Skip to main content
Top

2021 | OriginalPaper | Chapter

The Relationships of the Bid/No Bid Decision Factors Considered Among Local Contactors from Different Countries

Authors : Guanghua Li, Chuan Chen, Jing Dai

Published in: Proceedings of the 24th International Symposium on Advancement of Construction Management and Real Estate

Publisher: Springer Singapore

Activate our intelligent search to find suitable subject content or patents.

search-config
loading …

Abstract

Identification of the bid/no bid decision factors is an essential step in the decision. The objective of this study is to reveal the relationships of factors considered by local contractors from different countries, which can be more helpful to identify potentially important factors in different countries. One hypothesis is addressed that, the importance of factors perceived by local contractors from one country has a high relationship with that considered by local contractors from other countries. According to the rankings of identical factors in previous studies, the hypothesis is validated by the Spearman rank-order correlation test and the hierarchical cluster analysis. The outcome indicates that the hypothesis is not validated, while the importance of factors considered among local contractors from developed or developing countries are highly related, respectively. The outcome will be helpful to develop a high related list of potentially important factors in a country based on the factors identified in those countries with high homogeneity, which will be of interest to both academics and practitioners.

Dont have a licence yet? Then find out more about our products and how to get one now:

Springer Professional "Wirtschaft+Technik"

Online-Abonnement

Mit Springer Professional "Wirtschaft+Technik" erhalten Sie Zugriff auf:

  • über 102.000 Bücher
  • über 537 Zeitschriften

aus folgenden Fachgebieten:

  • Automobil + Motoren
  • Bauwesen + Immobilien
  • Business IT + Informatik
  • Elektrotechnik + Elektronik
  • Energie + Nachhaltigkeit
  • Finance + Banking
  • Management + Führung
  • Marketing + Vertrieb
  • Maschinenbau + Werkstoffe
  • Versicherung + Risiko

Jetzt Wissensvorsprung sichern!

Springer Professional "Wirtschaft"

Online-Abonnement

Mit Springer Professional "Wirtschaft" erhalten Sie Zugriff auf:

  • über 67.000 Bücher
  • über 340 Zeitschriften

aus folgenden Fachgebieten:

  • Bauwesen + Immobilien
  • Business IT + Informatik
  • Finance + Banking
  • Management + Führung
  • Marketing + Vertrieb
  • Versicherung + Risiko




Jetzt Wissensvorsprung sichern!

Springer Professional "Technik"

Online-Abonnement

Mit Springer Professional "Technik" erhalten Sie Zugriff auf:

  • über 67.000 Bücher
  • über 390 Zeitschriften

aus folgenden Fachgebieten:

  • Automobil + Motoren
  • Bauwesen + Immobilien
  • Business IT + Informatik
  • Elektrotechnik + Elektronik
  • Energie + Nachhaltigkeit
  • Maschinenbau + Werkstoffe




 

Jetzt Wissensvorsprung sichern!

