wait flowshop scheduling using fuzzy multi-objective linear programming. Journal of the Franklin Institute, 345, 452–467.MATHCrossRef Javadi, B., Saidi-Mehrabad, M., Haji, A., Mahdavi, I., Jolai, F., & Mahdavi-Amiri, N. (2008). No-wait flowshop scheduling using fuzzy multi-objective linear programming. Journal of the Franklin Institute, 345, 452–467.MATHCrossRef
go back to reference Kacem, I., Hammadi, S., & Borne, P. (2002). Pareto-optimality approach for flexible job-shop scheduling problems: Hybridization of evolutionary algorithms and fuzzy logic. Mathematics and Computers in Simulation, 60, 245–276.MathSciNetMATHCrossRef Kacem, I., Hammadi, S., & Borne, P. (2002). Pareto-optimality approach for flexible job-shop scheduling problems: Hybridization of evolutionary algorithms and fuzzy logic. Mathematics and Computers in Simulation, 60, 245–276.MathSciNetMATHCrossRef
go back to reference Kilic, S. (2007). Scheduling a fuzzy flowshop problem with flexible due dates using ant colony optimization. In M. Giacobini et al. (Eds.), EvoWorkshops 2007, LNCS 4448, pp. 742–751. Kilic, S. (2007). Scheduling a fuzzy flowshop problem with flexible due dates using ant colony optimization. In M. Giacobini et al. (Eds.), EvoWorkshops 2007, LNCS 4448, pp. 742–751.
go back to reference Konno, T., & Ishii, H. (2000). An open shop scheduling problem with fuzzy allowable time and fuzzy resource constraint. Fuzzy Sets and Systems, 109, 141–147.MathSciNetCrossRef Konno, T., & Ishii, H. (2000). An open shop scheduling problem with fuzzy allowable time and fuzzy resource constraint. Fuzzy Sets and Systems, 109, 141–147.MathSciNetCrossRef
go back to reference Kuroda, M., & Wang, Z. (1996). Fuzzy job shop scheduling. International Journal of Production Economic, 44, 45–51.CrossRef Kuroda, M., & Wang, Z. (1996). Fuzzy job shop scheduling. International Journal of Production Economic, 44, 45–51.CrossRef
go back to reference Lai, P.-J., & Shu, M.-H. (2008). Tardiness in fuzzy flowshop scheduling problems based on possibility and necessity measures. In 8th international conference on intelligent systems design and applications. Lai, P.-J., & Shu, M.-H. (2008). Tardiness in fuzzy flowshop scheduling problems based on possibility and necessity measures. In 8th international conference on intelligent systems design and applications.
go back to reference Lai, P.-J., & Wu, H.-C. (2011). Evaluate the fuzzy completion times in the fuzzy flow shop scheduling problems using the virus-evolutionary genetic algorithms. Applied Soft Computing, 11(8), 4540–4550.CrossRef Lai, P.-J., & Wu, H.-C. (2011). Evaluate the fuzzy completion times in the fuzzy flow shop scheduling problems using the virus-evolutionary genetic algorithms. Applied Soft Computing, 11(8), 4540–4550.CrossRef
go back to reference Lam, S. S., & Cai, X. (2002). Single machine scheduling with nonlinear lateness cost functions and fuzzy due dates. Nonlinear Analysis: Real World Applications, 3, 307–316.MathSciNetMATHCrossRef Lam, S. S., & Cai, X. (2002). Single machine scheduling with nonlinear lateness cost functions and fuzzy due dates. Nonlinear Analysis: Real World Applications, 3, 307–316.MathSciNetMATHCrossRef
go back to reference Lee, H. T., Chen, S. H., & Kang, H. Y. (2002). Multicriteria scheduling using fuzzy theory and tabu search. International Journal of Production Research, 40(5), 1221–1234.MATHCrossRef Lee, H. T., Chen, S. H., & Kang, H. Y. (2002). Multicriteria scheduling using fuzzy theory and tabu search. International Journal of Production Research, 40(5), 1221–1234.MATHCrossRef
go back to reference Lei, D. M. (2007). Pareto archive particle swarm optimization for multi-objective fuzzy job shop scheduling problems. International Journal Advanced Manufacturing Technology, 37(1–2), 157–165. Lei, D. M. (2007). Pareto archive particle swarm optimization for multi-objective fuzzy job shop scheduling problems. International Journal Advanced Manufacturing Technology, 37(1–2), 157–165.
