Skip to main content
Top

2012 | OriginalPaper | Chapter

Synchronized Two-Stage Lot Sizing and Scheduling Problem in Automotive Industry

Authors : Fadime Uney-Yuksektepe, Rifat Gurcan Ozdemir

Published in: Operations Research Proceedings 2011

Publisher: Springer Berlin Heidelberg

Activate our intelligent search to find suitable subject content or patents.

search-config
loading …

This study proposes a mixed-integer linear programming model to solve the synchronized two-stage lot sizing and scheduling problem with setup times and costs. The main motivation behind this study is based on the need of improvement in the inventory control and management system of a supplier that serves to automotive industry. The supplier considered in this study has synchronized two-stage production system which involves three parallel injection machines in the first stage and a single spray dying station in the second stage. In order to achieve synchronization of the production between these stages and improve the inventory levels, a mixed-integer linear programming model is proposed. By the help of developed model, synchronization between the parallel injection machines and the single spray dying station with minimum total cost is obtained. Optimal lot sizes for each stage and optimal schedules of these lot sizes are determined by the developed model as well.

Dont have a licence yet? Then find out more about our products and how to get one now:

Springer Professional "Wirtschaft+Technik"

Online-Abonnement

Mit Springer Professional "Wirtschaft+Technik" erhalten Sie Zugriff auf:

  • über 102.000 Bücher
  • über 537 Zeitschriften

aus folgenden Fachgebieten:

  • Automobil + Motoren
  • Bauwesen + Immobilien
  • Business IT + Informatik
  • Elektrotechnik + Elektronik
  • Energie + Nachhaltigkeit
  • Finance + Banking
  • Management + Führung
  • Marketing + Vertrieb
  • Maschinenbau + Werkstoffe
  • Versicherung + Risiko

Jetzt Wissensvorsprung sichern!

Springer Professional "Wirtschaft"

Online-Abonnement

Mit Springer Professional "Wirtschaft" erhalten Sie Zugriff auf:

  • über 67.000 Bücher
  • über 340 Zeitschriften

aus folgenden Fachgebieten:

  • Bauwesen + Immobilien
  • Business IT + Informatik
  • Finance + Banking
  • Management + Führung
  • Marketing + Vertrieb
  • Versicherung + Risiko




Jetzt Wissensvorsprung sichern!

Metadata
Title
Synchronized Two-Stage Lot Sizing and Scheduling Problem in Automotive Industry
Authors
Fadime Uney-Yuksektepe
Rifat Gurcan Ozdemir
Copyright Year
2012
Publisher
Springer Berlin Heidelberg
DOI
https://doi.org/10.1007/978-3-642-29210-1_76