Literature
1.
go back to reference Mosley, J. C., & Bubshait, A. A. (2015). Performance evaluation of international contractors in Saudi Arabia. Journal of Professional Issues in Engineering Education and Practice, 142(1), 1–7. Mosley, J. C., & Bubshait, A. A. (2015). Performance evaluation of international contractors in Saudi Arabia. Journal of Professional Issues in Engineering Education and Practice, 142(1), 1–7.
2.
go back to reference Frame, J. (2002). The new project management. San Francisco: Jossey-Bass. Frame, J. (2002). The new project management. San Francisco: Jossey-Bass.
3.
go back to reference Jarkas, A. M., Mubarak, S. A., & Kadri, C. Y. (2014). Critical factors determining bid/no bid decisions of contractors in Qatar. Journal of Management in Engineering, 30(4), 05014007.CrossRef Jarkas, A. M., Mubarak, S. A., & Kadri, C. Y. (2014). Critical factors determining bid/no bid decisions of contractors in Qatar. Journal of Management in Engineering, 30(4), 05014007.CrossRef
4.
go back to reference Bagies, A., & Fortune, C. (2006). Bid/No-bid decision modelling for construction projects. In Association of Researchers in Construction Management, ARCOM 2006—Proceedings 22nd Annual ARCOM Conference, September (Vol. 1, pp. 511–521). Bagies, A., & Fortune, C. (2006). Bid/No-bid decision modelling for construction projects. In Association of Researchers in Construction Management, ARCOM 2006—Proceedings 22nd Annual ARCOM Conference, September (Vol. 1, pp. 511–521).
5.
go back to reference Wanous, M., Boussabaine, H. A., & Lewis, J. (2003). A neural network bid/no bid model: The case for contractors in Syria. Construction Management and Economics, 21(7), 737–744.CrossRef Wanous, M., Boussabaine, H. A., & Lewis, J. (2003). A neural network bid/no bid model: The case for contractors in Syria. Construction Management and Economics, 21(7), 737–744.CrossRef
6.
go back to reference Bageis, A. S., & Fortune, C. (2009). Factors affecting the bid/no bid decision in the Saudi Arabian construction contractors. Construction Management and Economics, 27(1), 53–71.CrossRef Bageis, A. S., & Fortune, C. (2009). Factors affecting the bid/no bid decision in the Saudi Arabian construction contractors. Construction Management and Economics, 27(1), 53–71.CrossRef
7.
go back to reference Ahmad, I., & Minkarah, I. (1988). Questionnaire survey on bidding in construction. Journal of Management in Engineering, 4(3), 229–243.CrossRef Ahmad, I., & Minkarah, I. (1988). Questionnaire survey on bidding in construction. Journal of Management in Engineering, 4(3), 229–243.CrossRef
8.
go back to reference Hassanein, A. A. G. (1996). Factors affecting the bidding behaviour of contractors in Egypt. Building Research and Information, 24(4), 228–236.CrossRef Hassanein, A. A. G. (1996). Factors affecting the bidding behaviour of contractors in Egypt. Building Research and Information, 24(4), 228–236.CrossRef
9.
go back to reference Egemen, M., & Mohamed, A. (2007). A framework for contractors to reach strategically correct bid/no bid and mark-up size decisions. Building and Environment, 42, 1373–1385.CrossRef Egemen, M., & Mohamed, A. (2007). A framework for contractors to reach strategically correct bid/no bid and mark-up size decisions. Building and Environment, 42, 1373–1385.CrossRef
10.
go back to reference Morteza, S.-G., & Nicholas, C. (2016). Critical factors influencing the bid/no bid decision in the Australian construction industry. Construction Innovation, 16(2), 127–157.CrossRef Morteza, S.-G., & Nicholas, C. (2016). Critical factors influencing the bid/no bid decision in the Australian construction industry. Construction Innovation, 16(2), 127–157.CrossRef
11.
go back to reference Aznar, B., Pellicer, E., Davis, S., & Ballesteros-Pérez, P. (2017). Factors affecting contractor’s bidding success for international infrastructure projects in Australia. Journal of Civil Engineering and Management, 23(7), 880–889.CrossRef Aznar, B., Pellicer, E., Davis, S., & Ballesteros-Pérez, P. (2017). Factors affecting contractor’s bidding success for international infrastructure projects in Australia. Journal of Civil Engineering and Management, 23(7), 880–889.CrossRef
12.
go back to reference Hwang, J. S., & Kim, Y. S. (2016). A bid decision-making model in the initial bidding phase for overseas construction projects. KSCE Journal of Civil Engineering, 20(4), 1189–1200.CrossRef Hwang, J. S., & Kim, Y. S. (2016). A bid decision-making model in the initial bidding phase for overseas construction projects. KSCE Journal of Civil Engineering, 20(4), 1189–1200.CrossRef
13.
go back to reference Wanous, M., Boussabaine, A. H., & Lewis, J. (1998). Tendering factors considered by Syrian contractors. In ARCOM, 14th Oxford. Annual Conference Proceedings, September (Vol. 2, pp. 535–543). Wanous, M., Boussabaine, A. H., & Lewis, J. (1998). Tendering factors considered by Syrian contractors. In ARCOM, 14th Oxford. Annual Conference Proceedings, September (Vol. 2, pp. 535–543).
14.