go back to reference Lei, D. M. (2008). Pareto archive particle swarm optimization for multi-objective fuzzy job shop scheduling problems. International Journal of Advanced Manufacturing Technology, 37, 157–165.CrossRef Lei, D. M. (2008). Pareto archive particle swarm optimization for multi-objective fuzzy job shop scheduling problems. International Journal of Advanced Manufacturing Technology, 37, 157–165.CrossRef
go back to reference Lei, D. M. (2010c). A genetic algorithm for flexible job shop scheduling with fuzzy processing time. International Journal of Production Research, 48(10), 2995–3013.MATHCrossRef Lei, D. M. (2010c). A genetic algorithm for flexible job shop scheduling with fuzzy processing time. International Journal of Production Research, 48(10), 2995–3013.MATHCrossRef
go back to reference Lei, D. (2012). Co-evolutionary genetic algorithm for fuzzy flexible job shop scheduling. Applied Soft Computing, 12(8), 2237–2245.CrossRef Lei, D. (2012). Co-evolutionary genetic algorithm for fuzzy flexible job shop scheduling. Applied Soft Computing, 12(8), 2237–2245.CrossRef
go back to reference Lei, D., & Guo, X. (2012). Swarm-based neighbourhood search algorithm for fuzzy flexible job shop scheduling. International Journal of Production Research, 50(6), 1639–1649.MathSciNetCrossRef Lei, D., & Guo, X. (2012). Swarm-based neighbourhood search algorithm for fuzzy flexible job shop scheduling. International Journal of Production Research, 50(6), 1639–1649.MathSciNetCrossRef
go back to reference Li, F. M., Zhu, Y. L., Yin, C. W., & Song, X. Y. (2005). Fuzzy programming for multi-objective fuzzy job shop scheduling with alternative machines through genetic algorithm. In L. Wang, K. Chen, & Y. S. Ong (Eds.), Advance in natural computation (pp. 992–1004). Berlin: Springer.CrossRef Li, F. M., Zhu, Y. L., Yin, C. W., & Song, X. Y. (2005). Fuzzy programming for multi-objective fuzzy job shop scheduling with alternative machines through genetic algorithm. In L. Wang, K. Chen, & Y. S. Ong (Eds.), Advance in natural computation (pp. 992–1004). Berlin: Springer.CrossRef
go back to reference Li, J., Sun, K., Xu, D., & Li, H. (2010a). Single machine due date assignment scheduling problem with customer service level in fuzzy environment. Applied Soft Computing, 10(3), 849–858.CrossRef Li, J., Sun, K., Xu, D., & Li, H. (2010a). Single machine due date assignment scheduling problem with customer service level in fuzzy environment. Applied Soft Computing, 10(3), 849–858.CrossRef
go back to reference Li, J.-Q., & Pan, Q.-K. (2013a). Chemical-reaction optimization for solving fuzzy job-shop scheduling problem with flexible maintenance activities. International Journal of Production Economics, 145(1), 4–17.CrossRef Li, J.-Q., & Pan, Q.-K. (2013a). Chemical-reaction optimization for solving fuzzy job-shop scheduling problem with flexible maintenance activities. International Journal of Production Economics, 145(1), 4–17.CrossRef
go back to reference Li, J.-Q., & Pan, Y.-X. (2013b). A hybrid discrete particle swarm optimization algorithm for solving fuzzy job shop scheduling problem. The International Journal of Advanced Manufacturing Technology, 66(1–4), 583–596.CrossRef Li, J.-Q., & Pan, Y.-X. (2013b). A hybrid discrete particle swarm optimization algorithm for solving fuzzy job shop scheduling problem. The International Journal of Advanced Manufacturing Technology, 66(1–4), 583–596.CrossRef
go back to reference Li, X., Ishii, H., & Masuda, T. (2012). Single machine batch scheduling problem with fuzzy batch size. Computers & Industrial Engineering, 62(3), 688–692.CrossRef Li, X., Ishii, H., & Masuda, T. (2012). Single machine batch scheduling problem with fuzzy batch size. Computers & Industrial Engineering, 62(3), 688–692.CrossRef
go back to reference Li, Y., Luh, P. B., & Guan, X. (1994). Fuzzy optimization-based scheduling of identical machines with possible breakdown. In Robotics and automation, proceedings, IEEE international conference, May 1994, vol. 4, pp. 3447–3452, San Diego, CA. Li, Y., Luh, P. B., & Guan, X. (1994). Fuzzy optimization-based scheduling of identical machines with possible breakdown. In Robotics and automation, proceedings, IEEE international conference, May 1994, vol. 4, pp. 3447–3452, San Diego, CA.
go back to reference Li, Y., Zheng, J.-Q., & Yang, S.-L. (2010b). Multi-agent-based fuzzy scheduling for shop floor. International journal advanced manufacturing technology. doi:10.1007/s00170-009-2410-3. Li, Y., Zheng, J.-Q., & Yang, S.-L. (2010b). Multi-agent-based fuzzy scheduling for shop floor. International journal advanced manufacturing technology. doi:10.​1007/​s00170-009-2410-3.
go back to reference Lin, F.-T. (2002). Fuzzy job-shop scheduling based on ranking level (\(\lambda \), 1) interval-valued fuzzy numbers. IEEE Transactions on Fuzzy Systems, 10(4), 510–522.CrossRef Lin, F.-T. (2002). Fuzzy job-shop scheduling based on ranking level (\(\lambda \), 1) interval-valued fuzzy numbers. IEEE Transactions on Fuzzy Systems, 10(4), 510–522.CrossRef
go back to reference Liu, J.-J. (2009). Application of optimization genetic algorithm in fuzzy job shop scheduling problem. In Proceedings of the 2009 WRI global congress on intelligent systems, vol. 1, pp. 436-440. Liu, J.-J. (2009). Application of optimization genetic algorithm in fuzzy job shop scheduling problem. In Proceedings of the 2009 WRI global congress on intelligent systems, vol. 1, pp. 436-440.
go back to reference Liu, M., Chen, D., Wu, C., & Li, H. (2006a). Approximation theorem of the fuzzy transform in fuzzy reasoning and its application to the scheduling problem. Computers & Mathematics with Applications, 51, 515–526.MathSciNetMATHCrossRef Liu, M., Chen, D., Wu, C., & Li, H. (2006a). Approximation theorem of the fuzzy transform in fuzzy reasoning and its application to the scheduling problem. Computers & Mathematics with Applications, 51, 515–526.MathSciNetMATHCrossRef
go back to reference Liu, M., Chen, D., Wu, C., & Li, H. (2006b). Fuzzy reasoning based on a new fuzzy rough set and its application to scheduling problems. Computers & Mathematics with Applications, 51, 1507–1518.MathSciNetMATHCrossRef Liu, M., Chen, D., Wu, C., & Li, H. (2006b). Fuzzy reasoning based on a new fuzzy rough set and its application to scheduling problems. Computers & Mathematics with Applications, 51, 1507–1518.MathSciNetMATHCrossRef
go back to reference Liu, Q., & Gu, X. (2002). A kind of flowshop schedule problem with uncertain processing time. In Proceedings of the 4th world congress on intelligent control and automation, June 2002, Shanghai, China. Liu, Q., & Gu, X. (2002). A kind of flowshop schedule problem with uncertain processing time. In Proceedings of the 4th world congress on intelligent control and automation, June 2002, Shanghai, China.
go back to reference McCahon, S., & Lee, E. S. (1990). Job sequencing with fuzzy processing times. Computers & Mathematics with Applications, 19(7), 31–41.MathSciNetMATHCrossRef McCahon, S., & Lee, E. S. (1990). Job sequencing with fuzzy processing times. Computers & Mathematics with Applications, 19(7), 31–41.MathSciNetMATHCrossRef
go back to reference McCahon, C. S., & Lee, E. S. (1992). Fuzzy job sequencing for a flowshop. European Journal of Operational Research, 62, 294–305.MATHCrossRef McCahon, C. S., & Lee, E. S. (1992). Fuzzy job sequencing for a flowshop. European Journal of Operational Research, 62, 294–305.MATHCrossRef
go back to reference Mehrabad, M. S., & Pahlavani, A. (2009). A fuzzy multi-objective programming for scheduling of weighted jobs on a single machine. The International Journal of Advanced Manufacturing Technology, 45(1–2), 122–139.CrossRef Mehrabad, M. S., & Pahlavani, A. (2009). A fuzzy multi-objective programming for scheduling of weighted jobs on a single machine. The International Journal of Advanced Manufacturing Technology, 45(1–2), 122–139.CrossRef
go back to reference Muralidhar, A., & Alwarsamy, T. (2009). Multi-objective optimization of parallel machine scheduling using fuzzy logic and simulated annealing. International Journal of Applied Engineering Research, 4(11), 2141–2143. Muralidhar, A., & Alwarsamy, T. (2009). Multi-objective optimization of parallel machine scheduling using fuzzy logic and simulated annealing. International Journal of Applied Engineering Research, 4(11), 2141–2143.