go back to reference Odusote, O. O., & Fellows, R. F. (1992). An examination of the importance of resource considerations when contractors make project selection decisions. Construction Management and Economics, 10(2), 137–151.CrossRef Odusote, O. O., & Fellows, R. F. (1992). An examination of the importance of resource considerations when contractors make project selection decisions. Construction Management and Economics, 10(2), 137–151.CrossRef
15.
go back to reference Shash, A. A. (1993). Factors considered in tendering decisions by top UK contractors. Construction Management and Economics, 11(2), 111–118.CrossRef Shash, A. A. (1993). Factors considered in tendering decisions by top UK contractors. Construction Management and Economics, 11(2), 111–118.CrossRef
16.
go back to reference Fayek, A., Ghoshal, I., & AbouRizk, S. (1999). A survey of the bidding practices of Canadian civil engineering construction contractors. Canadian Journal of Civil Engineering, 26(1), 13–25.CrossRef Fayek, A., Ghoshal, I., & AbouRizk, S. (1999). A survey of the bidding practices of Canadian civil engineering construction contractors. Canadian Journal of Civil Engineering, 26(1), 13–25.CrossRef
17.
go back to reference Cheng, M.-Y., Hsiang, C.-C., Tsai, H.-C., & Do, H.-L. (2011). Bidding decision making for construction company using a multi-criteria prospect model. Journal of Civil Engineering and Management, 40(2), 154–157. Cheng, M.-Y., Hsiang, C.-C., Tsai, H.-C., & Do, H.-L. (2011). Bidding decision making for construction company using a multi-criteria prospect model. Journal of Civil Engineering and Management, 40(2), 154–157.
18.
go back to reference El-Mashaleh, M. S. (2013). Empirical framework for making the bid/no-bid decision. Journal of Management in Engineering, 29(July), 200–205.CrossRef El-Mashaleh, M. S. (2013). Empirical framework for making the bid/no-bid decision. Journal of Management in Engineering, 29(July), 200–205.CrossRef
19.
go back to reference Leśniak, A., & Plebankiewicz, E. (2015). Modeling the decision-making process concerning participation in construction bidding. Journal of Management in Engineering, 31(2), 04014032.CrossRef Leśniak, A., & Plebankiewicz, E. (2015). Modeling the decision-making process concerning participation in construction bidding. Journal of Management in Engineering, 31(2), 04014032.CrossRef
20.
go back to reference Olatunji, O. A., Aje, O. I., & Makanjuola, S. (2017). Bid or no-bid decision factors of indigenous contractors in Nigeria. Engineering, Construction and Architectural Management, 24(3), 378–392.CrossRef Olatunji, O. A., Aje, O. I., & Makanjuola, S. (2017). Bid or no-bid decision factors of indigenous contractors in Nigeria. Engineering, Construction and Architectural Management, 24(3), 378–392.CrossRef
21.
go back to reference Marzouk, M., & Mohamed, E. (2017). Modeling bid/no bid decisions using fuzzy fault tree. Construction Innovation, 18(1), 99–108. Marzouk, M., & Mohamed, E. (2017). Modeling bid/no bid decisions using fuzzy fault tree. Construction Innovation, 18(1), 99–108.
22.
go back to reference Fellows, R., & Liu, A. (2015). Research methods for construction. New York: Wiley. Fellows, R., & Liu, A. (2015). Research methods for construction. New York: Wiley.
23.
go back to reference Bageis, A.S. & Fortune, C. (2009). Factors affecting the bid/no bid decision in the Saudi Arabian construction contractors. Construction Management and Economics, 27(1), 53–71. Bageis, A.S. & Fortune, C. (2009). Factors affecting the bid/no bid decision in the Saudi Arabian construction contractors. Construction Management and Economics, 27(1), 53–71.
24.
go back to reference Han, S. H., Park, S. H., Kim, D. Y., Kim, H., & Kang, Y. W. (2007). Causes of bad profit in overseas construction projects. Journal of Construction Engineering and Management, 133(12), 932–943.CrossRef Han, S. H., Park, S. H., Kim, D. Y., Kim, H., & Kang, Y. W. (2007). Causes of bad profit in overseas construction projects. Journal of Construction Engineering and Management, 133(12), 932–943.CrossRef
25.
go back to reference Pallant, J. (2009). SPSS Survival manual: A step by step guide to data analysis using SPSS for Windows. UK: Allen and Unwin, Open University Press. Pallant, J. (2009). SPSS Survival manual: A step by step guide to data analysis using SPSS for Windows. UK: Allen and Unwin, Open University Press.
26.
go back to reference Zhao, Z. Y., Xu, K., Zuo, J., & Tang, C. (2017). Developing the international construction contracting market: Enterprise niche approach. Journal of Management in Engineering ASCE, 33(1), 04016027. Zhao, Z. Y., Xu, K., Zuo, J., & Tang, C. (2017). Developing the international construction contracting market: Enterprise niche approach. Journal of Management in Engineering ASCE, 33(1), 04016027.
27.
go back to reference Abdelrazig, A. A. (1995). Computerized AHP model for solving bid/no-bid decision problem. King Fahd University of Petroleum & Minerals. Abdelrazig, A. A. (1995). Computerized AHP model for solving bid/no-bid decision problem. King Fahd University of Petroleum & Minerals.
Metadata
Title
The Relationships of the Bid/No Bid Decision Factors Considered Among Local Contactors from Different Countries
Authors
Guanghua Li
Chuan Chen
Jing Dai
Copyright Year
2021
Publisher
Springer Singapore
DOI
https://doi.org/10.1007/978-981-15-8892-1_74