go back to reference Murata, T., Gen, M., & Ishibuchi, H. (1998). Multi-objective scheduling with fuzzy due-date. Computers & Industrial Engineering, 35(3–4), 439–442.CrossRef Murata, T., Gen, M., & Ishibuchi, H. (1998). Multi-objective scheduling with fuzzy due-date. Computers & Industrial Engineering, 35(3–4), 439–442.CrossRef
go back to reference Muthusamy, K., Sung, S., Vlach, M., & Ishii, H. (2003). Scheduling with fuzzy delays and fuzzy precedences. Fuzzy Sets and Systems, 134, 387–395.MathSciNetMATHCrossRef Muthusamy, K., Sung, S., Vlach, M., & Ishii, H. (2003). Scheduling with fuzzy delays and fuzzy precedences. Fuzzy Sets and Systems, 134, 387–395.MathSciNetMATHCrossRef
go back to reference Nakhaeinejad, M., & Nahavandi, N. (2013). An interactive algorithm for multi-objective flow shop scheduling with fuzzy processing time through resolution method and TOPSIS. The International Journal of Advanced Manufacturing Technology, 66(5–8), 1047–1064.CrossRef Nakhaeinejad, M., & Nahavandi, N. (2013). An interactive algorithm for multi-objective flow shop scheduling with fuzzy processing time through resolution method and TOPSIS. The International Journal of Advanced Manufacturing Technology, 66(5–8), 1047–1064.CrossRef
go back to reference Nezhad, S. S., & Assadi, R. G. (2008). Preference ratio-based maximum operator approximation and its application in fuzzy flowshop scheduling. Applied Soft Computing, 8, 759–766.CrossRef Nezhad, S. S., & Assadi, R. G. (2008). Preference ratio-based maximum operator approximation and its application in fuzzy flowshop scheduling. Applied Soft Computing, 8, 759–766.CrossRef
go back to reference Niu, Q., Jiao, B., & Gu, X. (2008). Particle swarm optimization combined with genetic operators for job shop scheduling problem with fuzzy processing time. Applied Mathematics and Computation, 205, 148–158.MathSciNetMATHCrossRef Niu, Q., Jiao, B., & Gu, X. (2008). Particle swarm optimization combined with genetic operators for job shop scheduling problem with fuzzy processing time. Applied Mathematics and Computation, 205, 148–158.MathSciNetMATHCrossRef
go back to reference Noori-Darvish, S., Mahdavi, I., & Mahdavi-Amiri, N. (2012). A bi-objective possibilistic programming model for open shop scheduling problems with sequence-dependent setup times, fuzzy processing times, and fuzzy due dates. Applied Soft Computing, 12(4), 1399–1416.CrossRef Noori-Darvish, S., Mahdavi, I., & Mahdavi-Amiri, N. (2012). A bi-objective possibilistic programming model for open shop scheduling problems with sequence-dependent setup times, fuzzy processing times, and fuzzy due dates. Applied Soft Computing, 12(4), 1399–1416.CrossRef
go back to reference Okabe, T., Maeda, M., & Murakami, S. (1999). On the fuzzy scheduling for flowshop jobs by using genetic algorithm. In Systems, man, and cybernetics, IEEE SMC ’99 conference proceedings, pp. 528–539, Oct. 1999. Okabe, T., Maeda, M., & Murakami, S. (1999). On the fuzzy scheduling for flowshop jobs by using genetic algorithm. In Systems, man, and cybernetics, IEEE SMC ’99 conference proceedings, pp. 528–539, Oct. 1999.
go back to reference Peng, J., & Liu, B. (2004). Parallel machine scheduling models with fuzzy processing times. Information Sciences, 166(1–4), 49–66.MathSciNetMATHCrossRef Peng, J., & Liu, B. (2004). Parallel machine scheduling models with fuzzy processing times. Information Sciences, 166(1–4), 49–66.MathSciNetMATHCrossRef
go back to reference Peng, J., & Song, K. (2001). Expected value goal programming models for fuzzy scheduling problem. In Proceedings of the tenth IEEE international conference on fuzzy systems, December 2001, pp. 292–295. Melbourne, Australia. Peng, J., & Song, K. (2001). Expected value goal programming models for fuzzy scheduling problem. In Proceedings of the tenth IEEE international conference on fuzzy systems, December 2001, pp. 292–295. Melbourne, Australia.
go back to reference Peng, J., & Song, K. (2003). Fuzzy flowshop scheduling models based on credibility measure. The IEEE International Conference on Fuzzy Systems, 2, 1423–1427. Peng, J., & Song, K. (2003). Fuzzy flowshop scheduling models based on credibility measure. The IEEE International Conference on Fuzzy Systems, 2, 1423–1427.
go back to reference Petrovic, D., & Duenas, A. (2006). A fuzzy logic based production scheduling/rescheduling in the presence of uncertain disruptions. Fuzzy Sets and Systems, 157, 2273–2285.MathSciNetMATHCrossRef Petrovic, D., & Duenas, A. (2006). A fuzzy logic based production scheduling/rescheduling in the presence of uncertain disruptions. Fuzzy Sets and Systems, 157, 2273–2285.MathSciNetMATHCrossRef
go back to reference Petrovic, D., Duenas, A., & Petrovic, S. (2007). Decision support tool for multi-objective job shop scheduling problems with linguistically quantified decision functions. Decision Support Systems, 43(4), 1527–1538.CrossRef Petrovic, D., Duenas, A., & Petrovic, S. (2007). Decision support tool for multi-objective job shop scheduling problems with linguistically quantified decision functions. Decision Support Systems, 43(4), 1527–1538.CrossRef
go back to reference Petrovic, S., & Fayad, C. (2004). A fuzzy shifting bottleneck hybridised with genetic algorithm for real-world job shop scheduling. In C. H. Antunes & L. C. Dias (Eds.), Proceedings of mini-EURO conference, managing uncertainty in decision support models, MUDSM 2004(22–24), September 2004, pp. 1–6. Portugal: Coimbra. Petrovic, S., & Fayad, C. (2004). A fuzzy shifting bottleneck hybridised with genetic algorithm for real-world job shop scheduling. In C. H. Antunes & L. C. Dias (Eds.), Proceedings of mini-EURO conference, managing uncertainty in decision support models, MUDSM 2004(22–24), September 2004, pp. 1–6. Portugal: Coimbra.
go back to reference Petrovic, S., & Song, X. (2006). A new approach to two-machine flowshop problem with uncertain processing times. Optimization and Engineering, 7, 329–342.MathSciNetMATHCrossRef Petrovic, S., & Song, X. (2006). A new approach to two-machine flowshop problem with uncertain processing times. Optimization and Engineering, 7, 329–342.MathSciNetMATHCrossRef
go back to reference Petrovic, S., Fayad, C., Petrovic, D., Burke, E., & Kendall, G. (2008). Fuzzy job shop scheduling with lot-sizing. Annals of Operations Research, 159, 275–292.MathSciNetMATHCrossRef Petrovic, S., Fayad, C., Petrovic, D., Burke, E., & Kendall, G. (2008). Fuzzy job shop scheduling with lot-sizing. Annals of Operations Research, 159, 275–292.MathSciNetMATHCrossRef
go back to reference Pinedo, M. L. (2008). Scheduling theory, algorithms, and systems (3rd ed.). New York: Springer.MATH Pinedo, M. L. (2008). Scheduling theory, algorithms, and systems (3rd ed.). New York: Springer.MATH
go back to reference Sakawa, M., & Kubota, R. (2000). Theory and methodology fuzzy programming for multiobjective job shop scheduling with fuzzy processing time and fuzzy duedate through genetic algorithms. European Journal of Operational Research, 120, 393–407.MathSciNetMATHCrossRef Sakawa, M., & Kubota, R. (2000). Theory and methodology fuzzy programming for multiobjective job shop scheduling with fuzzy processing time and fuzzy duedate through genetic algorithms. European Journal of Operational Research, 120, 393–407.MathSciNetMATHCrossRef
go back to reference Sakawa, M., & Kubota, R. (2001). Two-objective fuzzy job shop scheduling through genetic algorithms. Electronics and Communications in Japan, 84(4), 60–67.CrossRef Sakawa, M., & Kubota, R. (2001). Two-objective fuzzy job shop scheduling through genetic algorithms. Electronics and Communications in Japan, 84(4), 60–67.CrossRef
go back to reference Sakawa, M., & Mori, T. (1999). An efficient genetic algorithm for job-shop scheduling problems with fuzzy processing time and fuzzy due-date. Computers & Industrial Engineering, 36, 325–341.CrossRef Sakawa, M., & Mori, T. (1999). An efficient genetic algorithm for job-shop scheduling problems with fuzzy processing time and fuzzy due-date. Computers & Industrial Engineering, 36, 325–341.CrossRef
go back to reference Song, X. Y., Zhu, Y. L., Yin, C. W., & Li, F. M. (2006). Study on the combination of genetic algorithms and ant colony algorithms for solving fuzzy job shop scheduling problems. In Proceedings of the IMACS multi-conferences on computational engineering in systems applications, Beijing, pp. 1904–1909. Song, X. Y., Zhu, Y. L., Yin, C. W., & Li, F. M. (2006). Study on the combination of genetic algorithms and ant colony algorithms for solving fuzzy job shop scheduling problems. In Proceedings of the IMACS multi-conferences on computational engineering in systems applications, Beijing, pp. 1904–1909.
go back to reference Sriskandarajah, C., & Sethi, S. P. (1989). Scheduling algorithms for flexible flowshops: Worst and average case performance. European Journal of Operational Research, 43, 143–160.MathSciNetMATHCrossRef Sriskandarajah, C., & Sethi, S. P. (1989). Scheduling algorithms for flexible flowshops: Worst and average case performance. European Journal of Operational Research, 43, 143–160.MathSciNetMATHCrossRef
go back to reference Subramaniam, V., Ramesh, T., & Raheja, A. S. (2002). Exploiting the flexibility of multiple job routes in a dynamic job shop. Studies in Informatics and Control Journal, 11(2), 131–143. Subramaniam, V., Ramesh, T., & Raheja, A. S. (2002). Exploiting the flexibility of multiple job routes in a dynamic job shop. Studies in Informatics and Control Journal, 11(2), 131–143.
go back to reference Sun, K.-T. (1998). Job scheduling using ranking fuzzy number method. In L. C. Jain & R. K. Jab (Eds.), Second international conference on knowledge-based intelligent electronic system, April 1998. Adelaide. Sun, K.-T. (1998). Job scheduling using ranking fuzzy number method. In L. C. Jain & R. K. Jab (Eds.), Second international conference on knowledge-based intelligent electronic system, April 1998. Adelaide.
go back to reference Sun, K. T. (1999). A two dimensional fuzzy ranking approach to job scheduling problems. In Proceedings of the 1998 IEEE international conference on fuzzy systems, May 1998 Anchorage, Alaska, USA, pp. 873–878. Sun, K. T. (1999). A two dimensional fuzzy ranking approach to job scheduling problems. In Proceedings of the 1998 IEEE international conference on fuzzy systems, May 1998 Anchorage, Alaska, USA, pp. 873–878.
go back to reference Sung, S. C., & Vlach, M. (2003). Single machine scheduling to minimize the number of late jobs under uncertainty. Fuzzy Sets and Systems, 139(2), 421–430.MathSciNetMATHCrossRef Sung, S. C., & Vlach, M. (2003). Single machine scheduling to minimize the number of late jobs under uncertainty. Fuzzy Sets and Systems, 139(2), 421–430.MathSciNetMATHCrossRef
go back to reference Tanaka, K., & Vlach, M. (1997). Single machine scheduling with fuzzy due dates. In Proceedings of the seventh IFSA world congress (pp. 195–199). Prague: Academia. Tanaka, K., & Vlach, M. (1997). Single machine scheduling with fuzzy due dates. In Proceedings of the seventh IFSA world congress (pp. 195–199). Prague: Academia.
go back to reference Tavakkoli-Moghaddam, R., Javadi, B., & Safaei, N. (2006). Solving a mixed-integer model of a single machine scheduling problem by a fuzzy goal programming pproach. WSEAS Transactions on Business and Economics, 3(2), 45–52. Tavakkoli-Moghaddam, R., Javadi, B., & Safaei, N. (2006). Solving a mixed-integer model of a single machine scheduling problem by a fuzzy goal programming pproach. WSEAS Transactions on Business and Economics, 3(2), 45–52.
go back to reference Tavakkoli-Moghaddam, R., Javadi, B., Jolai, F., & Ghodratnama, A. (2010). The use of a fuzzy multi-objective linear programming for solving a multi-objective single-machine scheduling problem. Applied Soft Computing, 10, 919–925.CrossRef Tavakkoli-Moghaddam, R., Javadi, B., Jolai, F., & Ghodratnama, A. (2010). The use of a fuzzy multi-objective linear programming for solving a multi-objective single-machine scheduling problem. Applied Soft Computing, 10, 919–925.CrossRef
go back to reference Temiz, I., & Erol, S. (2004). Fuzzy branch-and-bound algorithm for flowshop scheduling. Journal of Intelligent Manufacturing, 15, 449–454.CrossRef Temiz, I., & Erol, S. (2004). Fuzzy branch-and-bound algorithm for flowshop scheduling. Journal of Intelligent Manufacturing, 15, 449–454.CrossRef
go back to reference Torabi, S. A., Sahebjamnia, N., Mansouri, S. A., & Aramon Bajestani, M. (2013). A particle swarm optimization for a fuzzy multi-objective unrelated parallel machines scheduling problem. Applied Soft Computing, 13(12), 4750–4762.CrossRef Torabi, S. A., Sahebjamnia, N., Mansouri, S. A., & Aramon Bajestani, M. (2013). A particle swarm optimization for a fuzzy multi-objective unrelated parallel machines scheduling problem. Applied Soft Computing, 13(12), 4750–4762.CrossRef
go back to reference Tsujimura, Y., Gen, M., & Kubota, E. (1995). Flowshop scheduling with fuzzy processing time using genetic algorithms. In Proceedings of 11th fuzzy system symposium, Okinawa, Japan, July 12–14, pp. 249–252. Tsujimura, Y., Gen, M., & Kubota, E. (1995). Flowshop scheduling with fuzzy processing time using genetic algorithms. In Proceedings of 11th fuzzy system symposium, Okinawa, Japan, July 12–14, pp. 249–252.
go back to reference Türksen, I. B., Yurtsever, T., & Demirli, K. (1993). Fuzzy expert system shell for scheduling. Proceedings, SPIE, 1993, 308–319.CrossRef Türksen, I. B., Yurtsever, T., & Demirli, K. (1993). Fuzzy expert system shell for scheduling. Proceedings, SPIE, 1993, 308–319.CrossRef
go back to reference Wang, B., & Yang, Z. (2007). A particle swarm optimization algorithm for robust flowshop scheduling with fuzzy processing times. In Proceedings of the IEEE, international conference on automation and logistics, August 2007, Jinan, China. Wang, B., & Yang, Z. (2007). A particle swarm optimization algorithm for robust flowshop scheduling with fuzzy processing times. In Proceedings of the IEEE, international conference on automation and logistics, August 2007, Jinan, China.
go back to reference Wang, C., Wanga, D., Ip, W. H., & Yuen, D. W. (2002). The single machine ready time scheduling problem with fuzzy processing times. Fuzzy Sets and Systems, 127, 117–129.MathSciNetMATHCrossRef Wang, C., Wanga, D., Ip, W. H., & Yuen, D. W. (2002). The single machine ready time scheduling problem with fuzzy processing times. Fuzzy Sets and Systems, 127, 117–129.MathSciNetMATHCrossRef
go back to reference Wang, L., Du, G., & Zhang, Q. (2006). A FLC-GA for fuzzy flowshop scheduling problem with distinct due window. In Proceedings of the 6th world congress on intelligent control and automation, June, 2006, Dalian, China. Wang, L., Du, G., & Zhang, Q. (2006). A FLC-GA for fuzzy flowshop scheduling problem with distinct due window. In Proceedings of the 6th world congress on intelligent control and automation, June, 2006, Dalian, China.
go back to reference Wang, S., Wang, L., Xu, Y., & Liu, M. (2013a). An effective estimation of distribution algorithm for the flexible jobshop scheduling problem with fuzzy processing time. International Journal of Production Research. doi:10.1080/00207543.2013.765077. Wang, S., Wang, L., Xu, Y., & Liu, M. (2013a). An effective estimation of distribution algorithm for the flexible jobshop scheduling problem with fuzzy processing time. International Journal of Production Research. doi:10.​1080/​00207543.​2013.​765077.
go back to reference Wang, L., Zhou, G., Xu, Y., & Liu, M. (2013b). A hybrid artificial bee colony algorithm for the fuzzy flexible jobshop scheduling problem. International Journal of Production Research. doi:10.1080/00207543.2012.754549. Wang, L., Zhou, G., Xu, Y., & Liu, M. (2013b). A hybrid artificial bee colony algorithm for the fuzzy flexible jobshop scheduling problem. International Journal of Production Research. doi:10.​1080/​00207543.​2012.​754549.
go back to reference Wu, C., & Gu, X. (2004). A genetic algorithm for flowshop scheduling with fuzzy processing time and due date. In Proceedings of the 5th world congress on intelligent control and automation, June, 2004, Hangzhou, China. Wu, C., & Gu, X. (2004). A genetic algorithm for flowshop scheduling with fuzzy processing time and due date. In Proceedings of the 5th world congress on intelligent control and automation, June, 2004, Hangzhou, China.
go back to reference Wu, C.-S., Li, D.-C., & Tsai, T.-I. (2006). Applying the fuzzy ranking method to the shifting bottleneck procedure to solve scheduling problems of uncertainty. International Journal Advanced Manufacturing Technology, 31(1–2), 98–106.CrossRef Wu, C.-S., Li, D.-C., & Tsai, T.-I. (2006). Applying the fuzzy ranking method to the shifting bottleneck procedure to solve scheduling problems of uncertainty. International Journal Advanced Manufacturing Technology, 31(1–2), 98–106.CrossRef
go back to reference Xanthopoulos, A. S., Koulouriotis, D. E., Tourassis, V. D., & Emiris, D. M. (2013). Intelligent controllers for bi-objective dynamic scheduling on a single machine with sequence-dependent setups. Applied Soft Computing, 13(12), 4704–4717.CrossRef Xanthopoulos, A. S., Koulouriotis, D. E., Tourassis, V. D., & Emiris, D. M. (2013). Intelligent controllers for bi-objective dynamic scheduling on a single machine with sequence-dependent setups. Applied Soft Computing, 13(12), 4704–4717.CrossRef
go back to reference Xie, Y., Xie, J.-Y., & Huang, Q.-H. (2005). Single machine scheduling problem with fuzzy due dates and fuzzy precedence. Journal of Shanghai University, 9(5), 450–454.CrossRef Xie, Y., Xie, J.-Y., & Huang, Q.-H. (2005). Single machine scheduling problem with fuzzy due dates and fuzzy precedence. Journal of Shanghai University, 9(5), 450–454.CrossRef
go back to reference Xu, Z., & Gu, X. (2006). A hybrid algorithm for scheduling problems of flowshop with uncertain processing time. In Proceedings of the 6th world congress on intelligent control and automation, June 2006, Dalian, China. Xu, Z., & Gu, X. (2006). A hybrid algorithm for scheduling problems of flowshop with uncertain processing time. In Proceedings of the 6th world congress on intelligent control and automation, June 2006, Dalian, China.
go back to reference Yao, J.-S., & Lin, F.-T. (2002). Constructing a fuzzy flowshop sequencing model based on statistical data. International Journal of Approximate Reasoning, 29, 215–234.MathSciNetMATHCrossRef Yao, J.-S., & Lin, F.-T. (2002). Constructing a fuzzy flowshop sequencing model based on statistical data. International Journal of Approximate Reasoning, 29, 215–234.MathSciNetMATHCrossRef
go back to reference Yimer, A. D., & Demirli, K. (2009). Fuzzy scheduling of job orders in a two-stage flowshop with batch-processing machines. International Journal of Approximate Reasoning, 50, 117–137.MathSciNetMATHCrossRef Yimer, A. D., & Demirli, K. (2009). Fuzzy scheduling of job orders in a two-stage flowshop with batch-processing machines. International Journal of Approximate Reasoning, 50, 117–137.MathSciNetMATHCrossRef
go back to reference Yun, Y. S. (2002). Genetic algorithm with fuzzy logic controller for preemptive and non-preemptive job-shop scheduling problems. Computers & Industrial Engineering, 43, 623–644.CrossRef Yun, Y. S. (2002). Genetic algorithm with fuzzy logic controller for preemptive and non-preemptive job-shop scheduling problems. Computers & Industrial Engineering, 43, 623–644.CrossRef
go back to reference Zhang, X., Denga, Y., Chan, F. T. S., Xu, P., Mahadevan, S., & Hu, Y. (2013). IFSJSP: A novel methodology for the Job-shop scheduling problem based on intuitionistic fuzzy sets. International Journal of Production Research, 51(17), 5100–5119.CrossRef Zhang, X., Denga, Y., Chan, F. T. S., Xu, P., Mahadevan, S., & Hu, Y. (2013). IFSJSP: A novel methodology for the Job-shop scheduling problem based on intuitionistic fuzzy sets. International Journal of Production Research, 51(17), 5100–5119.CrossRef
go back to reference Zheng, L., & Gu, X. (2004a). Fuzzy FIS flowshop production scheduling with no-wait restrictions. In Proceedings of the 5th world congress on intelligent control and automation, Hangzhou, China. Zheng, L., & Gu, X. (2004a). Fuzzy FIS flowshop production scheduling with no-wait restrictions. In Proceedings of the 5th world congress on intelligent control and automation, Hangzhou, China.
go back to reference Zheng, L., & Gu, X. (2004b). Fuzzy production scheduling in no-wait flowshop to minimize the makespan with e/t constraints using SA. In Proceedings of the 5th world congress on intelligent control and automation, June 2004, Hangzhou, China. Zheng, L., & Gu, X. (2004b). Fuzzy production scheduling in no-wait flowshop to minimize the makespan with e/t constraints using SA. In Proceedings of the 5th world congress on intelligent control and automation, June 2004, Hangzhou, China.
go back to reference Zheng, Y.-L., Li, Y.-X., & Lei, D.-M. (2012). Multi-objective swarm-based neighborhood search for fuzzy flexible job shop scheduling. The International Journal of Advanced Manufacturing Technology, 60(9–12), 1063–1069.CrossRef Zheng, Y.-L., Li, Y.-X., & Lei, D.-M. (2012). Multi-objective swarm-based neighborhood search for fuzzy flexible job shop scheduling. The International Journal of Advanced Manufacturing Technology, 60(9–12), 1063–1069.CrossRef
go back to reference Zhou, Y., & Gu, X. (2009). Research on no-wait flowshop scheduling problem with fuzzy due date based on evolution games. In ICCSIT, 2nd IEEE international conference on computer science and information technology, pp. 495–499. Zhou, Y., & Gu, X. (2009). Research on no-wait flowshop scheduling problem with fuzzy due date based on evolution games. In ICCSIT, 2nd IEEE international conference on computer science and information technology, pp. 495–499.
Metadata
Title
Survey on fuzzy shop scheduling
Author
J. Behnamian
Publication date
03-11-2015
Publisher
Springer US
Published in
Fuzzy Optimization and Decision Making / Issue 3/2016
Print ISSN: 1568-4539
Electronic ISSN: 1573-2908
DOI
https://doi.org/10.1007/s10700-015-9225-5

Other articles of this Issue 3/2016

Fuzzy Optimization and Decision Making 3/2016 Go to the issue

Premium Partner